Bureau County, IL

382 public highway bridges

Bureau County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Bureau County, Illinois contains 382 public highway bridges. Roughly 37.7% are rated “Good,” 36.1% “Fair,” and 13.4% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

382
Total Bridges
37.7%
Good
36.1%
Fair
13.4%
Poor Condition

Condition Distribution

Good
37.7% (144)
Fair
36.1% (138)
Poor
13.4% (51)

All Bridges (382)

FAS 251

Fair

Over: ADAMS CREEK

IN CHERRY, Bureau, IL

Built 1997 Load: 32.4 t ADT: 1,000

TOWNSHIP ROAD 270

Fair

Over: SENACHWINE CREEK

5 MI SE OF TISKILWA, Bureau, IL

Built 1984 Load: 32.4 t ADT: 75

TR 256-D

Fair

Over: BUREAU CREEK

2 MI E OF TISKILWA, Bureau, IL

Built 1986 Load: 32.4 t ADT: 350

TR 236

Fair

Over: BUREAU CREEK

E. EDGE OF TISKILWA, Bureau, IL

Built 1995 Load: 32.4 t ADT: 350

TR 252

Fair

Over: SENACHWINE CREEK

3 MI. SE OF TISKILWA, Bureau, IL

Built 1994 Load: 32.4 t ADT: 25

TOWNSHIP ROAD 312

Fair

Over: BUREAU CREEK

4.5 M N MALDEN, Bureau, IL

Built 1982 Load: 32.4 t ADT: 25

TR 139

Fair

Over: BR. W. BUREAU CREEK

6 MI N OF WYANET, Bureau, IL

Built 1980 Load: 32.4 t ADT: 125

TR 269

Fair

Over: POND CREEK

1 MI. N. OF BUDA, Bureau, IL

Built 1999 Load: 32.4 t ADT: 25

TOWNSHIP ROAD 280

Fair

Over: BUREAU CREEK

2 M NW DOVER, Bureau, IL

Built 1981 Load: 32.4 t ADT: 200

TOWNSHIP ROAD 109

Fair

Over: MASTERS CREEK

1 MI W OF GREEN OAK, Bureau, IL

Built 1979 Load: 32.4 t ADT: 125

TOWNSHIP ROAD 58

Fair

Over: GREEN RIVER

4 MI SE THOMAS, Bureau, IL

Built 1979 Load: 32.4 t ADT: 50

TOWNSHIP ROAD 52

Fair

Over: HICKORY SMITH DITCH

4.5 MI NE OF MINERAL, Bureau, IL

Built 1980 Load: 32.4 t ADT: 25

TR 36

Fair

Over: HICKORY SMITH DITCH

3 MI. NE. MINERAL, Bureau, IL

Built 1995 Load: 32.4 t ADT: 25

TR-73A

Fair

Over: Crooked Creek

3.5 MI E NEW BEDFORD, Bureau, IL

Built 1977 Load: 32.4 t ADT: 50

TOWNSHIP ROAD 1

Fair

Over: GREEN RIVER

5 MI. N. NEW BEDFORD, Bureau, IL

Built 1982 Load: 32.4 t ADT: 75

TR 116

Fair

Over: WALNUT DITCH

3 MI NE NEW BEDFORD, Bureau, IL

Built 1988 Load: 32.4 t ADT: 10

TR 229A

Fair

Over: ADAMS CREEK

1 MI NW OF LADD, Bureau, IL

Built 1983 Load: 32.4 t ADT: 25

TR 214

Fair

Over: PLOW HOLLOW BRANCH

1.5 MI S OF TISKILWA, Bureau, IL

Built 2007 Load: 32.4 t ADT: 150

TR 1

Fair

Over: NORTH BUREAU CREEK

3 MI NE VAN ORIN, Bureau, IL

Built 1975 Load: 32.4 t ADT: 75

TOWNSHIP ROAD 82A

Fair

Over: GREEN RIVER

4 MI NW MANLIUS, Bureau, IL

Built 1982 Load: 32.4 t ADT: 50

TOWNSHIP RD 2

Fair

Over: KING CREEK

4 MI NW NEPONSET, Bureau, IL

Built 1979 Load: 32.4 t ADT: 75

TOWNSHIP ROAD 60B

Fair

Over: COAL CREEK

1 MI NW OF SHEFFIELD, Bureau, IL

Built 1988 Load: 32.4 t ADT: 200

TOWNSHIP ROAD 97

Fair

Over: MASTERS CREEK

5 MI SE OF OHIO, Bureau, IL

Built 1980 Load: 32.4 t ADT: 25

TR 300

Fair

