FHWA NBI 2024 Inspection record Public-domain dataset

MILLER HM PLC/3920

Carrying MILLER HM PLC/3920 over NEGRO CREEK

0.55 MI S BELSBY, Whitman, Washington

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
19 t Inventory load rating Lower than 86% of rated Washington bridges

MILLER HM PLC/3920 in Whitman, Washington sits above 14% of rated Washington bridges on inventory load rating (19 t), while its 1913 build year is earlier than 97% of Whitman's recorded-year cohort (347 bridges).

MILLER HM PLC/3920 in Whitman, Washington is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1913, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure WA:080960000000000

PRE-1950 · TIMBER · SINGLE-SPAN · DECK-LED · TRACE-ADT · LIGHT-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • TIMBER Wood or timber
  • SINGLE-SPAN Single span
  • DECK-LED Deck-led
  • TRACE-ADT Trace ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: MILLER HM PLC/3920

The MILLER HM PLC/3920 bridge in Whitman, Washington carries MILLER HM PLC/3920 over NEGRO CREEK. It was built in 1913, making it 113 years old today. It was last reconstructed in 1957, extending its service life. The structure is built primarily of wood or timber and spans 1 section, stretching 7.3 meters (24 feet) end to end. Daily traffic averages 5 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How MILLER HM PLC/3920 compares

▼ 15.0
Load rating vs Washington average (34.0 t; 8,455 of 8,474 rated)
347
Bridges in Whitman · 12 in Poor condition

Age against the county: built in 1913, earlier than 337 of Whitman's 347 bridges with a recorded construction year (97%), against a county median build year of 1975. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

MILLER HM PLC/3920 19.0 t
Washington average (8,455 of 8,474 rated) 34.0 t

Live comparison across Washington bridges with a recorded inventory load rating (8,455 of 8,474 rated).

MILLER HM PLC/3920 vs every rated Washington bridge

Inventory load rating (metric tons), FHWA NBI, this state

19 Top 86% higher than 14% of 8,455 bridges

rated Washington bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
19.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Whitman inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 347 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1913
Last Reconstructed
1957
Material
Wood or Timber
Number of Spans
1
Structure Length
7.3 m (24 ft)
Deck Width
6.1 m (20 ft)
Owner
County Highway Agency
Avg Daily Traffic
5 vehicles/day
Structure Number
080960000000000

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether MILLER HM PLC/3920 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MILLER HM PLC/3920 against other structures in Whitman and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MILLER HM PLC/3920?

MILLER HM PLC/3920 in Whitman, Washington has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is MILLER HM PLC/3920 inspected?

MILLER HM PLC/3920's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MILLER HM PLC/3920 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MILLER HM PLC/3920?

MILLER HM PLC/3920 has an NBI inventory load rating of 19.0 metric tons.

Who is responsible for maintaining MILLER HM PLC/3920?

MILLER HM PLC/3920 is owned and maintained by County Highway Agency.

How old is MILLER HM PLC/3920 and does age affect safety?

MILLER HM PLC/3920 was built in 1913, making it 113 years old and last reconstructed in 1957.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.