FHWA NBI 2024 Inspection record Public-domain dataset

HOV ON/OFF RAMPS

Carrying HOV ON/OFF RAMPS over I-90

1.2 E JCT I-405, King, Washington

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
39 t Inventory load rating Higher than 70% of rated Washington bridges

HOV ON/OFF RAMPS in King, Washington sits above 70% of rated Washington bridges on inventory load rating (39 t), while its 2006 build year is earlier than 14% of King's recorded-year cohort (1,238 bridges).

HOV ON/OFF RAMPS in King, Washington is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2006, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure WA:0016879B0000000

POST-2000 · PRESTRESS · LONG-SPAN-RUN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 4 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: HOV ON/OFF RAMPS

The HOV ON/OFF RAMPS bridge in King, Washington carries HOV ON/OFF RAMPS over I-90. It was built in 2006, making it 20 years old today. The structure is built primarily of prestressed concrete continuous and spans 4 sections, stretching 16.2 meters (53 feet) end to end. Daily traffic averages 1,266 vehicles, placing it in the moderately-trafficked tier of Washington bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range.

How HOV ON/OFF RAMPS compares

▲ 5.0
Load rating vs Washington average (34.0 t; 8,455 of 8,474 rated)
1,238
Bridges in King · 53 in Poor condition

Age against the county: built in 2006, earlier than 171 of King's 1,238 bridges with a recorded construction year (14%), against a county median build year of 1972. This is one of the newer structures in its county.

HOV ON/OFF RAMPS 39.0 t
Washington average (8,455 of 8,474 rated) 34.0 t

Live comparison across Washington bridges with a recorded inventory load rating (8,455 of 8,474 rated).

HOV ON/OFF RAMPS vs every rated Washington bridge

Inventory load rating (metric tons), FHWA NBI, this state

39 Top 30% higher than 70% of 8,455 bridges

rated Washington bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
39.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

King inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,238 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2006
Material
Prestressed Concrete Continuous
Number of Spans
4
Structure Length
16.2 m (53 ft)
Deck Width
23.5 m (77 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,266 vehicles/day
Structure Number
0016879B0000000

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether HOV ON/OFF RAMPS is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HOV ON/OFF RAMPS against other structures in King and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HOV ON/OFF RAMPS?

HOV ON/OFF RAMPS in King, Washington has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is HOV ON/OFF RAMPS inspected?

HOV ON/OFF RAMPS's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,266 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HOV ON/OFF RAMPS is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HOV ON/OFF RAMPS?

HOV ON/OFF RAMPS has an NBI inventory load rating of 39.0 metric tons.

Who is responsible for maintaining HOV ON/OFF RAMPS?

HOV ON/OFF RAMPS is owned and maintained by State Highway Agency.

How old is HOV ON/OFF RAMPS and does age affect safety?

HOV ON/OFF RAMPS was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.