Bureau County, IL

382 public highway bridges

Bureau County Bridge Snapshot

Bureau County, Illinois contains 382 public highway bridges in the FHWA National Bridge Inventory. Roughly 37.7% are rated “Good,” 36.1% “Fair,” 13.4% “Poor,” and 13.4% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in IL are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

382
Total Bridges
37.7%
Good
13.4%
Poor
13.4%
Structurally Deficient

Condition Distribution

Good
37.7% (144)
Fair
36.1% (138)
Poor
13.4% (51)
SD
13.4% (51)

All Bridges (382)

FAS 245/CH 9

Good

Over: BR. WEST BUREAU CRK.

4.5 MI. N. WYANET, Bureau, IL

Built 1995 Load: 45.4 t ADT: 475

I-80 EB

Good

Over: BN RR

2.6 MI W JCT I-180, Bureau, IL

Built 2012 Load: 45.7 t ADT: 9,300

I-80 WB

Good

Over: BN RR

2.6 MI W JCT I-180, Bureau, IL

Built 2012 Load: 45.7 t ADT: 9,300

COUNTY HIGHWAY NO

Good

Over: ADAMS CREEK

2.0 MI NW LADD, Bureau, IL

Built 2008 Load: 45.7 t ADT: 600

US 6

Good

Over: BRUSH CREEK

W OF DEPUE SPUR, Bureau, IL

Built 2007 Load: 46.0 t ADT: 2,450

I-80 EB

Good

Over: Hennepin Canal

0.9 mi W of IL 40, Bureau, IL

Built 2014 Load: 46.3 t ADT: 8,950

TR 111

Good

Over: BRUSH CREEK

3.5 MI NE ARLINGTON, Bureau, IL

Built 2022 Load: 46.3 t ADT: 50

TOWNSHIP ROAD 238

Good

Over: CROW CREEK

9 MI S OF TISKILWA, Bureau, IL

Built 2018 Load: 46.3 t ADT: 25

I-80 WB

Good

Over: Hennepin Canal

0.9 Mi. W. of IL 40, Bureau, IL

Built 2015 Load: 46.7 t ADT: 8,950

IL 26/29

Good

Over: HENNEPIN CANAL

S EDGE BUREAU JCT., Bureau, IL

Built 1988 Load: 47.6 t ADT: 750

I-80 EB

Good

Over: EAST BUREAU CREEK

1.2 MI E JCT I-180, Bureau, IL

Built 2011 Load: 47.6 t ADT: 11,450

I-80 WB

Good

Over: EAST BUREAU CREEK

1.2 MI E JCT I-180, Bureau, IL

Built 2010 Load: 47.6 t ADT: 11,450

TR 130

Good

Over: SILVER CREEK

7 MI SE OF BUDA, Bureau, IL

Built 2022 Load: 48.0 t ADT: 75

IL 71

Good

Over: STREAM

0.1 MI E OF ILL 26S, Bureau, IL

Built 1968 Load: 48.0 t ADT: 3,400

IL 89 FAP 698

Good

Over: RI RAILROAD

0.60 MI S OF US 6, Bureau, IL

Built 2008 Load: 48.6 t ADT: 4,450

I-80 EB

Good

Over: MAPLE GROVE CREEK

2 MI N WYANET, Bureau, IL

Built 1963 Load: 49.2 t ADT: 9,500

I-80 WB

Good

Over: MAPLE GROVE CREEK

2 MI N WYANET, Bureau, IL

Built 1963 Load: 49.2 t ADT: 9,500

US 6/34

Good

Over: WEST BUREAU CREEK

AT EAST EDGE WYANET, Bureau, IL

Built 2000 Load: 49.6 t ADT: 3,450

TOWNSHIP RD 60 B

Good

Over: SMITH DITCH

3.5 MI. NW SHEFFIELD, Bureau, IL

Built 2018 Load: 49.9 t ADT: 75

IL 89 FAP 698

Good

Over: PIKE CREEK

0.50 MI S JCT US 34, Bureau, IL

Built 2011 Load: 53.5 t ADT: 1,100

TR 214

Good

Over: Trib Plow Hollow Creek

2 MI SW Tiskilwa, Bureau, IL

Built 2023 Load: 57.3 t ADT: 150

TR 148

Good

Over: UNNAMED STREAM

2.5 MI E OF BUDA, Bureau, IL

Built 1989 Load: 58.6 t ADT: 50

IL 29 FAS 1252

Good

Over: DRAINAGE DITCH

EAST EDGE OF DEPUE, Bureau, IL

Built 1991 Load: 61.2 t ADT: 2,450

TR 170-B

Good

Over: BR W. BUREAU CREEK

1 MI NE OF WYANET, Bureau, IL

Built 1998 Load: 63.2 t ADT: 25

US 6/34 FAP 613

Good

Over: COAL CREEK

W.EDGE OF SHEFFIELD, Bureau, IL

Built 1981 Load: 64.8 t ADT: 2,050

FAS248 (PIG FARM R

Good

Over: SENACHWINE CREEK

4 MI. SE TISKILWA, Bureau, IL

Built 1994 Load: 65.1 t ADT: 400

I-80 EB

Good

Over: SPRING CREEK

1.7 MI E JCT IL 89, Bureau, IL

Built 2010 Load: 65.4 t ADT: 12,200

US 34 FAP 587

Good

Over: PIKE CREEK

1 MI NE OF LAMOILLE, Bureau, IL

Built 2012 Load: 70.0 t ADT: 1,350

IL 26

Good

Over: Big Bureau Creek

1.65 M N of I-80, Bureau, IL

Built 2018 Load: 70.6 t ADT: 3,250

I-80 EB

Good

Over: IL RAILNET

1.9 MI E JCT IL 89, Bureau, IL

Built 2010 Load: 78.4 t ADT: 12,200

I-80 WB

Good

Over: IL RAILNET

1.9 MI E JCT IL 89, Bureau, IL

Built 2009 Load: 78.4 t ADT: 12,200

WALNUT STREET

Poor

Over: ROCKY RUN CREEK

CENTER OF TISKILWA, Bureau, IL

Built 1965 ADT: 75

FAS 1246/CH 24

Poor

Over: COAL CREEK

1.5 MI WEST OF BUDA, Bureau, IL

Built 1955 Load: 12.6 t ADT: 325

TR 360

Poor

Over: E. BUREAU CREEK

1.5 MI. W. ARLINGTON, Bureau, IL

Built 1954 Load: 14.9 t ADT: 100

FAS1240/CH14/Peru

Poor

Over: ADAMS CREEK

SEATONVILLE, Bureau, IL

Built 1987 Load: 16.2 t ADT: 475

TR 82C

Poor

Over: HICKORY CREEK

3.0 MI N SHEFFIELD, Bureau, IL

Built 1935 Load: 17.5 t ADT: 200

TR 34

Poor

Over: W FORK SPOON RIVER

3 MI S OF NEPONSET, Bureau, IL

Built 1965 Load: 17.5 t ADT: 25

TR 202

Poor

Over: W. BUREAU CREEK

6.5 MI SE OF WALNUT, Bureau, IL

Built 1915 Load: 17.8 t ADT: 25

JEFFERSON STREET

Poor

Over: ROCKY RUN CREEK

W CENTER OF TISKILWA, Bureau, IL

Built 1925 Load: 17.8 t ADT: 125

TR 18

Poor

Over: W FORK SPOON RIVER

4 MI SW OF NEPONSET, Bureau, IL

Built 1956 Load: 18.8 t ADT: 75

TR 355

Poor

Over: SENACHWINE CREEK

4.5 MI S OF TISKILWA, Bureau, IL

Built 1954 Load: 20.1 t ADT: 50

TOWNSHIP ROAD 3

Poor

Over: SILVER CREEK

7 MI S OF BUDA, Bureau, IL

Built 1970 Load: 20.4 t ADT: 20

TR-109

Poor

Over: LIME CREEK

4 MI. W. GREEN OAK, Bureau, IL

Built 1959 Load: 21.4 t ADT: 150

TR 312

Poor

Over: Masters Fork

4 MI W OF LA MOILLE, Bureau, IL

Built 1915 Load: 21.7 t ADT: 25

TR 68

Poor

Over: SPOON RIVER EAST FOR

1.5 MI. SE. NEPONSET, Bureau, IL

Built 1965 Load: 21.7 t ADT: 25

TR 336

Poor

Over: PIKE CREEK

2.5 MI SW LAMOILLE, Bureau, IL

Built 1910 Load: 22.7 t ADT: 25

TR 152

Poor

Over: WALNUT DITCH

1 MI W OF WALNUT, Bureau, IL

Built 1965 Load: 23.0 t ADT: 50

TR 361

Poor

Over: FOX CREEK

3 MI NW OF MILO, Bureau, IL

Built 1968 Load: 23.7 t ADT: 25

TR-186

Poor

Over: Branch Bureau Creek

2 MI W OF TISKILWA, Bureau, IL

Built 1948 Load: 24.3 t ADT: 75

TR 235C

Poor

Over: COAL CREEK

3 MI E OF MINERAL, Bureau, IL

Built 1925 Load: 24.9 t ADT: 10

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial