Graham County, AZ

111 public highway bridges

Graham County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Graham County, Arizona contains 111 public highway bridges. Roughly 38.7% are rated “Good,” 54.1% “Fair,” and 7.2% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

111
Total Bridges
38.7%
Good
54.1%
Fair
7.2%
Poor Condition

Condition Distribution

Good
38.7% (43)
Fair
54.1% (60)
Poor
7.2% (8)

All Bridges (111)

Airport Road

Fair

Over: Under Tidwell Wash

0.3 mi N Jct Sanchez Rd, Graham, AZ

Built 1988 Load: 36.3 t ADT: 300

Bryce-Eden

Fair

Over: Markham Wash

3.0 mi NW Jct US 70, Graham, AZ

Built 1939 Load: 36.3 t ADT: 300

Cottonwood Wash Rd

Fair

Over: Cottonwood Wash

2.9 mi SW Jct 800 W, Graham, AZ

Built 1999 Load: 37.2 t ADT: 600

IRR BIA RTE 4

Fair

Over: WASH

18KM NW OF POINT OF PINES, Graham, AZ

Built 1990 Load: 40.8 t ADT: 10

IRR BIA RTE 4

Fair

Over: WASH

5 KM SE OF POINT OF PINES, Graham, AZ

Built 1980 Load: 40.8 t ADT: 45

IRR US 70

Fair

Over: Hunzinger Wash

25.8 mi W Jct US 191S, Graham, AZ

Built 1932 Load: 42.6 t ADT: 3,757

ASH CREEK RANCH RD

Fair

Over: SOUTH FORK ASH CREEK

2.25KM N OF BIA 8, Graham, AZ

Built 2010 Load: 58.1 t ADT: 10

IRR BIA RTE 8

Fair

Over: BRONCHO WASH

25.8 KM NE OF AZ 70 JCT, Graham, AZ

Built 1965 Load: 66.5 t ADT: 170

US 70

Fair

Over: Wash

13.9 mi W Jct SR 75, Graham, AZ

Built 1939 Load: 89.8 t ADT: 1,152

SR 266

Fair

Over: Wash

12.9 mi W Jct US 191, Graham, AZ

Built 1962 Load: 89.8 t ADT: 225

IRR BIA RTE 3

Good

Over: WASH

30.3 KM E DAM SPILLWAY, Graham, AZ

Built 1929 Load: 24.3 t ADT: 210

IRR US 70

Good

Over: Wash

32.2 mi E SR 170, Graham, AZ

Built 1958 Load: 31.8 t ADT: 3,521

US 70

Good

Over: Wash

24.4 mi W Jct SR 75, Graham, AZ

Built 1938 Load: 31.8 t ADT: 1,063

Lone Star Rd

Good

Over: Graveyard Wash

1.3 mi W Jct US 70, Graham, AZ

Built 1991 Load: 31.8 t ADT: 1,201

Airport Road

Good

Over: Lone Star Wash

2.0 mi E Jct 8th Ave, Graham, AZ

Built 1950 Load: 31.8 t ADT: 1,000

IRR BIA RTE 8

Good

Over: WASH

32 KM EAST OF SAN CARLOS, Graham, AZ

Built 1970 Load: 32.4 t ADT: 170

IRR BIA RTE 8

Good

Over: WASH

19.4 KM NE OF AZ 70 JCT, Graham, AZ

Built 1965 Load: 32.6 t ADT: 170

IRR BIA RTE 8

Good

Over: JUNIPER WASH

32.9 KM FROM AZ 70 JCT, Graham, AZ

Built 1965 Load: 32.7 t ADT: 170

IRR BIA RTE 8

Good

Over: WASH

38 KM EAST OF SAN CARLOS, Graham, AZ

Built 1970 Load: 32.7 t ADT: 170

IRR US 70

Good

Over: Wash

31.7 mi E SR 170, Graham, AZ

Built 1932 Load: 32.7 t ADT: 3,521

SR 366

Good

Over: Noon Creek

7.2 mi SW Jct US 191, Graham, AZ

Built 2012 Load: 32.7 t ADT: 105

Bryce-Eden Road

Good

Over: Peck Wash

2.0 mi N Jct US 70, Graham, AZ

Built 1981 Load: 32.7 t ADT: 600

Sanchez Road

Good

Over: Gila River

0.8 mi N Jct US 70, Graham, AZ

Built 1997 Load: 32.7 t ADT: 750

Reay Lane

Good

