Chippewa County, MN

70 public highway bridges

Chippewa County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Chippewa County, Minnesota contains 70 public highway bridges. Roughly 45.7% are rated “Good,” 41.4% “Fair,” and 10% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

70
Total Bridges
45.7%
Good
41.4%
Fair
10%
Poor Condition

Condition Distribution

Good
45.7% (32)
Fair
41.4% (29)
Poor
10% (7)

All Bridges (70)

M 24

Unknown

Over: TH 29

1.0 MI N OF JCT TH212, Chippewa, MN

Built 1959 ADT: 7,206

MSAS 105

Unknown

Over: TH 29

1.2 MI N OF JCT TH212, Chippewa, MN

Built 1959 ADT: 7,206

T 11

Fair

Over: COTTONWOOD CREEK

0.6 MI S OF CO LINE, Chippewa, MN

Built 1973 Load: 19.1 t ADT: 19

CSAH 15

Fair

Over: BRAFEES CREEK

AT THE JCT CSAH 20, Chippewa, MN

Built 1979 Load: 19.6 t ADT: 242

T 61

Fair

Over: BNSF RR

1.6 MI NW OF JCT CSAH 5, Chippewa, MN

Built 1965 Load: 20.6 t ADT: 44

T 26

Fair

Over: DITCH #7

0.8 MI E OF JCT CSAH 2, Chippewa, MN

Built 2012 Load: 21.8 t ADT: 49

T 39

Fair

Over: CO DITCH # 11

0.4 MI E OF JCT CSAH 5, Chippewa, MN

Built 1993 Load: 26.1 t ADT: 26

T 52

Fair

Over: DITCH

0.1 MI W OF JCT TH 23, Chippewa, MN

Built 1969 Load: 26.1 t ADT: 70

MN 7

Fair

Over: STREAM

0.5 MI SE OF MILAN, Chippewa, MN

Built 1932 Load: 29.4 t ADT: 1,802

MN 7

Fair

Over: CO DITCH # 11

10.5 MI E OF MONTEVIDEO, Chippewa, MN

Built 1977 Load: 29.4 t ADT: 3,804

T 55

Fair

Over: PALMER CREEK (CD #68)

0.1 MI W OF JCT CSAH 5, Chippewa, MN

Built 1964 Load: 29.4 t ADT: 50

T 54

Fair

Over: PALMER CREEK

1.5 MI W OF JCT CSAH 5, Chippewa, MN

Built 1950 Load: 29.4 t ADT: 35

T 67

Fair

Over: DITCH

1.1 MI N OF JCT CSAH 12, Chippewa, MN

Built 1976 Load: 29.4 t ADT: 20

T 31

Fair

Over: HAWK CREEK FLOODWAY

1.2 MI W OF JCT CSAH 1, Chippewa, MN

Built 1964 Load: 30.4 t ADT: 24

T 117

Fair

Over: HAWK CREEK FLOODWAY

1.8 MI N OF JCT CSAH 13, Chippewa, MN

Built 1964 Load: 32.2 t ADT: 24

T 26

Fair

Over: STREAM

0.1 MI W OF JCT TWP 117, Chippewa, MN

Built 2018 Load: 32.4 t ADT: 49

T 102

Fair

Over: JUD DITCH # 6

1.9 MI N OF JCT TH 40, Chippewa, MN

Built 1970 Load: 32.4 t ADT: 24

CSAH 17

Fair

Over: HAWK CREEK

0.5 MI E OF JCT CSAH 3, Chippewa, MN

Built 1972 Load: 33.1 t ADT: 95

CSAH 1

Fair

Over: DITCH

0.6 MI N JCT CSAH 13, Chippewa, MN

Built 2007 Load: 39.0 t ADT: 289

T 36

Fair

Over: Co Ditch # 11 Br #2

0.4 mi E of jct TH277, Chippewa, MN

Built 2002 Load: 39.2 t ADT: 18

T 221

Fair

Over: SHAKOPEE CREEK (JD #18)

