Churchill County, NV

70 public highway bridges

Churchill County Bridge Snapshot

Churchill County, Nevada contains 70 public highway bridges in the FHWA National Bridge Inventory. Roughly 51.4% are rated “Good,” 45.7% “Fair,” 0% “Poor,” and 0% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in NV are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

70
Total Bridges
51.4%
Good
0%
Poor
0%
Structurally Deficient

Condition Distribution

Good
51.4% (36)
Fair
45.7% (32)
Poor
0% (0)
SD
0% (0)

All Bridges (70)

I 80E

Unknown

Over: US 95

WEST OF LOVELOCK, Churchill, NV

Built 1961 ADT: 1,060

I 80W

Unknown

Over: US 95

WEST OF LOVELOCK, Churchill, NV

Built 1961 ADT: 1,060

TARZYN ROAD

Fair

Over: CARSON RIVER

NORTH OF FALLON, Churchill, NV

Built 1973 Load: 16.0 t ADT: 66

CEMETERY ROAD

Fair

Over: S-CANAL

NORTHEAST OF FALLON, Churchill, NV

Built 1980 Load: 19.6 t ADT: 1,200

VENTURACCI ROAD

Fair

Over: S-CANAL

WEST OF FALLON, Churchill, NV

Built 2003 Load: 19.6 t ADT: 2,850

Casey Road

Fair

Over: A Line Canal

West of Fallon, Churchill, NV

Built 1985 Load: 19.6 t ADT: 100

STATE PARK ROAD

Fair

Over: CARSON RVR

WEST OF FALLON, Churchill, NV

Built 1980 Load: 21.9 t ADT: 88

Farm District Road

Fair

Over: TRUCKEE-CARSON CANAL

SOUTH OF HAZEN, Churchill, NV

Built 1948 Load: 23.1 t ADT: 11

US 50

Fair

Over: REROUTED DIAGONAL DRAIN

East of Fallon, Churchill, NV

Built 2017 Load: 26.8 t ADT: 1,300

IRR SR116 STILLWTR

Fair

Over: S-CANAL

5 MILES EAST OF FALLON, Churchill, NV

Built 1936 Load: 27.8 t ADT: 1,450

US 95

Fair

Over: S CANAL

NORTH OF FALLON, Churchill, NV

Built 1987 Load: 28.0 t ADT: 4,550

US 50

Fair

Over: EASTGATE WASH

EAST OF FALLON, Churchill, NV

Built 1964 Load: 29.0 t ADT: 720

US 50

Fair

Over: TRUCKEE CANAL

WEST OF FALLON NR LAHNTN, Churchill, NV

Built 1957 Load: 29.7 t ADT: 2,550

FIRST STREET

Fair

Over: DRAINAGE DITCH

SOUTH GATE NAS FALLON NV, Churchill, NV

Built 1985 Load: 32.6 t ADT: 600

EAST COUNTY ROAD

Fair

Over: EAST CANAL

E. COUNTY ROAD RESERVOIR, Churchill, NV

Built 1998 Load: 32.7 t ADT: 10

SR722 CARROLL SUMM

Fair

Over: EASTGATE WASH

EAST OF MIDDLE GATE, Churchill, NV

Built 1935 Load: 32.9 t ADT: 40

BIA IRR RTE 191

Fair

Over: CANAL

BEHIND TRIBAL CLINIC, Churchill, NV

Built 1980 Load: 33.7 t ADT: 5

IRR SR116 STILLWTR

Fair

Over: S-CANAL

6 MILES EAST OF FALLON, Churchill, NV

Built 1987 Load: 34.8 t ADT: 1,450

US 50

Fair

Over: UPPER DIAGONAL DRAIN

EAST OF FALLON, Churchill, NV

Built 1959 Load: 36.2 t ADT: 1,300

US 50

Fair

Over: UPRR

HAZEN, Churchill, NV

Built 2008 Load: 36.8 t ADT: 4,725

US 50

Fair

Over: UPRR

HAZEN, Churchill, NV

Built 2008 Load: 36.8 t ADT: 4,725

SR718 LONETREE RD

Fair

Over: DRAINAGE CANAL

SOUTH OF FALLON, Churchill, NV

Built 1941 Load: 37.2 t ADT: 570

IRR SR116 STILLWTR

Fair

