Clay County, AR

66 public highway bridges

Clay County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Clay County, Arkansas contains 66 public highway bridges. Roughly 40.9% are rated “Good,” 43.9% “Fair,” and 15.2% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

66
Total Bridges
40.9%
Good
43.9%
Fair
15.2%
Poor Condition

Condition Distribution

Good
40.9% (27)
Fair
43.9% (29)
Poor
15.2% (10)

All Bridges (66)

CR 492B - I

Fair

Over: PAYNE CREEK

1.5 Mi SW of Greenway, Clay, AR

Built 1991 Load: 2.7 t ADT: 25

CR 232-D (911=329)

Fair

Over: DITCH

NW of Pollard, Clay, AR

Built 1999 Load: 10.0 t ADT: 32

CR 152 - E

Fair

Over: MO ARK DITCH

4.5 MI NE OF CORNING, Clay, AR

Built 2002 Load: 10.0 t ADT: 81

CR204-C (911=342)

Fair

Over: MCNEIL CREEK

2.18 Mi SW of Hwy 62, Clay, AR

Built 1995 Load: 10.9 t ADT: 41

CR 341 - C

Fair

Over: Ditch

.7 Mi N of Pollard, Clay, AR

Built 2001 Load: 14.5 t ADT: 1,028

CR 445 - D

Fair

Over: LITTLE CACHE RIVER

1 MI. SO. OF MCDOUGAL, Clay, AR

Built 2006 Load: 14.5 t ADT: 266

CR 197 - E

Fair

Over: DRAINAGE DITCH

3.5 MI N.E. OF SUCCESS, Clay, AR

Built 1996 Load: 15.4 t ADT: 60

W CHERRY ST.

Fair

Over: SUGAR CREEK

0.25 Mi W Jct US 62, Clay, AR

Built 1942 Load: 16.3 t ADT: 759

CR 528 - B

Fair

Over: Hampton Slough Ditch

NW of Kennett, Clay, AR

Built 2001 Load: 16.3 t ADT: 518

CR 543 - B Rt 83

Fair

Over: QUICK CREEK

1.0 MI. E OF GREENWAY, Clay, AR

Built 2004 Load: 17.2 t ADT: 18

US 62-20- LM 0.63

Fair

Over: MOARK CREEK

.63 M E OF US 67, Clay, AR

Built 1956 Load: 18.1 t ADT: 4,700

US 67-20- LM 12.83

Fair

Over: DITCH

1.2 MI S JCT SH 328 & 67, Clay, AR

Built 1928 Load: 19.1 t ADT: 6,935

CR 415 - H

Fair

Over: Drainage Ditch

.25 mile E Boydsville, Clay, AR

Built 2006 Load: 20.0 t ADT: 98

SH 90-02- LM 7.63

Fair

Over: DRAINAGE DITCH

1.4 MI SE OF BOYDSVILLE, Clay, AR

Built 2004 Load: 20.0 t ADT: 930

CR 17-F (911=139)

Fair

Over: CYPRESS CREEK

1 MI SW CORNING, Clay, AR

Built 2005 Load: 20.9 t ADT: 193

SH 211-01- LM 1.55

Fair

Over: BURKE DITCH

2.5 Mi S of Success, Clay, AR

Built 1961 Load: 21.8 t ADT: 550

SH 90-03- LM 9.19

Fair

Over: CREEK

PEACH ORCHARD, Clay, AR

Built 1993 Load: 21.8 t ADT: 640

SH 90-02- LM 4.51

Fair

Over: DRAINAGE DITCH

4.51 MI NW JCT US 49, Clay, AR

Built 2004 Load: 21.8 t ADT: 1,348

SH 90-02- LM 2.98

Fair

Over: VANCEL CREEK

2.98 MI NO JCT US 49, Clay, AR

Built 2004 Load: 22.7 t ADT: 1,348

SH 90-02- LM 5.43

Fair

Over: POST OAK CREEK

5.43 MI NW OF JCT US 49, Clay, AR

Built 2004 Load: 22.7 t ADT: 1,348

SH 139-05- LM 1.01

Fair

Over: DRAINAGE DITCH NUMBER 3

1.0 MI N JCT OF US 62, Clay, AR

Built 1963 Load: 23.6 t ADT: 940

S. BROWNING AVE-I

Fair

Over: SUGAR CREEK

.25 Mi N of Hwy 49, Clay, AR

Built 2004 Load: 23.6 t ADT: 208

US 62-20- LM 2.46

Fair

Over: DRAIN DITCH

2.46 M E OF US 67, Clay, AR

Built 1956 Load: 24.5 t ADT: 4,200

SH 90-02- LM 6.75

Fair

Over: DITCH

2.5 MI SE OF BOYDSVILLE, Clay, AR

Built 2004 Load: 25.4 t ADT: 930

SH 141-SEC 05-5.57

Fair

Over: DITCH NO 10

2.71 MI N OF KNOB, Clay, AR

Built 1972 Load: 28.1 t ADT: 350

US 67-20- LM 14.45

Fair

Over: DITCH

0.3 MI NE JCT SH 328 & 67, Clay, AR

Built 1928 Load: 29.9 t ADT: 4,600

SH 90-02- LM 8.28

Fair

Over: BIG CREEK

1.2 MI SE OF BOYDSVILLE, Clay, AR

Built 2004 Load: 29.9 t ADT: 930

SO. 10TH AVE-I

Fair

Over: CREEK

15' S. OF W. CLAY ST., Clay, AR

Built 1990 Load: 32.7 t ADT: 2,400

CR 229-D (911=339)

Fair

Over: DITCH NO 3

1 MI N W OF POLLARD, Clay, AR

Built 2000 Load: 32.7 t ADT: 148

CR 269 - G

Good

Over: DITCH

2.3 MI S OF KNOBEL, Clay, AR

Built 2002 Load: 9.1 t ADT: 40

CR 97-C (911=310)

Good

Over: POPLAR CREEK

2.7 Mi E of Hwy 139, Clay, AR

Built 2001 Load: 10.0 t ADT: 149

CR 418 - I

Good

Over: Creek

3 Mi NW Rector, Clay, AR

Built 2006 Load: 12.7 t ADT: 50

CR 143 - F

Good

Over: Cypress Creek Ditch

0.43 M S of Hwy 67, Clay, AR

Built 2016 Load: 13.6 t ADT: 59

CR 39-I (911=406)

Good

Over: POST OAK CREEK

.75 Mi W of Rector, Clay, AR

Built 1998 Load: 14.5 t ADT: 345

CR 500 - A

Good

Over: DRAINAGE DITCH

4 MI SO. OF RECTOR, Clay, AR

Built 2001 Load: 14.5 t ADT: 11

CR 64-D (911=463)

Good

Over: Horse Creek

1 M S US 62 at Pollard, Clay, AR

Built 2008 Load: 16.3 t ADT: 445

CR 432 - I

Good

Over: VANCEL CREEK

0.03 MI W. JCT SH 90, Clay, AR

Built 1996 Load: 17.2 t ADT: 29

SH 141-05- LM 0.91

Good

Over: DRAINAGE DITCH

0.8 MI N CLAY CO LINE, Clay, AR

Built 1987 Load: 17.2 t ADT: 300

SH 90- 03- LM 3.54

Good

Over: DRAINAGE DITCH

3.54 MI W OF JCT SH 135, Clay, AR

Built 1988 Load: 19.1 t ADT: 1,000

SH 90-02- LM 2.07

Good

Over: VANCEL CREEK

2.07 MI. N JCT US 49, Clay, AR

Built 2004 Load: 19.1 t ADT: 1,348

SH 139-03- LM 4.38

Good

Over: DITCH

1.25 MI E OF LEONARD, Clay, AR

Built 1985 Load: 20.9 t ADT: 348

SH 139-04- LM 0.49

Good

Over: DRAINAGE DITCH

0.49 MI N OF JCT SH 90, Clay, AR

Built 1968 Load: 21.8 t ADT: 1,500

SH 90- 03- LM 2.54

Good

Over: KRAMER DITCH

2.54 MI W OF JCT SH 135, Clay, AR

Built 1988 Load: 21.8 t ADT: 1,000

SH 90-02- LM 1.64

Good

Over: VANCEL CREEK

1.64 MI. N JCT US 49, Clay, AR

Built 2004 Load: 21.8 t ADT: 1,348

SH 90-02- LM 2.27

Good

Over: VANCEL CREEK

2.27 MI NO JCT US 49, Clay, AR

Built 2004 Load: 22.7 t ADT: 1,348

SH 90-02- LM 0.96

Good

Over: DITCH

N CITY LIMITS OF RECTOR, Clay, AR

Built 2004 Load: 23.6 t ADT: 1,500

SH 90-02- LM 1.39

Good

Over: DITCH

1.39 MI. N JCT US 49, Clay, AR

Built 2004 Load: 23.6 t ADT: 1,348

US 67-20- LM 6.74

Good

Over: Ditch

2.3 MI E JCT SH 211 & 67, Clay, AR

Built 1928 Load: 25.4 t ADT: 5,438

AR Hwy 328

Good

Over: Townsend Lateral Canal

East of Success, Clay, AR

Built 2023 Load: 26.3 t ADT: 700

Hwy 141

Good

Over: DITCH NO. 10

N of Boydsville, Clay, AR

Built 2022 Load: 27.2 t ADT: 430
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.