Baker County, FL

93 public highway bridges

Baker County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Baker County, Florida contains 93 public highway bridges. Roughly 20.4% are rated “Good,” 59.1% “Fair,” and 8.6% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

93
Total Bridges
20.4%
Good
59.1%
Fair
8.6%
Poor Condition

Condition Distribution

Good
20.4% (19)
Fair
59.1% (55)
Poor
8.6% (8)

All Bridges (93)

SR-121

Unknown

Over: I-10 (SR-8)

SR-121 over I-10, Baker, FL

Built 1960 ADT: 29,000

I-10 WB (SR-8)

Unknown

Over: CR-125

I-10 WB OVER CR-125, Baker, FL

Built 1961 ADT: 650

I-10 WB SR-8

Unknown

Over: SR-228

I-10 WB OVER SR-228, Baker, FL

Built 1960 ADT: 12,800

FOREST RD. 235

Unknown

Over: I-10 (SR-8)

5.5 MI. W OF US-90, Baker, FL

Built 1962 ADT: 25,243

I-10 WB SR-8

Unknown

Over: US-90 SR-10

I-10 WB OVER US-90, Baker, FL

Built 1962 ADT: 7,200

I-10 EB SR-8

Unknown

Over: US-90 SR-10

I-10 EB OVER US-90, Baker, FL

Built 1962 ADT: 7,200

I-10 EB (SR-8)

Unknown

Over: CR-125

I-10 EB OVER CR-125, Baker, FL

Built 1961 ADT: 650

I-10 EB SR-8

Unknown

Over: SR-228

I-10 EB OVER SR-228, Baker, FL

Built 1960 ADT: 12,800

CR-250A

Unknown

Over: I-10 (SR-8)

CR-250A / I-10, Baker, FL

Built 1962 ADT: 25,243

CR-123

Unknown

Over: I-10 SR-8

CR-123 OVER I-10, Baker, FL

Built 1959 ADT: 27,500

CR-229

Unknown

Over: I-10 (SR-8)

CR-229/I-10, Baker, FL

Built 1959 ADT: 23,500

Road 6

Fair

Over: Morgan Creek

John Bethea State Forest, Baker, FL

Built 1952 Load: 5.9 t ADT: 11

ROAD 24

Fair

Over: UNKNOWN CREEK

JOHN BETHEA STATE FOREST, Baker, FL

Built 1952 Load: 7.0 t ADT: 11

ROAD 26

Fair

Over: UNKNOWN CREEK

JOHN BETHEA STATE FOREST, Baker, FL

Built 1952 Load: 9.1 t ADT: 11

TURNER CEMETERY RD

Fair

Over: CALKINS CREEK

2.9 MI SOUTH OF CR 125, Baker, FL

Built 1980 Load: 9.5 t ADT: 101

HAMP REGISTER ROAD

Fair

Over: CALKINS CREEK

0.6 MI EAST OF CR 127, Baker, FL

Built 1941 Load: 12.1 t ADT: 155

CR 127 EXTENSION

Fair

Over: TRIB TO MOCCASIN CREEK

2 MI NORTH OF SR 2, Baker, FL

Built 1941 Load: 12.7 t ADT: 41

HAMP REGISTER RD

Fair

Over: CEDAR CREEK

1.8 MI EAST OF CR 127, Baker, FL

Built 1970 Load: 16.0 t ADT: 155

HARLEY THRIFT ROAD

Fair

Over: MT ZION CREEK

0.6 MI WEST OF SR 121, Baker, FL

Built 1970 Load: 17.0 t ADT: 71

CR 250

Fair

Over: MID-PRONG ST MARYS RIVER

4.7 MI SW OF CR 125, Baker, FL

Built 1957 Load: 17.6 t ADT: 200

CR 125

Fair

Over: MID-PRONG ST MARYS RIVER

0.1MI N OF CR 122, Baker, FL

Built 1948 Load: 18.0 t ADT: 6,600

CR 125

Fair

Over: CEDAR CREEK

5.4 MILES NORTH OF US 90, Baker, FL

Built 1947 Load: 18.3 t ADT: 6,600

SAND HILL RD

Fair

Over: CATTAIL CREEK

1.75 MI WEST OF CR 250, Baker, FL

Built 1973 Load: 19.0 t ADT: 71

SAND HILL ROAD

Fair

Over: GUM SWAMP CREEK

3.4 MI WEST OF CR 250, Baker, FL

Built 1973 Load: 19.0 t ADT: 71

HASSIE JOHNS RD

Fair

Over: N PRONG ST MARYS RIVER

1.1 MI EAST OF CR 127, Baker, FL

Built 1973 Load: 19.6 t ADT: 61

CR 23C

Fair

Over: S PRONG TO ST MARYS RVR

1.1 MI NORTH OF SR 121, Baker, FL

Built 1955 Load: 20.0 t ADT: 1,600

FSR 200

Fair

Over: UNNAMED STREAM

9.25 MI WEST OF STATE 250, Baker, FL

Built 1976 Load: 20.4 t ADT: 20

JOHN WILLIAMS RD

Fair

Over: CEDAR CREEK

0.1 MI EAST OF CR 124, Baker, FL

Built 1976 Load: 20.9 t ADT: 101

Eddy Road CR-250

Fair

Over: MID-PRONG ST MARYS RIVER

0.6MI N CR 250/CR 125 INT, Baker, FL

Built 1975 Load: 21.6 t ADT: 6,600

CR 250

Fair

Over: MAPLE HEAD CREEK

8 MI WEST OF CR 229, Baker, FL

Built 1950 Load: 22.5 t ADT: 200

CR 23C

Fair

Over: ST MARYS RIVER OVERFLOW

1.2 MI NORTH OF SR 121, Baker, FL

Built 1955 Load: 22.5 t ADT: 1,600

CHESTNUT ROAD

Fair

Over: TRIB OF ST MARY'S RIVER

0.4 MI WEST OF CAMPHOR RD, Baker, FL

Built 1983 Load: 23.9 t ADT: 71

CR 122

Fair

Over: MID-PRG ST MARYS RIVER

1.0 MI EAST OF CR 125, Baker, FL

Built 1969 Load: 24.5 t ADT: 450

CR 125

Fair

Over: NEW HOPE CREEK

1.3 MI NORTH OF US 90, Baker, FL

Built 1951 Load: 24.8 t ADT: 6,600

CR 127

Fair

Over: MOCCASIN BAY CREEK

3.0 MI N OF CR 122, Baker, FL

Built 1951 Load: 24.9 t ADT: 2,200

SR-228

Fair

Over: PRONG OF ST.MARY'S RIVER

1 MI. N. OF I-10, Baker, FL

Built 1955 Load: 25.5 t ADT: 12,800

SR-2

Fair

Over: MOCCASIN CREEK

3.6 MI. W. OF CR-127, Baker, FL

Built 1951 Load: 26.3 t ADT: 450

SR-2

Fair

Over: Breakfast Branch

10.3 MI. W. OF CR-127, Baker, FL

Built 1951 Load: 26.3 t ADT: 450

SR 94

Fair

Over: N PRONG ST MARY'S RIVER

12 W OF ST GEORGE, Baker, FL

Built 1989 Load: 27.0 t ADT: 630

CR 231

Fair

Over: SOUTH PRONG SWAMP

5.2 MI SOUTH OF SR 90, Baker, FL

Built 1946 Load: 29.0 t ADT: 250

I-10 SR-8

Fair

Over: TURKEY CREEK

0.1 MI. W. OF SR-228, Baker, FL

Built 1961 Load: 31.7 t ADT: 29,000

CR 125

Fair

Over: S PRONG ST MARYS RIVER

1 MI SOUTH OF I-10, Baker, FL

Built 1950 Load: 32.3 t ADT: 650

SR-2

Fair

Over: E. PRONG MOCCASIN CREEK

2.8 MI. W. OF CR-127, Baker, FL

Built 1952 Load: 32.6 t ADT: 450

SR-2

Fair

Over: SLEEPY J. CREEK

2 MI. W. OF CR-127, Baker, FL

Built 1952 Load: 32.6 t ADT: 450

I-10 WB SR-8

Fair

Over: LITTLE ST. MARY'S RIVER

0.3 MI. E. OF CR-125, Baker, FL

Built 1960 Load: 32.7 t ADT: 16,500

I-10 EB SR-8

Fair

Over: LITTLE ST. MARY'S RIVER

0.3 MI. E. OF CR-125, Baker, FL

Built 1960 Load: 32.7 t ADT: 16,500

SR 23

Fair

Over: N PRONG ST MARY'S RIVER

AT THE FLORIDA STATE LINE, Baker, FL

Built 1955 Load: 33.3 t ADT: 630

US-90 (SR-10)

Fair

Over: HELLS BAY

1.3 MI. E. OF CR-229, Baker, FL

Built 1923 Load: 33.7 t ADT: 6,000

US-90 (SR-10)

Fair

Over: BARBER BAY

0.5 MI. E. OF MACCLENNY, Baker, FL

Built 1935 Load: 34.7 t ADT: 5,400

CR-130

Fair

Over: S PRONG ST MARYS RIVER

3.0 MI EAST OF CR-229, Baker, FL

Built 1968 Load: 35.9 t ADT: 900
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.