Alexander County, IL

96 public highway bridges

Alexander County Bridge Snapshot

Alexander County, Illinois contains 96 public highway bridges in the FHWA National Bridge Inventory. Roughly 26% are rated “Good,” 55.2% “Fair,” 8.3% “Poor,” and 8.3% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in IL are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

96
Total Bridges
26%
Good
8.3%
Poor
8.3%
Structurally Deficient

Condition Distribution

Good
26% (25)
Fair
55.2% (53)
Poor
8.3% (8)
SD
8.3% (8)

All Bridges (96)

FAI-57 NB

Unknown

Over: TR-163B

0.3 MI S PULASKI CO, Alexander, IL

Built 1968 ADT: 200

I 57 NB

Unknown

Over: ILL3/US 51-CS 6010A-CNIC

CAIRO INTERCHANGE, Alexander, IL

Built 1978 ADT: 10

I 57 SB

Unknown

Over: ILL3/US 51-CS 6010A-CNIC

CAIRO INTERCHANGE, Alexander, IL

Built 1978 ADT: 10

CNIC

Unknown

Over: FAI 57 & US 51

1 MI. N. OF ILL 3, Alexander, IL

Built 1977 ADT: 13,400

CNIC RR

Unknown

Over: US 51

0.5 MI E I-57, Alexander, IL

Built 1974 ADT: 4,300

ICG RR

Unknown

Over: US 51

1ST OVRHEAD CAIRO, Alexander, IL

Built 1903 ADT: 5,200

ICG RR

Unknown

Over: US 51

2ND OVERHEAD CAIRO, Alexander, IL

Built 1903 ADT: 5,200

PENN CENTRAL

Unknown

Over: US 51

3RD OVERHEAD CAIRO, Alexander, IL

Built 1917 ADT: 5,200

MO PAC RR

Unknown

Over: OLD ILL RTE 3

GALE, Alexander, IL

Built 1900 ADT: 100

UNION PACIFIC RR

Unknown

Over: MISSISSIPPI RV

THEBES, Alexander, IL

Built 1902 ADT: 10

US 51

Fair

Over: OHIO RIVER

1 MI S CAIRO, Alexander, IL

Built 1937 Load: 14.3 t ADT: 5,700

TR-58

Fair

Over: PIGEON ROOST CK

0.5M NW OLIVE BRANCH, Alexander, IL

Built 1954 Load: 16.8 t ADT: 500

TR-15

Fair

Over: CLEAR CREEK DITCH

SW 1/4 SEC1 T14S R3W, Alexander, IL

Built 1944 Load: 18.1 t ADT: 25

FAS 2943

Fair

Over: BROWNSVILLE CK TRIB

2.5 MI E OF THEBES, Alexander, IL

Built 1968 Load: 18.5 t ADT: 100

TR-44

Fair

Over: TRIB MILLER CREEK

2.5 MI E OF THEBES, Alexander, IL

Built 1957 Load: 19.8 t ADT: 75

ILLINOIS 127

Fair

Over: HARTLINE CREEK

2.3MI S UNION CO., Alexander, IL

Built 1973 Load: 21.1 t ADT: 675

FAS 946

Fair

Over: DRAINAGE DITCH

2.6 MI S OLIVE BR., Alexander, IL

Built 1962 Load: 21.7 t ADT: 125

OLD IL RTE 3-GALE

Fair

Over: SEXTON CREEK

GALE, Alexander, IL

Built 1933 Load: 24.0 t ADT: 175

ILL 3

Fair

Over: PIGEON ROOST CREEK

OLIVE BRANCH, Alexander, IL

Built 1965 Load: 24.3 t ADT: 3,300

TR 16

Fair

Over: ORCHARD CK

1 MILE SO OF THEBES, Alexander, IL

Built 1971 Load: 24.6 t ADT: 25

NO DATA ENTERED

Fair

Over: WOLF CREEK

T15SR2WS18, Alexander, IL

Built 2003 Load: 25.6 t ADT: 1

FAI 57

Fair

Over: MISSISSIPPI RIVER

I-57 AT CAIRO, Alexander, IL

Built 1978 Load: 28.2 t ADT: 13,700

CH-4 (FAS-945)

Fair

Over: SANDY CREEK

3.5 MI N DISWOOD, Alexander, IL

Built 1962 Load: 28.5 t ADT: 650

TR 125

Fair

Over: DRAINAGE DITCH

1.5 MI W. OF UNITY, Alexander, IL

Built 1977 Load: 28.5 t ADT: 125

I 57 SB

Fair

Over: CACHE RIVER

PULASKI CO LINE, Alexander, IL

Built 1967 Load: 29.8 t ADT: 6,700

TR 16

Fair

Over: MILLER CREEK

0.2M E. OF THEBES, Alexander, IL

Built 1978 Load: 29.8 t ADT: 175

FAS 2943

Fair

Over: MILLER CREEK

E.CORP LIMIT THERES, Alexander, IL

Built 1975 Load: 31.4 t ADT: 125

TWP RD 41

Fair

Over: SEXTON CK

2.3 MI N OF GALE, Alexander, IL

Built 1974 Load: 31.4 t ADT: 50

TR 51

Fair

Over: SAMMONS CREEK

1 MI EAST OF THEBES, Alexander, IL

Built 1989 Load: 31.8 t ADT: 100

FAP 312-IL 146

Fair

Over: MISSISSIPPI RIVER

EAST CAPE GIRARDEAU, Alexander, IL

Built 2003 Load: 32.4 t ADT: 9,350

TR 73

Fair

Over: WOLF CREEK

3.5 MI N OF OLIVE BR, Alexander, IL

Built 1988 Load: 32.4 t ADT: 10

TR 41A

Fair

Over: TRIB SEXTON CREEK

6 MI E OF MCCLURE, Alexander, IL

Built 1977 Load: 32.4 t ADT: 10

FAS 945

Fair

Over: TRIB SEXTON CREEK

5 MI E OF MCCLURE, Alexander, IL

Built 1958 Load: 33.4 t ADT: 650

TR141A

Fair

Over: LAKE CREEK

2MI E OF MILLER CITY, Alexander, IL

Built 1961 Load: 33.7 t ADT: 75

FAS 2943

Fair

Over: AMBEER CREEK

3.5 M.W. OF TAMMS, Alexander, IL

Built 1977 Load: 34.0 t ADT: 125

TR 123A

Fair

Over: ORCHARD CREEK

.4 M.S. OF THEBES, Alexander, IL

Built 1977 Load: 34.7 t ADT: 10

FAS 943

Fair

Over: WOLF CREEK

0.7 MI S OF DISWOOD, Alexander, IL

Built 1982 Load: 35.0 t ADT: 650

ILL 3

Fair

Over: CACHE RIVER

2.8 MI S ILL 127, Alexander, IL

Built 1948 Load: 36.0 t ADT: 1,950

FAS 2943

Fair

Over: BROWNVILLECREEK

1.5 MI E OF THEBES, Alexander, IL

Built 1974 Load: 36.9 t ADT: 250

TR 106

Fair

Over: E FORK SANDY CREEK

2.3 M.W.OF TAMMS, Alexander, IL

Built 1977 Load: 36.9 t ADT: 25

TR 97-DAVIE ROAD

Fair

Over: TRIB TO ROAD RUN CR

2.5 M NW OLIVEBRANCH, Alexander, IL

Built 2001 Load: 37.3 t ADT: 325

TR 93

Fair

Over: PIGEON ROOST CREEK

1.5M NW OLIVE BRANCH, Alexander, IL

Built 1991 Load: 37.9 t ADT: 225

TR 98

Fair

Over: LAKE CREEK

5 MI S OLIVE BRANCH, Alexander, IL

Built 1996 Load: 37.9 t ADT: 25

TR 150A

Fair

Over: JACKSON CREEK

2 MI N OF TAMMS, Alexander, IL

Built 1984 Load: 38.2 t ADT: 100

TR 51

Fair

Over: TRIB SAMMONS CREEK

BEAN RIDGE ROAD, Alexander, IL

Built 1987 Load: 38.2 t ADT: 100

TR 44

Fair

Over: TRIB TO BLACK CREEK

0.7 MI S OF ILL 3, Alexander, IL

Built 1989 Load: 38.2 t ADT: 100

TR 39

Fair

Over: TRIB TO MILL CREEK

2 MI SE OF ELCO, Alexander, IL

Built 1990 Load: 38.2 t ADT: 10

TR 105-CLANK ROAD

Fair

Over: ROAD RUN CREEK

3 MI NE OLIVE BRANCH, Alexander, IL

Built 1995 Load: 38.2 t ADT: 100

TR 150

Fair

Over: BRANCH HARTLINE CR

N EDGE OF ELCO, Alexander, IL

Built 1983 Load: 38.6 t ADT: 125

TR 105

Fair

Over: ROAD RUN CREEK

2 MI NE OLIVE BRANCH, Alexander, IL

Built 1992 Load: 38.6 t ADT: 100

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial