FHWA NBI 2024 Inspection record Public-domain dataset

ST 9 /ST12/PARK

Carrying ST 9 /ST12/PARK over WATER BEAVER BROOK

1MI W. OF ST. 122, Worcester, Massachusetts

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
29 t Inventory load rating

Bridge Snapshot: ST 9 /ST12/PARK

The ST 9 /ST12/PARK bridge in Worcester, Massachusetts carries ST 9 /ST12/PARK over WATER BEAVER BROOK. It was built in 1910, making it 116 years old today. The structure is built primarily of concrete and spans 1 section, stretching 11.3 meters (37 feet) end to end. Daily traffic averages 36,400 vehicles, placing it in the heavily-trafficked tier of Massachusetts bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 28.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ST 9 /ST12/PARK compares

▼ 12.4
Load rating vs Massachusetts average (41.2 t)
Bottom 19%
Lower load rating than 81% of Massachusetts bridges
1,016
Bridges in Worcester · 74 in Poor condition
ST 9 /ST12/PARK 28.8 t
Massachusetts average 41.2 t

Live comparison across Massachusetts.

Historical Sufficiency Rating

PlainBridge-computed
77.7 / 100 - historical 50–79.9 band
Structural adequacy /55
42.8
Serviceability /30
29.0
Essentiality /15
8.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
28.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1910
Material
Concrete
Number of Spans
1
Structure Length
11.3 m (37 ft)
Deck Width
37.5 m (123 ft)
Owner
State Highway Agency
Avg Daily Traffic
36,400 vehicles/day
Structure Number
W440721L3DOTNBI

Condition Analysis

  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether ST 9 /ST12/PARK is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ST 9 /ST12/PARK against other structures in Worcester and across Massachusetts. Massachusetts bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ST 9 /ST12/PARK?

ST 9 /ST12/PARK in Worcester, Massachusetts, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is ST 9 /ST12/PARK inspected?

ST 9 /ST12/PARK's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 36,400 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ST 9 /ST12/PARK is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ST 9 /ST12/PARK?

ST 9 /ST12/PARK has an NBI inventory load rating of 28.8 metric tons.

Who is responsible for maintaining ST 9 /ST12/PARK?

ST 9 /ST12/PARK is owned and maintained by State Highway Agency.

How old is ST 9 /ST12/PARK and does age affect safety?

ST 9 /ST12/PARK was built in 1910, making it 116 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.