FHWA NBI 2024 Inspection record Public-domain dataset

IRR BIA RTE 98

Carrying IRR BIA RTE 98 over SAN POIL RIVER

16 KM SOUTH OF REPUBLIC, Ferry, Washington

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
31 t Inventory load rating Lower than 51% of rated Washington bridges

IRR BIA RTE 98 in Ferry, Washington sits above 49% of rated Washington bridges on inventory load rating (31 t), while its 1959 build year is earlier than 70% of Ferry's recorded-year cohort (53 bridges).

IRR BIA RTE 98 in Ferry, Washington is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1959, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure WA:00000000000P311

INTERSTATE-ERA · CONCRETE · MULTI-SPAN · SUB-LED · LOCAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • SUB-LED Substructure-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: IRR BIA RTE 98

The IRR BIA RTE 98 bridge in Ferry, Washington carries IRR BIA RTE 98 over SAN POIL RIVER. It was built in 1959, making it 67 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 29.8 meters (98 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by Bureau of Indian Affairs.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How IRR BIA RTE 98 compares

▼ 2.7
Load rating vs Washington average (34.0 t; 8,455 of 8,474 rated)
53
Bridges in Ferry · 5 in Poor condition

Age against the county: built in 1959, earlier than 37 of Ferry's 53 bridges with a recorded construction year (70%), against a county median build year of 1973. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

IRR BIA RTE 98 31.3 t
Washington average (8,455 of 8,474 rated) 34.0 t

Live comparison across Washington bridges with a recorded inventory load rating (8,455 of 8,474 rated).

IRR BIA RTE 98 vs every rated Washington bridge

Inventory load rating (metric tons), FHWA NBI, this state

31 Top 51% higher than 49% of 8,455 bridges

rated Washington bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
31.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Ferry inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 53 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1959
Material
Concrete
Number of Spans
3
Structure Length
29.8 m (98 ft)
Deck Width
4.8 m (16 ft)
Owner
Bureau of Indian Affairs
Avg Daily Traffic
50 vehicles/day
Structure Number
00000000000P311

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether IRR BIA RTE 98 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IRR BIA RTE 98 against other structures in Ferry and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IRR BIA RTE 98?

IRR BIA RTE 98 in Ferry, Washington has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is IRR BIA RTE 98 inspected?

IRR BIA RTE 98's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IRR BIA RTE 98 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IRR BIA RTE 98?

IRR BIA RTE 98 has an NBI inventory load rating of 31.3 metric tons.

Who is responsible for maintaining IRR BIA RTE 98?

IRR BIA RTE 98 is owned and maintained by Bureau of Indian Affairs.

How old is IRR BIA RTE 98 and does age affect safety?

IRR BIA RTE 98 was built in 1959, making it 67 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.