Over: MASTERS CREEK

6 MI SE OF OHIO, Bureau, IL

Built 1989 Load: 32.4 t ADT: 25

TR 290

Fair

Over: MASTERS CREEK

2 MI SE OF OHIO, Bureau, IL

Built 1998 Load: 32.4 t ADT: 75

TOWNSHIP ROAD 324

Fair

Over: BRUSH CREEK

1.5 M NW OF DEPUE, Bureau, IL

Built 1984 Load: 32.4 t ADT: 50

TR 155

Fair

Over: BRUSH CREEK

1.5 M S OF ARLINGTON, Bureau, IL

Built 1981 Load: 32.4 t ADT: 50

TOWNSHIP ROAD 363

Fair

Over: SENACHWINE CREEK

5.5 MI S OF TISKILWA, Bureau, IL

Built 1980 Load: 32.4 t ADT: 25

TR 224

Fair

Over: BR OF SENACHWINE CR

4.5 M NW WHITEFIELD, Bureau, IL

Built 1983 Load: 32.4 t ADT: 10

TOWNSHIP ROAD 277

Fair

Over: BRANCH OF POND CREEK

0.5 MI S OF WYANET, Bureau, IL

Built 1980 Load: 32.4 t ADT: 50

TR 223A

Fair

Over: W. BUREAU CREEK

1.5 MI N OF WYANET, Bureau, IL

Built 2004 Load: 32.4 t ADT: 50

TR 204

Fair

Over: W. BUREAU CREEK

2.5 MI SE OF WYANET, Bureau, IL

Built 1989 Load: 32.4 t ADT: 50

TR223A

Fair

Over: MAPLE GROVE CREEK

1.5 MI N OF WYANET, Bureau, IL

Built 2004 Load: 32.4 t ADT: 50

TR 277

Fair

Over: W BUREAU CRK

2 MI SE OF WYANET, Bureau, IL

Built 2002 Load: 32.4 t ADT: 75

TOWNSHIP ROAD 99

Fair

Over: BUREAU CREEK

4 MI S OF VAN ORIN, Bureau, IL

Built 1982 Load: 32.4 t ADT: 75

TR 345

Fair

Over: SILVER CREEK

6 MI SE OF BUDA, Bureau, IL

Built 1977 Load: 32.4 t ADT: 50

FAS 253/CH 10

Fair

Over: ILL & MISS CANAL

1 MI N OF MINERAL, Bureau, IL

Built 1983 Load: 32.4 t ADT: 250

I-180

Fair

Over: ILLINOIS RIVER

1.82 MI E OF ILL 26, Bureau, IL

Built 1969 Load: 32.7 t ADT: 2,900

I-180 NB

Fair

Over: BRUSH CREEK

1.1 MI N ILL 26, Bureau, IL

Built 1968 Load: 33.0 t ADT: 1,300

I-180 SB

Fair

Over: BRUSH CREEK

1.1 MI N ILL 26, Bureau, IL

Built 1968 Load: 33.0 t ADT: 1,300

I-80 WB

Fair

Over: DRAINAGE DITCH

1.0 MI. W. OF IL 40, Bureau, IL

Built 1963 Load: 33.4 t ADT: 8,950

IL 89

Fair

Over: NEGRO CREEK

0.8 MI. S OF CHERRY, Bureau, IL

Built 1978 Load: 33.7 t ADT: 1,150

US 6 FAS 1247

Fair

Over: KING CREEK

W. EDGE OF MINERAL, Bureau, IL

Built 1955 Load: 34.0 t ADT: 1,050

US 6

Fair

Over: ADAMS CREEK

IN SEATONVILLE, Bureau, IL

Built 1986 Load: 34.3 t ADT: 2,000

FAS 253/CH 10

Fair

Over: BUREAU CO DITCH

6 MI. N. OF MINERAL, Bureau, IL

Built 2005 Load: 34.7 t ADT: 200

I-180 SB

Fair

Over: EAST BUREAU CREEK

3.4 MI S JCT FAI 80, Bureau, IL

Built 1968 Load: 35.6 t ADT: 1,300

US 34

Fair

Over: BN RR

1.1MI NE JCT ILL 26, Bureau, IL

Built 1971 Load: 35.6 t ADT: 1,500

I-180 NB

Fair

Over: EAST BUREAU CREEK

3.4 MI S JCT FAI 80, Bureau, IL

Built 1968 Load: 36.6 t ADT: 1,300

6TH STREET

Fair

Over: BNSF RAILROAD

NE EDGE OF PRINCETON, Bureau, IL

Built 1996 Load: 36.6 t ADT: 2,600

I-80 EB

Fair

Over: ABBOTT DITCH

3.44 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 36.9 t ADT: 8,950
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.