Over: Gila River

2.0 mi N Jct US 70, Graham, AZ

Built 1988 Load: 33.6 t ADT: 1,300

Eden Road

Good

Over: Gila River

0.3 mi E Jct US 70, Graham, AZ

Built 1983 Load: 34.5 t ADT: 250

8th Ave

Good

Over: Gila River

0.8 mi N Jct US 70, Graham, AZ

Built 2010 Load: 34.5 t ADT: 4,200

IRR US 70

Good

Over: Gila River

21.5 mi E Jct IRR 170, Graham, AZ

Built 2012 Load: 36.3 t ADT: 2,940

US 70

Good

Over: Wash

19.3 mi W Jct SR 75, Graham, AZ

Built 1938 Load: 36.3 t ADT: 1,063

191

Good

Over: Oak Draw Wash

17.7 mi S Jct US 70, Graham, AZ

Built 2012 Load: 36.3 t ADT: 2,860

Bryce-Eden Road

Good

Over: Billingsley Wash

2.7 mi W Jct Bryce Rd, Graham, AZ

Built 1939 Load: 36.3 t ADT: 450

SR 266

Good

Over: Wash

18.9 mi W Jct US 191, Graham, AZ

Built 1962 Load: 37.2 t ADT: 225

SR 266

Good

Over: Mothers Canyon

12.4 mi W Jct US 191, Graham, AZ

Built 1962 Load: 38.1 t ADT: 225

US 191

Good

Over: Swift Canyon Wash

7.2 mi S Jct US 70, Graham, AZ

Built 1953 Load: 38.1 t ADT: 7,459

IRR BIA RTE 103

Good

Over: SAN CARLOS RIVER

3.7 KM S OF SAN CARLOS, Graham, AZ

Built 1989 Load: 39.7 t ADT: 3,000

IRR BIA RTE 4

Good

Over: WASH

19KM NW OF POINT OF PINES, Graham, AZ

Built 1990 Load: 40.8 t ADT: 10

IRR BIA RTE 4

Good

Over: WASH

16 NW OF POINT OF PINES, Graham, AZ

Built 1990 Load: 40.8 t ADT: 10

Ash Creek Road

Good

Over: Bar X Wash

2.4 mi E Jct Ft Grant Rd, Graham, AZ

Built 1995 Load: 44.5 t ADT: 1,000

Lone Star Rd

Good

Over: Stockton Drain

0.7 mi W Jct US 70, Graham, AZ

Built 1991 Load: 46.3 t ADT: 1,200

4010: HAEKEL ROAD

Good

Over: Upper San Simon Drainage

38 mi SE of Safford, AZ, Graham, AZ

Built 1974 Load: 47.6 t ADT: 50

IRR BIA ROUTE 194

Good

Over: LOCAL DRAINAGE

0.23KM SW OF US 70, Graham, AZ

Built 2016 Load: 48.2 t ADT: 500

IRR US 70

Good

Over: Wildhorse Canyon

30.8 mi E Jct SR 77, Graham, AZ

Built 1956 Load: 65.3 t ADT: 2,904

US 191

Good

Over: Wash

23.1 mi S Jct US 70, Graham, AZ

Built 1946 Load: 75.3 t ADT: 2,860

IRR US 70

Good

Over: Wash

17.2 mi E SR 170, Graham, AZ

Built 1956 Load: 88.0 t ADT: 2,940

IRR BIA ROUTE 193

Good

Over: LOCAL DRAINAGE

2.27KM NORTH OF BIA RTE 8, Graham, AZ

Built 2016 Load: 89.8 t ADT: 500

IRR US 70

Good

Over: Bone Spring Canyon

32.6 mi E Jct SR 77, Graham, AZ

Built 1956 Load: 89.8 t ADT: 2,911

IRR US 70

Good

Over: Wash

24.9 mi E SR 170, Graham, AZ

Built 1958 Load: 89.8 t ADT: 2,940

SR 266

Good

Over: Stockton Wash

8.8 mi W Jct US 191, Graham, AZ

Built 1962 Load: 89.8 t ADT: 225

US 191

Good

Over: Wash

27.7 mi S Jct US 70, Graham, AZ

Built 1946 Load: 89.8 t ADT: 2,860

US 191

Good

Over: Jacobson Wash

8.2 mi S Jct US 70, Graham, AZ

Built 1960 Load: 89.8 t ADT: 2,901

US 191

Good

Over: Drainage Channel

4 Mi S Jct SR 75, Graham, AZ

Built 2003 Load: 89.8 t ADT: 3,989
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.