1.5 MI E OF JCT CSAH 5, Chippewa, MN

Built 2002 Load: 39.2 t ADT: 25

T 151

Fair

Over: DITCH

0.7 MI E OF JCT CSAH 7, Chippewa, MN

Built 2008 Load: 39.2 t ADT: 49

T 108

Fair

Over: SHAKOPEE CREEK

0.5 MI S OF CO LINE, Chippewa, MN

Built 2011 Load: 39.2 t ADT: 49

T 117

Fair

Over: CO DITCH #7

0.9 MI S OF JCT CSAH 12, Chippewa, MN

Built 2012 Load: 39.2 t ADT: 49

CSAH 4

Fair

Over: SHAKOPEE CREEK

1.9 MI N OF JCT TH 40, Chippewa, MN

Built 2012 Load: 39.2 t ADT: 377

T 42

Fair

Over: CO DITCH # 11

0.8 MI E OF JCT CSAH 5, Chippewa, MN

Built 1994 Load: 39.2 t ADT: 29

T 105

Fair

Over: CO DITCH # 11;BR 2

0.1 MI N OF JCT TH 7, Chippewa, MN

Built 1996 Load: 40.8 t ADT: 35

T 111

Fair

Over: SHAKOPEE CREEK

1.9 MI N OF JCT TH 40, Chippewa, MN

Built 1997 Load: 40.8 t ADT: 38

T 15

Fair

Over: DITCH

1.1 MI E OF JCT CSAH 4, Chippewa, MN

Built 1998 Load: 40.8 t ADT: 24

T 21

Fair

Over: DITCH

0.3 MI W OF CO LINE, Chippewa, MN

Built 1976 Load: 41.2 t ADT: 15

T 100

Fair

Over: CO DITCH # 22

1.1 MI S OF JCT CSAH 12, Chippewa, MN

Built 1991 Load: 43.3 t ADT: 22

CSAH 6

Good

Over: CO DITCH # 22

0.5 MI N OF JCT CSAH 12, Chippewa, MN

Built 1979 Load: 19.6 t ADT: 803

T 77

Good

Over: CO DITCH # 13

1.0 MI S OF JCT TH 40, Chippewa, MN

Built 1979 Load: 19.6 t ADT: 26

MN 7

Good

Over: CO DITCH # 11,BR # 2

11.9 MI E OF MONTEVIDEO, Chippewa, MN

Built 1977 Load: 29.4 t ADT: 3,804

CSAH 4

Good

Over: CD #11

0.2 MI N OF JCT TH 23, Chippewa, MN

Built 2020 Load: 32.4 t ADT: 234

CSAH 15

Good

Over: PALMER CREEK

0.4 MI W OF JCT CSAH 5, Chippewa, MN

Built 2016 Load: 32.4 t ADT: 265

T 94

Good

Over: DRY WEATHER CREEK

0.9 MI N OF JCT CSAH 13, Chippewa, MN

Built 2017 Load: 32.4 t ADT: 49

T 151

Good

Over: DRY WEATHER CREEK

0.1 MI E OF JCT TH 29, Chippewa, MN

Built 2017 Load: 32.4 t ADT: 49

T 26

Good

Over: DITCH

0.6 MI E OF JCT CSAH 7, Chippewa, MN

Built 2017 Load: 32.4 t ADT: 49

T 157

Good

Over: JD #7 (HAWK CREEK)

0.5 MI E OF JCT CSAH 2, Chippewa, MN

Built 2019 Load: 32.4 t ADT: 49

CSAH 13

Good

Over: STREAM

0.3 MI E OF JCT CSAH 2, Chippewa, MN

Built 2019 Load: 32.4 t ADT: 239

T 98

Good

Over: CO DITCH # 22

0.3 MI N OF JCT CSAH 12, Chippewa, MN

Built 2021 Load: 32.4 t ADT: 49

CSAH 12

Good

Over: TRIB DRY WEATHER CREEK

1.1 MI E OF JCT CSAH 7, Chippewa, MN

Built 2022 Load: 32.4 t ADT: 30

T 151

Good

Over: DRY WEATHER CREEK

0.3 MI E OF JCT CSAH 7, Chippewa, MN

Built 2021 Load: 32.4 t ADT: 49

T 92

Good

Over: DRY WEATHER CREEK

1.3 MI N OF JCT CSAH 13, Chippewa, MN

Built 2021 Load: 32.4 t ADT: 49

MN 40

Good

Over: CO DITCH 16

18.0 MI W OF WILLMAR, Chippewa, MN

Built 2021 Load: 32.4 t ADT: 753

T 236

Good

Over: BRAFEES CREEK

0.1 MI S OF JCT CSAH 20, Chippewa, MN

Built 1984 Load: 35.9 t ADT: 100

T 20

Good

Over: DITCH

0.4 MI E OF JCT CSAH 3, Chippewa, MN

Built 1990 Load: 35.9 t ADT: 16

T 63

Good

Over: PALMER CREEK

1.9 MI NW OF JCT CSAH 5, Chippewa, MN

Built 1977 Load: 35.9 t ADT: 56

T 52

Good

Over: HAWK CREEK FLOODWAY

1.4 MI E OF JCT CSAH 3, Chippewa, MN

Built 2023 Load: 37.6 t ADT: 49
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.