KOLISCH RD E
Carrying KOLISCH RD E over CARBON RIVER
00.6 E FAIRFAX RD, Pierce, Washington
Inventory: FHWA NBI 2024 · last ETL August 2026
FHWA NBI record, refreshed with each annual release.
KOLISCH RD E in Pierce, Washington sits above 7% of rated Washington bridges on inventory load rating (15 t), while its 1937 build year is earlier than 90% of Pierce's recorded-year cohort (472 bridges).
KOLISCH RD E in Pierce, Washington is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1937, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.
NBI record plate
Structure WA:084735000000000
PRE-1950 · TIMBER · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · LIGHT-LOAD · CAT-FAIR
- PRE-1950 Pre-1950
- TIMBER Wood or timber
- SINGLE-SPAN Single span
- TIED-CTRL Tied control
- LOCAL-ADT Local ADT
- LIGHT-LOAD Light load
- CAT-FAIR Fair
Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.
Bridge Snapshot: KOLISCH RD E
The KOLISCH RD E bridge in Pierce, Washington carries KOLISCH RD E over CARBON RIVER. It was built in 1937, making it 89 years old today. It was last reconstructed in 1966, extending its service life. The structure is built primarily of wood or timber and spans 1 section, stretching 45.7 meters (150 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.
How KOLISCH RD E compares
Age against the county: built in 1937, earlier than 425 of Pierce's 472 bridges with a recorded construction year (90%), against a county median build year of 1971. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.
Live comparison across Washington bridges with a recorded inventory load rating (8,455 of 8,474 rated).
KOLISCH RD E vs every rated Washington bridge
Inventory load rating (metric tons), FHWA NBI, this state
15 Top 93% higher than 7% of 8,455 bridges
rated Washington bridges, bucketed by value
Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.
Source FHWA National Bridge Inventory · August 2026
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.
Pierce inventory by recorded NBI category
Exclusive Good/Fair/Poor bands across all 472 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.
Structural Details
- Year Built
- 1937
- Last Reconstructed
- 1966
- Material
- Wood or Timber
- Number of Spans
- 1
- Structure Length
- 45.7 m (150 ft)
- Deck Width
- 4.6 m (15 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 100 vehicles/day
- Structure Number
- 084735000000000
Condition Analysis
- • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
- • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
- • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether KOLISCH RD E is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare KOLISCH RD E against other structures in Pierce and across Washington. Washington bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for KOLISCH RD E?
KOLISCH RD E in Pierce, Washington has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is KOLISCH RD E inspected?
KOLISCH RD E's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. KOLISCH RD E is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for KOLISCH RD E?
KOLISCH RD E has an NBI inventory load rating of 15.4 metric tons.
Who is responsible for maintaining KOLISCH RD E?
KOLISCH RD E is owned and maintained by County Highway Agency.
How old is KOLISCH RD E and does age affect safety?
KOLISCH RD E was built in 1937, making it 89 years old and last reconstructed in 1966.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Share this inspection record
Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.
Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.