Bureau County, IL

382 public highway bridges

Bureau County Bridge Snapshot

Bureau County, Illinois contains 382 public highway bridges in the FHWA National Bridge Inventory. Roughly 37.7% are rated “Good,” 36.1% “Fair,” 13.4% “Poor,” and 13.4% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in IL are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

382
Total Bridges
37.7%
Good
13.4%
Poor
13.4%
Structurally Deficient

Condition Distribution

Good
37.7% (144)
Fair
36.1% (138)
Poor
13.4% (51)
SD
13.4% (51)

All Bridges (382)

TR 374

Fair

Over: BUREAU CREEK

3 MI. N.E. LAMOILLE, Bureau, IL

Built 1965 Load: 37.3 t ADT: 200

IL 92 FAP 587

Fair

Over: UNNAMED STREAM

1 MI. E. OF WALNUT, Bureau, IL

Built 1994 Load: 37.6 t ADT: 1,300

FAS 1246/CH 24

Fair

Over: BIG BUREAU CREEK

1 MI NW TISKILWA, Bureau, IL

Built 1989 Load: 37.9 t ADT: 250

IL 29

Fair

Over: ADAMS CREEK

NORTHEAST EDGE DEPUE, Bureau, IL

Built 1985 Load: 38.2 t ADT: 2,450

TOWNSHIP ROAD 74

Fair

Over: BR BUREAU CR

5.5 MI. W. LAMOILLE, Bureau, IL

Built 1962 Load: 38.2 t ADT: 125

I-80 EB

Fair

Over: DRAINAGE DITCH

1.0 MI. W. OF IL 40, Bureau, IL

Built 1963 Load: 38.6 t ADT: 8,950

US 6

Fair

Over: E BUREAU CREEK

1.3 MI E OF I-180, Bureau, IL

Built 1981 Load: 38.6 t ADT: 2,450

IL 92 FAP 587

Fair

Over: BUREAU CREEK

1.6 MI. W. US 34, Bureau, IL

Built 1990 Load: 38.9 t ADT: 750

I-180 NB

Fair

Over: BUREAU CREEK

1.2 MI S JCT ILL26, Bureau, IL

Built 1968 Load: 40.8 t ADT: 2,075

TR-281

Fair

Over: Brush Creek Branch

4 MI W OF DEPUE, Bureau, IL

Built 1985 Load: 41.8 t ADT: 150

I-80 EB

Fair

Over: BUREAU CREEK

2 MI. W. OF IL 26, Bureau, IL

Built 1988 Load: 43.1 t ADT: 9,500

I-80 WB

Fair

Over: BUREAU CREEK

2 MI. W. OF IL 26, Bureau, IL

Built 1988 Load: 43.1 t ADT: 9,500

TISKILWA SPUR

Fair

Over: BUREAU CREEK

0.3 MI N TISKILWA, Bureau, IL

Built 1933 Load: 43.4 t ADT: 1,100

US 6/34 FAS 1248

Fair

Over: BIG BUREAU CREEK

1.8 M W Main St Princeton, Bureau, IL

Built 1991 Load: 43.4 t ADT: 3,250

FAS 188A/CH 8

Fair

Over: POND CREEK

S EDGE OF WYANET, Bureau, IL

Built 1931 Load: 43.4 t ADT: 1,000

IL 89

Fair

Over: BRANCH OF BRUSH CR.

