HWY GOLDSBRY ST
Carrying HWY GOLDSBRY ST over RR P&W/B&M/TNL
FROM SCHOOL STREET NORTH, Worcester, Massachusetts
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: HWY GOLDSBRY ST
The HWY GOLDSBRY ST bridge in Worcester, Massachusetts carries HWY GOLDSBRY ST over RR P&W/B&M/TNL. It was built in 1953, making it 73 years old today. The structure is built primarily of steel and spans 2 sections, stretching 12.8 meters (42 feet) end to end. Daily traffic averages 9,619 vehicles, placing it in the moderately-trafficked tier of Massachusetts bridges. It is owned and maintained by State Highway Agency.
The latest FHWA inspection records show culvert at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 34.6 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How HWY GOLDSBRY ST compares
Live comparison across Massachusetts.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1953
- Material
- Steel
- Number of Spans
- 2
- Structure Length
- 12.8 m (42 ft)
- Deck Width
- 30.4 m (100 ft)
- Owner
- State Highway Agency
- Avg Daily Traffic
- 9,619 vehicles/day
- Structure Number
- W44078239DOT634
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether HWY GOLDSBRY ST is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare HWY GOLDSBRY ST against other structures in Worcester and across Massachusetts. Massachusetts bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for HWY GOLDSBRY ST?
HWY GOLDSBRY ST in Worcester, Massachusetts on the FHWA's 0–9 scale.
How often is HWY GOLDSBRY ST inspected?
HWY GOLDSBRY ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 9,619 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. HWY GOLDSBRY ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for HWY GOLDSBRY ST?
HWY GOLDSBRY ST has an NBI inventory load rating of 34.6 metric tons.
Who is responsible for maintaining HWY GOLDSBRY ST?
HWY GOLDSBRY ST is owned and maintained by State Highway Agency.
How old is HWY GOLDSBRY ST and does age affect safety?
HWY GOLDSBRY ST was built in 1953, making it 73 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.