Over: CANAL

6 Mi EAST OF FALLON, Churchill, NV

Built 1987 Load: 37.6 t ADT: 80

FRAZZINI WY

Fair

Over: L-CANAL

FALLON, Churchill, NV

Built 1990 Load: 41.5 t ADT: 605

SR 715/MCLEAN LN

Fair

Over: V-CANAL

WEST OF FALLON, Churchill, NV

Built 1957 Load: 41.7 t ADT: 2,000

I 80W

Fair

Over: NIGHTINGALE EXIT 65

EAST OF FERNLEY, Churchill, NV

Built 1962 Load: 43.7 t ADT: 4,975

SR 117/SHECKLER RD

Fair

Over: LB LATERAL CANAL

FALLON, Churchill, NV

Built 1959 Load: 44.1 t ADT: 4,000

SR117 SHECKLER RD

Fair

Over: CARSON RVR

FALLON, Churchill, NV

Built 1986 Load: 44.7 t ADT: 2,550

I 80E

Fair

Over: JESSUP EXIT 78

EAST OF FERNLEY, Churchill, NV

Built 1960 Load: 45.7 t ADT: 4,775

I 80W

Fair

Over: JESSUP EXIT 78

EAST OF FERNLEY, Churchill, NV

Built 1960 Load: 45.7 t ADT: 4,775

US 50

Fair

Over: CARSON RIVER

WEST OF FALLON, Churchill, NV

Built 1980 Load: 48.6 t ADT: 16,800

US 95

Fair

Over: DRY WASH

NORTH OF SCHURZ, Churchill, NV

Built 1964 Load: 50.2 t ADT: 2,600

US 50

Fair

Over: DRY WASH

EAST OF FALLON, Churchill, NV

Built 1961 Load: 50.9 t ADT: 730

CASEY ROAD

Fair

Over: L-CANAL

WEST OF FALLON, Churchill, NV

Built 1981 Load: 51.2 t ADT: 110

NORTH DOWNS LANE

Good

Over: S-CANAL

EAST OF FALLON, Churchill, NV

Built 1935 Load: 19.6 t ADT: 500

COLEMAN RD

Good

Over: S-CANAL

WEST OF FALLON, Churchill, NV

Built 2004 Load: 19.6 t ADT: 2,850

ALLEN ROAD

Good

Over: AA CANAL

SOUTH OF FALLON, Churchill, NV

Built 1975 Load: 19.6 t ADT: 2,000

US 50

Good

Over: V-CANAL

WEST OF FALLON, Churchill, NV

Built 1980 Load: 22.7 t ADT: 16,800

SR 715/MCLEAN LN

Good

Over: CARSON RIVER

WEST OF FALLON, Churchill, NV

Built 1956 Load: 23.5 t ADT: 2,450

SR 726/OLD RIVER R

Good

Over: CARSON RIVER

NORTH OF FALLON, Churchill, NV

Built 1951 Load: 24.8 t ADT: 360

HARMON ROAD

Good

Over: S CANAL

EAST OF FALLON, Churchill, NV

Built 2010 Load: 25.8 t ADT: 220

S MAINE ST

Good

Over: L LINE CANAL

FALLON, Churchill, NV

Built 2019 Load: 27.4 t ADT: 2,450

BASS ROAD

Good

Over: CANAL

FALLON, Churchill, NV

Built 2005 Load: 28.2 t ADT: 1,000

US 95

Good

Over: L-LINE CANAL

SOUTH OF FALLON, Churchill, NV

Built 1949 Load: 29.3 t ADT: 5,150

US 95

Good

Over: DRY WASH

NORTH OF FALLON, Churchill, NV

Built 1957 Load: 29.8 t ADT: 1,200

US 95

Good

Over: AA-CANAL

FALLON, Churchill, NV

Built 1954 Load: 30.9 t ADT: 3,000

PIONEER ROAD

Good

Over: T CANAL

WEST OF FALLON, Churchill, NV

Built 2008 Load: 30.9 t ADT: 250

US 50

Good

Over: HL4 DRAIN

EAST OF FALLON, Churchill, NV

Built 1959 Load: 31.9 t ADT: 1,300

NORTH CROOK ROAD

Good

Over: S CANAL

EAST OF FALLON, Churchill, NV

Built 2011 Load: 32.3 t ADT: 200

US95

Good

Over: DRAINAGE

S of SR120 PASTURE ROAD, Churchill, NV

Built 2017 Load: 33.9 t ADT: 1,300

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial