Clark County, NV

1,175 public highway bridges

Clark County Bridge Snapshot

Clark County, Nevada contains 1,175 public highway bridges in the FHWA National Bridge Inventory. Roughly 52.1% are rated “Good,” 26.7% “Fair,” 0.2% “Poor,” and 0.2% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in NV are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

1,175
Total Bridges
52.1%
Good
0.2%
Poor
0.2%
Structurally Deficient

Condition Distribution

Good
52.1% (612)
Fair
26.7% (314)
Poor
0.2% (2)
SD
0.2% (2)

All Bridges (1,175)

CC215 N BELTWAY

Good

Over: CHANNEL

CITY OF NORTH LAS VEGAS, Clark, NV

Built 2002 Load: 99.9 t ADT: 8,350

JONES BLVD

Good

Over: CHANNEL

SW LAS VEGAS, Clark, NV

Built 2000 Load: 99.9 t ADT: 3,300

LINDELL RD

Good

Over: CHANNEL

SW LAS VEGAS, Clark, NV

Built 2000 Load: 99.9 t ADT: 1,100

RUSSELL RD

Good

Over: CHANNEL

SW LAS VEGAS, Clark, NV

Built 2000 Load: 99.9 t ADT: 1,000

DECATUR BLVD

Good

Over: CHANNEL

SW LAS VEGAS, Clark, NV

Built 2000 Load: 99.9 t ADT: 32,000

OLD MILL RD

Good

Over: CHANNEL

MESQUITE, Clark, NV

Built 2000 Load: 99.9 t ADT: 303

BERTHA HOWE LN

Good

Over: CHANNEL

MESQUITE, Clark, NV

Built 2006 Load: 99.9 t ADT: 1,000

PASEO VERDE PWY

Good

Over: CHANNEL

HENDERSON, Clark, NV

Built 2004 Load: 99.9 t ADT: 8,500

WASHBURN RD

Good

Over: UPPER LV WASH CHANNEL

NORTH LAS VEGAS, Clark, NV

Built 2004 Load: 99.9 t ADT: 5,200

HARDY WAY

Good

Over: CHANNAL

WEST MESQUITE, Clark, NV

Built 2009 Load: 99.9 t ADT: 1,000

Grand Central Pkwy

Good

Over: Drainage

0.2 mi S of Charleston, Clark, NV

Built 2019 Load: 99.9 t ADT: 13,600

CANYON CREST BLVD

Good

Over: TOWN WASH

NORTH OF MESQUITE, Clark, NV

Built 2010 Load: 99.9 t ADT: 1,000

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2018 Load: 99.9 t ADT: 17,100

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2017 Load: 99.9 t ADT: 17,100

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2017 Load: 99.9 t ADT: 17,100

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2017 Load: 99.9 t ADT: 17,100

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2017 Load: 99.9 t ADT: 17,100

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2017 Load: 99.9 t ADT: 17,100

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2017 Load: 99.9 t ADT: 17,100

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2017 Load: 99.9 t ADT: 17,100

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2017 Load: 99.9 t ADT: 17,100

I11

Good

Over: DRAINAGE

BOULDER CITY, Clark, NV

Built 2017 Load: 99.9 t ADT: 17,100

S BUFFALO DRIVE

Good

Over: WASH

N of BLUE DIAMOND, Clark, NV

Built 2017 Load: 99.9 t ADT: 11,000

US93, FRCL07

Good

Over: WASH

1 mi N of US93 @ GARNET I, Clark, NV

Built 2020 Load: 99.9 t ADT: 4,200

US93 MP 55.50

Good

Over: CHANNEL

MP 53 N OF I15 JCT, Clark, NV

Built 2019 Load: 99.9 t ADT: 4,200

ACCESS TO FRCL07

Good

Over: CHANNEL

MP 52 N OF I15 JCT, Clark, NV

Built 2019 Load: 99.9 t ADT: 5

ACCESS TO FRCL07

Good

Over: CHANNEL

MP 52 N OF I15 JCT, Clark, NV

Built 2019 Load: 99.9 t ADT: 5

W SUNSET RD

Good

Over: BLUE DIAMOND WASH

500 ft E of Lindell Rd, Clark, NV

Built 2015 Load: 99.9 t ADT: 20,700

US95

Good

Over: DRY WASH

1.8 mi S of SILVER PEAK R, Clark, NV

Built 2020 Load: 99.9 t ADT: 2,900

US93

Good

Over: CHANNEL

COYOTE SPRINGS GOLF CLUB, Clark, NV

Built 2020 Load: 99.9 t ADT: 2,350

VALLEY VIEW BLVD

Good

Over: FLAMINGO WASH

LAS VEGAS, Clark, NV

Built 2020 Load: 99.9 t ADT: 8,650

W Harmon

Good

Over: Flamingo Wash

Harmon @ Arville, Clark, NV

Built 2020 Load: 99.9 t ADT: 4,850

Alexander Drive

Good

Over: Vandenberg Wash

1/5 mi East of N Lamb Blv, Clark, NV

Built 2021 Load: 99.9 t ADT: 5,800

GRAND CENTRAL PKWY

Good

Over: UPRR

NEON GATEWAY, Clark, NV

Built 2019 Load: 99.9 t ADT: 13,600

I 15

Good

Over: UPRR

LAS VEGAS, Clark, NV

Built 2018 Load: 99.9 t ADT: 94,400

I 15

Good

Over: UPRR

LAS VEGAS, Clark, NV

Built 2018 Load: 99.9 t ADT: 94,400

I15N Flyover-215S

Good

Over: UPRR, RangeRD, I15,R1,R4

NORTH LAS VEGAS, Clark, NV

Built 2022 Load: 99.9 t ADT: 7,700

I 215 NORTH

Good

Over: UNION PACIFIC RR

NORTH LAS VEGAS, Clark, NV

Built 2022 Load: 99.9 t ADT: 7,250

Valley View Ave S

Good

Over: UPRR-W Harmon Ramp, S VV

Across I-15 from City Cen, Clark, NV

Built 2020 Load: 99.9 t ADT: 14,000

I 15 RAMP TO SP. M

Good

Over: TWAIN AVE

LAS VEGAS, Clark, NV

Built 1999 Load: 99.9 t ADT: 26,100

ELKHORN DROP RAMP

Good

Over: US95 + MEDIAN

1.18mi N of 215, Clark, NV

Built 2019 Load: 99.9 t ADT: 500

ACCESS ROAD

Good

Over: SUNSET ROAD

SOUTH WEST OF LAS VEGAS, Clark, NV

Built 2012 Load: 99.9 t ADT: 10

US 215S

Good

Over: MCCARRAN A/P CONNECTOR

S of AIRPORT, Clark, NV

Built 2017 Load: 99.9 t ADT: 4,000

RUSSELL ROAD

Good

Over: NB FRONTAGE ROAD

S. LAS VEGAS, Clark, NV

Built 2011 Load: 99.9 t ADT: 18,600

RUSSELL ROAD

Good

Over: SB FRONTAGE ROAD

SOUTH OF LAS VEGAS, Clark, NV

Built 2011 Load: 99.9 t ADT: 18,600

GARAGE EXIT ROAD

Good

Over: PARKING EXIT ROAD

MCARRAN AIRPORT (T1), Clark, NV

Built 1997 Load: 99.9 t ADT: 1,500

GARAGE EXIT ROAD

Good

Over: GARAGE EXIT ROAD

MCARRAN AIRPORT (T1), Clark, NV

Built 1996 Load: 99.9 t ADT: 5,000

215N RAMP to US95S

Good

Over: OSO BLANCO

CENTENNIAL BOWL, Clark, NV

Built 2020 Load: 99.9 t ADT: 9,600

CC215N

Good

Over: US95

Centennial Bowl, Clark, NV

Built 2022 Load: 99.9 t ADT: 31,000

Rmp US95,SkyPointe

Good

Over: US95, R1, R2, R3

Centennial Bowl, Clark, NV

Built 2023 Load: 99.9 t ADT: 35,000

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial