FHWA NBI 2024 Inspection record Public-domain dataset

TAC SPUR-SCHUST SB

Carrying TAC SPUR-SCHUST SB over SCHUSTER PKWY NB

1.0 N JCT SR 509, Pierce, Washington

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
17 t Inventory load rating Lower than 91% of rated Washington bridges

TAC SPUR-SCHUST SB in Pierce, Washington sits above 9% of rated Washington bridges on inventory load rating (17 t), while its 1974 build year is earlier than 43% of Pierce's recorded-year cohort (472 bridges).

TAC SPUR-SCHUST SB in Pierce, Washington is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1974, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure WA:088852000000000

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · TIED-CTRL · ARTERIAL-ADT · LIGHT-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 6 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: TAC SPUR-SCHUST SB

The TAC SPUR-SCHUST SB bridge in Pierce, Washington carries TAC SPUR-SCHUST SB over SCHUSTER PKWY NB. It was built in 1974, making it 52 years old today. The structure is built primarily of prestressed concrete and spans 6 sections, stretching 189.9 meters (623 feet) end to end. Daily traffic averages 7,955 vehicles, placing it in the moderately-trafficked tier of Washington bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How TAC SPUR-SCHUST SB compares

▼ 17.2
Load rating vs Washington average (34.0 t; 8,455 of 8,474 rated)
472
Bridges in Pierce · 20 in Poor condition

Age against the county: built in 1974, earlier than 205 of Pierce's 472 bridges with a recorded construction year (43%), against a county median build year of 1971. This is one of the newer structures in its county.

TAC SPUR-SCHUST SB 16.8 t
Washington average (8,455 of 8,474 rated) 34.0 t

Live comparison across Washington bridges with a recorded inventory load rating (8,455 of 8,474 rated).

TAC SPUR-SCHUST SB vs every rated Washington bridge

Inventory load rating (metric tons), FHWA NBI, this state

17 Top 91% higher than 9% of 8,455 bridges

rated Washington bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
16.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Pierce inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 472 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1974
Material
Prestressed Concrete
Number of Spans
6
Structure Length
189.9 m (623 ft)
Deck Width
6.2 m (20 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
7,955 vehicles/day
Structure Number
088852000000000

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether TAC SPUR-SCHUST SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare TAC SPUR-SCHUST SB against other structures in Pierce and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TAC SPUR-SCHUST SB?

TAC SPUR-SCHUST SB in Pierce, Washington has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is TAC SPUR-SCHUST SB inspected?

TAC SPUR-SCHUST SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 7,955 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TAC SPUR-SCHUST SB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TAC SPUR-SCHUST SB?

TAC SPUR-SCHUST SB has an NBI inventory load rating of 16.8 metric tons.

Who is responsible for maintaining TAC SPUR-SCHUST SB?

TAC SPUR-SCHUST SB is owned and maintained by City/Municipal Highway Agency.

How old is TAC SPUR-SCHUST SB and does age affect safety?

TAC SPUR-SCHUST SB was built in 1974, making it 52 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.