FHWA NBI 2024 Inspection record Public-domain dataset

LRD 360TH STREET

Carrying LRD 360TH STREET over WOLF RIVER

0.2 M N 120TH AVENUE, Chippewa, Wisconsin

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
32 t Inventory load rating Lower than 68% of rated Wisconsin bridges

LRD 360TH STREET in Chippewa, Wisconsin sits above 32% of rated Wisconsin bridges on inventory load rating (32 t), while its 1968 build year is earlier than 81% of Chippewa's recorded-year cohort (359 bridges).

LRD 360TH STREET in Chippewa, Wisconsin is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1968, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure WI:P09016200000000

INTERSTATE-ERA · TIMBER · SINGLE-SPAN · SUB-LED · LOCAL-ADT · STANDARD-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • TIMBER Wood or timber
  • SINGLE-SPAN Single span
  • SUB-LED Substructure-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: LRD 360TH STREET

The LRD 360TH STREET bridge in Chippewa, Wisconsin carries LRD 360TH STREET over WOLF RIVER. It was built in 1968, making it 58 years old today. The structure is built primarily of wood or timber and spans 1 section, stretching 7.9 meters (26 feet) end to end. Daily traffic averages 190 vehicles, placing it in the lower-traffic tier of Wisconsin bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How LRD 360TH STREET compares

▼ 1.2
Load rating vs Wisconsin average (33.6 t; 14,446 rated)
359
Bridges in Chippewa · 33 in Poor condition

Age against the county: built in 1968, earlier than 291 of Chippewa's 359 bridges with a recorded construction year (81%), against a county median build year of 1991. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

LRD 360TH STREET 32.4 t
Wisconsin average (14,446 rated) 33.6 t

Live comparison across Wisconsin bridges with a recorded inventory load rating (14,446 rated).

LRD 360TH STREET vs every rated Wisconsin bridge

Inventory load rating (metric tons), FHWA NBI, this state

32 Top 68% higher than 32% of 14,446 bridges

rated Wisconsin bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Chippewa inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 359 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1968
Material
Wood or Timber
Number of Spans
1
Structure Length
7.9 m (26 ft)
Deck Width
7.8 m (26 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
190 vehicles/day
Structure Number
P09016200000000

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.

How to read this record

LRD 360TH STREET is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare LRD 360TH STREET against other structures in Chippewa and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LRD 360TH STREET?

LRD 360TH STREET in Chippewa, Wisconsin has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is LRD 360TH STREET inspected?

LRD 360TH STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 190 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LRD 360TH STREET is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LRD 360TH STREET?

LRD 360TH STREET has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining LRD 360TH STREET?

LRD 360TH STREET is owned and maintained by Town/Township Highway Agency.

How old is LRD 360TH STREET and does age affect safety?

LRD 360TH STREET was built in 1968, making it 58 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.