Bureau County, IL

382 public highway bridges

Bureau County Bridge Snapshot

Bureau County, Illinois contains 382 public highway bridges in the FHWA National Bridge Inventory. Roughly 37.7% are rated “Good,” 36.1% “Fair,” 13.4% “Poor,” and 13.4% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in IL are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

382
Total Bridges
37.7%
Good
13.4%
Poor
13.4%
Structurally Deficient

Condition Distribution

Good
37.7% (144)
Fair
36.1% (138)
Poor
13.4% (51)
SD
13.4% (51)

All Bridges (382)

TR 338

Good

Over: BRANCH BUREAU CREEK

2 MI NW OF LAMOILLE, Bureau, IL

Built 1988 Load: 32.4 t ADT: 50

TR 328

Good

Over: BR OF BUREAU CREEK

1.5 M N OF VAN ORIN, Bureau, IL

Built 1985 Load: 32.4 t ADT: 75

TR 21A

Good

Over: BUREAU CREEK BRANCH

2 MI NW OF VAN ORIN, Bureau, IL

Built 1987 Load: 32.4 t ADT: 50

TR 320

Good

Over: BUREAU CREEK BRANCH

1 MI W OF VAN ORIN, Bureau, IL

Built 2000 Load: 32.4 t ADT: 50

TR 306 - 2400E

Good

Over: TRIB. MASTERS CREEK

2 MI NW OF VAN ORIN, Bureau, IL

Built 1994 Load: 32.4 t ADT: 50

TR 21A

Good

Over: BUREAU CREEK BRANCH

2 MI NW OF LA MOILLE, Bureau, IL

Built 2003 Load: 32.4 t ADT: 50

TR 87

Good

Over: PIKE CREEK

1 MI S OF LA MOILLE, Bureau, IL

Built 2006 Load: 32.4 t ADT: 25

TR 21A

Good

Over: BRANCH OF BUREAU CR

1 MILE NE VAN ORIN, Bureau, IL

Built 2012 Load: 32.4 t ADT: 50

TR 96A

Good

Over: COAL CREEK

1 MI. SW. OF BUDA, Bureau, IL

Built 2000 Load: 32.4 t ADT: 50

TOWNSHIP ROAD 327

Good

Over: COAL CREEK

2 MI S OF BUDA, Bureau, IL

Built 2006 Load: 32.4 t ADT: 75

TOWNSHIP ROAD 139

Good

Over: W. BUREAU CREEK

5 M NW OF PRINCETON, Bureau, IL

Built 1983 Load: 32.4 t ADT: 125

TR 109

Good

Over: W BUREAU CREEK

6.5 M SE OF WALNUT, Bureau, IL

Built 1984 Load: 32.4 t ADT: 35

TOWNSHIP ROAD 182

Good

Over: W BUREAU CREEK

4 MI N OF WYANET, Bureau, IL

Built 1987 Load: 32.4 t ADT: 75

TOWNSHIP ROAD 177

Good

Over: W BUREAU CREEK

4.5 M N OF WYANET, Bureau, IL

Built 1987 Load: 32.4 t ADT: 50

TR 109

Good

Over: West Bureau Creek

7 Mi NW Princeton, Bureau, IL

Built 2013 Load: 32.4 t ADT: 150

FAS 1220/CH 12-220

Good

Over: BR. W. BUREAU CREEK

7 MI E OF MANLIUS, Bureau, IL

Built 1994 Load: 32.4 t ADT: 300

OAK STREET

Good

Over: HICKORY CREEK

MANLIUS, Bureau, IL

Built 2001 Load: 32.4 t ADT: 100

Epperson Road

Good

Over: EPPERSON RUN

W EDGE OF PRINCETON, Bureau, IL

Built 2020 Load: 32.4 t ADT: 550

MS-6050A (Main St)

Good

Over: Walnut Ditch

SW EDGE OF WALNUT, Bureau, IL

Built 2018 Load: 32.4 t ADT: 825

TOWNSHIP ROAD 37A

Good

Over: BR OF BUREAU CREEK

1.5 M NW OF LAMOILLE, Bureau, IL

Built 1980 Load: 33.0 t ADT: 50

US 6 FAS 1247

Good

Over: SOUTH DITCH

1 MI. E. OF MINERAL, Bureau, IL

Built 1993 Load: 33.7 t ADT: 950

IL 92

Good

Over: Hennepin FeederCanal

1.0mi E of IL 172, Bureau, IL

Built 2022 Load: 34.3 t ADT: 600

US 6/34 FAP 613

Good

Over: DEVIL'S SLOUGH DITCH

1.6 MI W OF IL 40, Bureau, IL

Built 2002 Load: 35.3 t ADT: 2,400

TR-321 Cannonball

Good

Over: E Fork Spoon River

1 MI. E. NEPONSET, Bureau, IL

Built 1993 Load: 35.6 t ADT: 75

FAS 253/CH 10

Good

Over: HICKORY CREEK

2.5 MI. N. MINERAL, Bureau, IL

Built 1949 Load: 36.0 t ADT: 200

FAS 244

Good

Over: BUREAU CREEK

2 MI NW PRINCETON, Bureau, IL

Built 2016 Load: 36.6 t ADT: 950

TR-111

Good

Over: Brush Creek

2 MI NE ARLINGTON, Bureau, IL

Built 1984 Load: 36.6 t ADT: 50

I-80 WB

Good

Over: ABBOTT DITCH

3.45 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 36.9 t ADT: 8,950

US 6 FAS 1247

Good

Over: LAWSON CREEK

1.6 MI. W. OF US 34, Bureau, IL

Built 1993 Load: 36.9 t ADT: 950

TR 3

Good

Over: BR OF CROW CR

T14N -R8E-4PM-SEC 36, Bureau, IL

Built 1900 Load: 37.3 t ADT: 75

IL 26 FAP 316

Good

Over: LIME CREEK

1 MI S OF KASBEER, Bureau, IL

Built 2005 Load: 37.6 t ADT: 2,300

IL 89

Good

Over: Brush Creek

6.3 M N of I-80, Bureau, IL

Built 2018 Load: 38.6 t ADT: 1,500

TR 281

Good

Over: EAST BUREAU CREEK

3 1/2 MI W OF DE PUE, Bureau, IL

Built 2020 Load: 38.6 t ADT: 150

I-80 EB

Good

Over: KING CREEK

1.04 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 38.9 t ADT: 8,950

I-80 WB

Good

Over: KING CREEK

1.05 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 38.9 t ADT: 8,950

IL 92 FAP 587

Good

Over: WALNUT CREEK

2 MI. W. OF IL 26, Bureau, IL

Built 1999 Load: 38.9 t ADT: 1,300

FAS 1246/CH 24

Good

Over: BRANCH OF POND CREEK

2.0 MI S WYANET, Bureau, IL

Built 2021 Load: 39.2 t ADT: 325

IL 40 FAP 646

Good

Over: SPOON CREEK TRIB 1

2.3 MI N OF STARK CO, Bureau, IL

Built 1985 Load: 39.5 t ADT: 1,100

IL 89 (FAP 698)

Good

Over: ILLINOIS RIVER

0.91M S of US 6, Bureau, IL

Built 2018 Load: 40.2 t ADT: 4,450

US 6

Good

Over: SPRING CR& ABANDN RR

E EDGE SPRING VALLEY, Bureau, IL

Built 1994 Load: 41.5 t ADT: 10,050

JEFFERSON STREET

Good

Over: ROCKY RUN CREEK

W CENTER OF TISKILWA, Bureau, IL

Built 2021 Load: 41.5 t ADT: 125

I-80 EB

Good

Over: BARBARA DITCH

1.51 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 42.1 t ADT: 8,950

I-80 WB

Good

Over: BARBARA DITCH

1.52 E/HENRY CO LN, Bureau, IL

Built 1963 Load: 42.1 t ADT: 8,950

IL 40 FAP 646

Good

Over: HICKORY CREEK

3.5 MI. N. OF I-80, Bureau, IL

Built 1993 Load: 42.1 t ADT: 2,400

US 34 FAS 1249

Good

Over: PIKE CREEK

0.5 MI SW/LAMOILLE, Bureau, IL

Built 2011 Load: 42.1 t ADT: 1,000

US 6/34

Good

Over: DRAINAGE DITCH

2.5 MI. W. WYANET, Bureau, IL

Built 1993 Load: 42.4 t ADT: 2,000

NEW BEDFORD RD

Good

Over: GREEN RIVER

0.6 MI W JCT IL 40, Bureau, IL

Built 2006 Load: 42.8 t ADT: 50

FAS-248 Galena St.

Good

Over: Rocky Run Creek

CENTER OF TISKILWA, Bureau, IL

Built 1986 Load: 42.8 t ADT: 1,100

IL 92 FAP 587

Good

Over: BR. OF MASTERS CREEK

1.2 MI. W. VAN ORIN, Bureau, IL

Built 1994 Load: 44.1 t ADT: 650

CH 8

Good

Over: MAPLE GROVE CREEK

2 MI N OF WYANET, Bureau, IL

Built 2021 Load: 44.7 t ADT: 700

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial