FHWA NBI 2024 Inspection record Public-domain dataset

POST STREET

Carrying POST STREET over SPOKANE RIVER

00.6 N OF I-90, Spokane, Washington

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
0 t Inventory load rating Lower than 99% of rated Washington bridges

POST STREET in Spokane, Washington sits above 1% of rated Washington bridges on inventory load rating (0 t), while its 1917 build year is earlier than 97% of Spokane's recorded-year cohort (307 bridges).

POST STREET in Spokane, Washington is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1917, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 2. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure WA:085287000000000

PRE-1950 · CONCRETE · SINGLE-SPAN · SUPER-LED · ARTERIAL-ADT · TRACE-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • SINGLE-SPAN Single span
  • SUPER-LED Superstructure-led
  • ARTERIAL-ADT Arterial ADT
  • TRACE-LOAD Trace load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: POST STREET

The POST STREET bridge in Spokane, Washington carries POST STREET over SPOKANE RIVER. It was built in 1917, making it 109 years old today. It was last reconstructed in 1937, extending its service life. The structure is built primarily of concrete and spans 1 section, stretching 101.5 meters (333 feet) end to end. Daily traffic averages 1,685 vehicles, placing it in the moderately-trafficked tier of Washington bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 2/9, substructure at 3/9. The weakest component sits in critical condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How POST STREET compares

▼ 34.0
Load rating vs Washington average (34.0 t; 8,455 of 8,474 rated)
307
Bridges in Spokane · 21 in Poor condition

Age against the county: built in 1917, earlier than 299 of Spokane's 307 bridges with a recorded construction year (97%), against a county median build year of 1973. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

POST STREET 0.0 t
Washington average (8,455 of 8,474 rated) 34.0 t

Live comparison across Washington bridges with a recorded inventory load rating (8,455 of 8,474 rated).

POST STREET vs every rated Washington bridge

Inventory load rating (metric tons), FHWA NBI, this state

0 Top 99% higher than 1% of 8,455 bridges

rated Washington bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
2/9
Poor (1–4)
Substructure
3/9
Poor (1–4)
Inventory Load Rating
0.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Spokane inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 307 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1917
Last Reconstructed
1937
Material
Concrete
Number of Spans
1
Structure Length
101.5 m (333 ft)
Deck Width
16.5 m (54 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,685 vehicles/day
Structure Number
085287000000000

Condition Analysis

  • At 3/9, the deck (driving surface) is in poor shape, with advanced wear on file for this vintage.
  • At 2/9, the superstructure (beams and supports above the deck) is in critical shape, with severe wear recorded for this vintage.
  • The substructure (piers and abutments) rates poor at 3/9, with advanced deterioration recorded on the latest inspection.

How to read this record

POST STREET is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare POST STREET against other structures in Spokane and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for POST STREET?

POST STREET in Spokane, Washington has a deck rating of 3/9, superstructure rating of 2/9, and substructure rating of 3/9 on the FHWA's 0–9 scale.

How often is POST STREET inspected?

POST STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,685 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. POST STREET is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for POST STREET?

POST STREET has an NBI inventory load rating of 0.0 metric tons.

Who is responsible for maintaining POST STREET?

POST STREET is owned and maintained by City/Municipal Highway Agency.

How old is POST STREET and does age affect safety?

POST STREET was built in 1917, making it 109 years old and last reconstructed in 1937.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.