0.8 MI S ARLINGTON, Bureau, IL

Built 1983 Load: 44.4 t ADT: 1,500

I-180 SB

Fair

Over: IAIS RR ,I & M CANAL

0.74 MI S IL 26, Bureau, IL

Built 1968 Load: 44.7 t ADT: 2,075

I-180 NB

Fair

Over: IAIS RR, I & M CANAL

0.74 MI S IL 26, Bureau, IL

Built 1968 Load: 44.7 t ADT: 2,075

IL 29

Fair

Over: BIG BUREAU CREEK

0.1 MI S JCT ILL 26, Bureau, IL

Built 1964 Load: 45.0 t ADT: 750

TOWNSHIP ROAD 74

Fair

Over: MASTERS CREEK

6.0 MI WEST LAMOILLE, Bureau, IL

Built 1961 Load: 45.4 t ADT: 125

IL 29/26

Fair

Over: BUREAU CR OVERFLOW

0.3 MI N JCT ILL 26, Bureau, IL

Built 1965 Load: 46.0 t ADT: 750

IL 26 FAP 615

Fair

Over: E. BUREAU CREEK

.3 MI. NW OF I-180, Bureau, IL

Built 1994 Load: 46.3 t ADT: 2,350

I-80 EB

Fair

Over: COAL CREEK

3.81 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 46.7 t ADT: 8,950

I-80 WB

Fair

Over: COAL CREEK

3.82 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 46.7 t ADT: 8,950

I-80 EB

Fair

Over: ADAMS CREEK

1.8 MI W IL 89, Bureau, IL

Built 2011 Load: 47.6 t ADT: 11,450

I-80 WB

Fair

Over: ADAMS CREEK

1.8 MI W IL 89, Bureau, IL

Built 2010 Load: 47.6 t ADT: 11,450

IL 92 FAP 587

Fair

Over: BR MASTERS CR

.7 MI W VAN ORIN, Bureau, IL

Built 1932 Load: 48.3 t ADT: 650

IL 40 FAP 646

Fair

Over: DITCH # 4

3 MI. N. OF I-80, Bureau, IL

Built 1993 Load: 49.9 t ADT: 2,400

TR 10A

Fair

Over: SOUTH DITCH

N OF MINERAL, Bureau, IL

Built 1963 Load: 50.5 t ADT: 10

IL 40 FAP 646

Fair

Over: COAL CREEK

1.2 MI S OF BUDA, Bureau, IL

Built 1986 Load: 50.5 t ADT: 1,100

I-80 WB

Fair

Over: WEST BUREAU CREEK

2 MI N WYANET, Bureau, IL

Built 1963 Load: 50.9 t ADT: 9,500

I-80 EB

Fair

Over: WEST BUREAU CREEK

2 MI N WYANET, Bureau, IL

Built 1963 Load: 50.9 t ADT: 9,500

IL 40 FAP 646

Fair

Over: WALNUT SPECIAL DITCH

3.1 MI S JCT ILL 92, Bureau, IL

Built 1933 Load: 52.8 t ADT: 1,950

IL 92 FAP 587

Fair

Over: STREAM

3.3 MI. W. OF US 34, Bureau, IL

Built 1991 Load: 53.1 t ADT: 750

IL 26 FAS 2245

Fair

Over: STREAM

1 MI SE FAI 180, Bureau, IL

Built 1935 Load: 55.7 t ADT: 625

I-80 WB

Fair

Over: SPRING CREEK

1.7 MI E JCT IL 89, Bureau, IL

Built 2009 Load: 65.4 t ADT: 12,200

US 34 FAP 613

Fair

Over: E. FORK SPOON RIVER

0.6 MI NE NEPONSET, Bureau, IL

Built 1974 Load: 86.2 t ADT: 1,650

WASHINGTON ST.

Good

Over: BN RR

S EDGE OF BUDA, Bureau, IL

Built 2008 Load: 22.7 t ADT: 150

TR-134

Good

Over: WALNUT DITCH

1.5 MI. S. NORMANDY, Bureau, IL

Built 1934 Load: 23.0 t ADT: 225

TR 97

Good

Over: LIME CREEK

4 MI S OF OHIO, Bureau, IL

Built 1925 Load: 24.3 t ADT: 25

TR 274

Good

Over: BR OF BUREAU CREEK

5 MI. E. OF TISKILWA, Bureau, IL

Built 1965 Load: 25.9 t ADT: 175

TR 123

Good

Over: BRUSH CREEK

1.5 MI. E. ARLINGTON, Bureau, IL

Built 1970 Load: 30.8 t ADT: 50

IL 29

Good

Over: stream

0.99 mi N 078 Co Ln, Bureau, IL

Built 1999 Load: 32.4 t ADT: 350

US 6/34

Good

Over: DRAINAGE DITCH

.5 MI. W. WYANET, Bureau, IL

Built 1993 Load: 32.4 t ADT: 2,000

CH 23

Good

Over: PLOW HOLLOW CREEK

1 MI E OF TISKILWA, Bureau, IL

Built 1998 Load: 32.4 t ADT: 375

CH 19

Good

Over: EAST BR BUREAU CREEK

1 MI. N. OF ZEARING, Bureau, IL

Built 1997 Load: 32.4 t ADT: 100

CO HIGHWAY 33

Good

Over: BRUSH CREEK

3 MI NW OF LADD, Bureau, IL

Built 2004 Load: 32.4 t ADT: 450

FAS-1235 (CH-19)

Good

Over: Br East Bureau Cr

2 Mi. NE Malden, Bureau, IL

Built 2017 Load: 32.4 t ADT: 100

FAS 188/CH 8 (1400

Good

Over: TRIB W. BUREAU CREEK

7 MI. S. OF WALNUT, Bureau, IL

Built 1991 Load: 32.4 t ADT: 650

FAS 184/ CH 11

Good

Over: BUREAU CREEK

1.5 MI N LAMOILLE, Bureau, IL

Built 2011 Load: 32.4 t ADT: 775

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial