Bureau County, IL

382 public highway bridges

Bureau County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Bureau County, Illinois contains 382 public highway bridges. Roughly 37.7% are rated “Good,” 36.1% “Fair,” and 13.4% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

382
Total Bridges
37.7%
Good
36.1%
Fair
13.4%
Poor Condition

Condition Distribution

Good
37.7% (144)
Fair
36.1% (138)
Poor
13.4% (51)

All Bridges (382)

TR 338

Good

Over: BRANCH BUREAU CREEK

2 MI NW OF LAMOILLE, Bureau, IL

Built 1988 Load: 32.4 t ADT: 50

TR 328

Good

Over: BR OF BUREAU CREEK

1.5 M N OF VAN ORIN, Bureau, IL

Built 1985 Load: 32.4 t ADT: 75

TR 21A

Good

Over: BUREAU CREEK BRANCH

2 MI NW OF VAN ORIN, Bureau, IL

Built 1987 Load: 32.4 t ADT: 50

TR 320

Good

Over: BUREAU CREEK BRANCH

1 MI W OF VAN ORIN, Bureau, IL

Built 2000 Load: 32.4 t ADT: 50

TR 306 - 2400E

Good

Over: TRIB. MASTERS CREEK

2 MI NW OF VAN ORIN, Bureau, IL

Built 1994 Load: 32.4 t ADT: 50

TR 21A

Good

Over: BUREAU CREEK BRANCH

2 MI NW OF LA MOILLE, Bureau, IL

Built 2003 Load: 32.4 t ADT: 50

TR 87

Good

Over: PIKE CREEK

1 MI S OF LA MOILLE, Bureau, IL

Built 2006 Load: 32.4 t ADT: 25

TR 21A

Good

Over: BRANCH OF BUREAU CR

1 MILE NE VAN ORIN, Bureau, IL

Built 2012 Load: 32.4 t ADT: 50

TR 96A

Good

Over: COAL CREEK

1 MI. SW. OF BUDA, Bureau, IL

Built 2000 Load: 32.4 t ADT: 50

TOWNSHIP ROAD 327

Good

Over: COAL CREEK

2 MI S OF BUDA, Bureau, IL

Built 2006 Load: 32.4 t ADT: 75

TOWNSHIP ROAD 139

Good

Over: W. BUREAU CREEK

5 M NW OF PRINCETON, Bureau, IL

Built 1983 Load: 32.4 t ADT: 125

TR 109

Good

Over: W BUREAU CREEK

6.5 M SE OF WALNUT, Bureau, IL

Built 1984 Load: 32.4 t ADT: 35

TOWNSHIP ROAD 182

Good

Over: W BUREAU CREEK

4 MI N OF WYANET, Bureau, IL

Built 1987 Load: 32.4 t ADT: 75

TOWNSHIP ROAD 177

Good

Over: W BUREAU CREEK

4.5 M N OF WYANET, Bureau, IL

Built 1987 Load: 32.4 t ADT: 50

TR 109

Good

Over: West Bureau Creek

7 Mi NW Princeton, Bureau, IL

Built 2013 Load: 32.4 t ADT: 150

FAS 1220/CH 12-220

Good

Over: BR. W. BUREAU CREEK

7 MI E OF MANLIUS, Bureau, IL

Built 1994 Load: 32.4 t ADT: 300

OAK STREET

Good

Over: HICKORY CREEK

MANLIUS, Bureau, IL

Built 2001 Load: 32.4 t ADT: 100

Epperson Road

Good

Over: EPPERSON RUN

W EDGE OF PRINCETON, Bureau, IL

Built 2020 Load: 32.4 t ADT: 550

MS-6050A (Main St)

Good

Over: Walnut Ditch

SW EDGE OF WALNUT, Bureau, IL

Built 2018 Load: 32.4 t ADT: 825

TOWNSHIP ROAD 37A

Good

Over: BR OF BUREAU CREEK

1.5 M NW OF LAMOILLE, Bureau, IL

Built 1980 Load: 33.0 t ADT: 50

US 6 FAS 1247

Good

Over: SOUTH DITCH

1 MI. E. OF MINERAL, Bureau, IL

Built 1993 Load: 33.7 t ADT: 950

IL 92

Good

Over: Hennepin FeederCanal

1.0mi E of IL 172, Bureau, IL

Built 2022 Load: 34.3 t ADT: 600

US 6/34 FAP 613

Good

Over: DEVIL'S SLOUGH DITCH

1.6 MI W OF IL 40, Bureau, IL

Built 2002 Load: 35.3 t ADT: 2,400

TR-321 Cannonball

Good

Over: E Fork Spoon River

1 MI. E. NEPONSET, Bureau, IL

Built 1993 Load: 35.6 t ADT: 75

FAS 253/CH 10

Good

Over: HICKORY CREEK

2.5 MI. N. MINERAL, Bureau, IL

Built 1949 Load: 36.0 t ADT: 200

FAS 244

Good

Over: BUREAU CREEK

2 MI NW PRINCETON, Bureau, IL

Built 2016 Load: 36.6 t ADT: 950

TR-111

Good

Over: Brush Creek

2 MI NE ARLINGTON, Bureau, IL

Built 1984 Load: 36.6 t ADT: 50

I-80 WB

Good

Over: ABBOTT DITCH

3.45 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 36.9 t ADT: 8,950

US 6 FAS 1247

Good

Over: LAWSON CREEK

1.6 MI. W. OF US 34, Bureau, IL

Built 1993 Load: 36.9 t ADT: 950

TR 3

Good

Over: BR OF CROW CR

T14N -R8E-4PM-SEC 36, Bureau, IL

Built 1900 Load: 37.3 t ADT: 75

IL 26 FAP 316

Good

Over: LIME CREEK

1 MI S OF KASBEER, Bureau, IL

Built 2005 Load: 37.6 t ADT: 2,300

IL 89

Good

Over: Brush Creek

6.3 M N of I-80, Bureau, IL

Built 2018 Load: 38.6 t ADT: 1,500

TR 281

Good

Over: EAST BUREAU CREEK

3 1/2 MI W OF DE PUE, Bureau, IL

Built 2020 Load: 38.6 t ADT: 150

I-80 EB

Good

Over: KING CREEK

1.04 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 38.9 t ADT: 8,950

I-80 WB

Good

Over: KING CREEK

1.05 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 38.9 t ADT: 8,950

IL 92 FAP 587

Good

Over: WALNUT CREEK

2 MI. W. OF IL 26, Bureau, IL

Built 1999 Load: 38.9 t ADT: 1,300

FAS 1246/CH 24

Good

Over: BRANCH OF POND CREEK

2.0 MI S WYANET, Bureau, IL

Built 2021 Load: 39.2 t ADT: 325

IL 40 FAP 646

Good

Over: SPOON CREEK TRIB 1

2.3 MI N OF STARK CO, Bureau, IL

Built 1985 Load: 39.5 t ADT: 1,100

IL 89 (FAP 698)

Good

Over: ILLINOIS RIVER

0.91M S of US 6, Bureau, IL

Built 2018 Load: 40.2 t ADT: 4,450

US 6

Good

Over: SPRING CR& ABANDN RR

E EDGE SPRING VALLEY, Bureau, IL

Built 1994 Load: 41.5 t ADT: 10,050

JEFFERSON STREET

Good

Over: ROCKY RUN CREEK

W CENTER OF TISKILWA, Bureau, IL

Built 2021 Load: 41.5 t ADT: 125

I-80 EB

Good

Over: BARBARA DITCH

1.51 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 42.1 t ADT: 8,950

I-80 WB

Good

Over: BARBARA DITCH

1.52 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 42.1 t ADT: 8,950

IL 40 FAP 646

Good

Over: HICKORY CREEK

3.5 MI. N. OF I-80, Bureau, IL

Built 1993 Load: 42.1 t ADT: 2,400

US 34 FAS 1249

Good

Over: PIKE CREEK

0.5 MI SW/LAMOILLE, Bureau, IL

Built 2011 Load: 42.1 t ADT: 1,000

US 6/34

Good

Over: DRAINAGE DITCH

2.5 MI. W. WYANET, Bureau, IL

Built 1993 Load: 42.4 t ADT: 2,000

NEW BEDFORD RD

Good

Over: GREEN RIVER

0.6 MI W JCT IL 40, Bureau, IL

Built 2006 Load: 42.8 t ADT: 50

FAS-248 Galena St.

Good

Over: Rocky Run Creek

CENTER OF TISKILWA, Bureau, IL

Built 1986 Load: 42.8 t ADT: 1,100

IL 92 FAP 587

Good

Over: BR. OF MASTERS CREEK

1.2 MI. W. VAN ORIN, Bureau, IL

Built 1994 Load: 44.1 t ADT: 650

CH 8

Good

Over: MAPLE GROVE CREEK

2 MI N OF WYANET, Bureau, IL

Built 2021 Load: 44.7 t ADT: 700
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.