Hocking County, OH

293 public highway bridges

Hocking County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Hocking County, Ohio contains 293 public highway bridges. Roughly 67.6% are rated “Good,” 27.3% “Fair,” and 0.7% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

293
Total Bridges
67.6%
Good
27.3%
Fair
0.7%
Poor Condition

Condition Distribution

Good
67.6% (198)
Fair
27.3% (80)
Poor
0.7% (2)

All Bridges (293)

THOMAS

Fair

Over: QUEER CREEK

1.55 MI N OF TR 248, Hocking, OH

Built 1910 Load: 32.4 t ADT: 96

HUGGINS

Fair

Over: SCOTT CREEK

0.11 MI N OF DEAD END, Hocking, OH

Built 1920 Load: 32.4 t ADT: 10

FRANTZ

Fair

Over: HONEY FORK

0.01 MI E OF CR12, Hocking, OH

Built 1990 Load: 32.4 t ADT: 13

SLIP

Fair

Over: STREAM

0.621 MI N OF SR 93, Hocking, OH

Built 1956 Load: 32.4 t ADT: 30

McCALL

Fair

Over: SNOW FORK

0.02 MI E OF SR 78, Hocking, OH

Built 2007 Load: 32.4 t ADT: 10

MAYSVILLE-WILLIAMS

Fair

Over: LITTLE MONDAY CREEK

4.91 MI N OF CORP LIMIT, Hocking, OH

Built 2005 Load: 32.4 t ADT: 1,884

CONRAD

Fair

Over: STREAM

2.17 MI N OF TR 188, Hocking, OH

Built 2004 Load: 32.4 t ADT: 324

COOK

Fair

Over: STREAM

0.50 MI E OF TR 232, Hocking, OH

Built 1942 Load: 32.7 t ADT: 209

DAWLEY-NEW PITSBRG

Fair

Over: SAND RUN

2.48 MI E OF SR 278, Hocking, OH

Built 1939 Load: 32.7 t ADT: 30

USR 33

Fair

Over: C&O RAILROAD

2.20M E OF JCT SR 328, Hocking, OH

Built 1970 Load: 35.6 t ADT: 7,836

CREAMERY HILL

Fair

Over: SALT CREEK

0.34 MI E OF ROSS CL, Hocking, OH

Built 1974 Load: 35.6 t ADT: 153

STUMP

Fair

Over: STUMP RUN

0.40 MI N OF SR 180, Hocking, OH

Built 1958 Load: 36.0 t ADT: 324

PRICE

Fair

Over: STREAM

1.62 MI E OF CR 17, Hocking, OH

Built 1959 Load: 36.0 t ADT: 39

BEAR RUN

Fair

Over: STREAM

1.60 MI N OF SR 93, Hocking, OH

Built 1940 Load: 36.3 t ADT: 477

WAGNER

Fair

Over: LITTLE PINE CREEK

0.74 MI N OF CR 11, Hocking, OH

Built 1964 Load: 36.3 t ADT: 324

STOUT

Fair

Over: KITCHEN RUN

1.62 miles from St Rt 595, Hocking, OH

Built 1956 Load: 36.3 t ADT: 53

SPENCER HOLLOW

Fair

Over: STREAM

0.99 MI E OF DEAD END, Hocking, OH

Built 2001 Load: 36.3 t ADT: 10

FRASURE-HELBER

Fair

Over: STREAM

1.43 MI N OF CR 33A, Hocking, OH

Built 2013 Load: 36.6 t ADT: 477

KLUMP

Fair

Over: DURBIN RUN

0.048 MI E OF CR 82, Hocking, OH

Built 2002 Load: 36.6 t ADT: 142

MAYSVILLE-WILLIAMS

Fair

Over: STREAM

1.10 MI N OF CORP LIMIT, Hocking, OH

Built 2007 Load: 36.6 t ADT: 1,884

GOOSE CREEK

Fair

Over: QUEER CREEK

3.28 N OF VINTON CL, Hocking, OH

Built 1984 Load: 38.9 t ADT: 1,884

CULBERTSON

Fair

Over: LITTLE BLACKJACK BRANCH

0.27 MI N OF TR 59A, Hocking, OH

Built 1930 Load: 39.5 t ADT: 64

MOHLER

Fair

Over: STREAM

0.08 MI N OF SR 595, Hocking, OH

Built 1950 Load: 39.5 t ADT: 209

BREMEN

Fair

Over: STREAM

5.34 MI N OF SR 93, Hocking, OH

Built 1962 Load: 39.9 t ADT: 72

ILESBORO

Fair

Over: WEST BRANCH

3.06 MI E OF SR 374, Hocking, OH

Built 1960 Load: 39.9 t ADT: 180

MOORE

Fair

Over: FIVEMILE CREEK

3.11 MI E OF CR 12, Hocking, OH

Built 1973 Load: 40.5 t ADT: 385

ROADS

Fair

Over: STREAM

0.92 MI E OF LAUREL TWP, Hocking, OH

Built 1950 Load: 40.5 t ADT: 118

SR 93

Fair

Over: STREAM

7.86M N VINTON CO. LINE, Hocking, OH

Built 1922 Load: 41.1 t ADT: 2,848

SR 595

Fair

Over: TRIB. OF HOCKING RIVER

0.6 MI N JCT USR 33, Hocking, OH

Built 1995 Load: 41.5 t ADT: 1,723

MIDDLEFORK

Fair

Over: MIDDLEFORK CREEK

04.84 MI N OF SR 180, Hocking, OH

Built 1942 Load: 42.1 t ADT: 252

BLACKJACK

Fair

Over: BLACKJACK BRANCH

1.10 MI E OF SR 664, Hocking, OH

Built 1960 Load: 42.1 t ADT: 477

DAWLEY-NEW PITSBUR

Fair

Over: MONDAY CREEK

0.93 MI E OF SR 278, Hocking, OH

Built 1900 Load: 42.1 t ADT: 162

BIG PINE

Fair

Over: STREAM

1.37 MI E OF SR 56, Hocking, OH

Built 1993 Load: 45.4 t ADT: 220

BUCKINGHAM

Fair

Over: FIVE MILE CREEK

01.99 MI N OF CR 333, Hocking, OH

Built 1920 Load: 45.4 t ADT: 100

GOOSE RUN

Fair

Over: SNOW FORK

0.02 MI E OF SR 78, Hocking, OH

Built 1972 Load: 45.4 t ADT: 209

MIDDLEFORK

Fair

Over: STREAM

2.61 MI N OF SR 180, Hocking, OH

Built 2011 Load: 45.4 t ADT: 168

SALEM

Fair

Over: SNOW FORK

2.31 MI N OF SR 216, Hocking, OH

Built 1958 Load: 48.6 t ADT: 209

ROCKY BOOTS WAY

Fair

Over: STREAM

0.03 MI W OF SR 595, Hocking, OH

Built 1994 Load: 48.6 t ADT: 585

REED

Fair

Over: HARPER RUN

1.43 MI E OF CR 42, Hocking, OH

Built 1930 Load: 48.6 t ADT: 126

LAUREL RUN

Fair

Over: RACOON CREEK

0.74 MI N OF S.R.56, Hocking, OH

Built 1976 Load: 51.8 t ADT: 215

USR 33

Fair

Over: CLEAR CREEK

0.6M E FAIRFIELD CO. LINE, Hocking, OH

Built 1935 Load: 54.4 t ADT: 11,674

PLEASANT VALLEY

Fair

Over: STREAM

1.11 MI N OF CR 4, Hocking, OH

Built 1975 Load: 61.6 t ADT: 219

MIDDLEFORK

Fair

Over: MIDDLEFORK CREEK

3.73 MI N OF SR 180, Hocking, OH

Built 1957 Load: 64.8 t ADT: 168

USR 33

Good

Over: BUCK RUN

0.02M W OF JCT SR 374, Hocking, OH

Built 1965 Load: 5.2 t ADT: 11,674

SR 56

Good

Over: EAST BRANCH RACCOON CRK

1.25 MI E. OF INT. SR 328, Hocking, OH

Built 2014 Load: 21.4 t ADT: 599

SR 595

Good

Over: BIG MONDAY CREEK

3.4 MI W OF SR 278, Hocking, OH

Built 2011 Load: 21.4 t ADT: 279

SR 56

Good

Over: SALT CREEK

2.48M W OF JCT SR 664, Hocking, OH

Built 1989 Load: 25.9 t ADT: 1,012

SR 374

Good

Over: BUCK RUN

1.97M S OF JCT USR 33, Hocking, OH

Built 2000 Load: 28.5 t ADT: 316

SR 56

Good

Over: LAURELVILLE CREEK

0.4 Mi E. OF PICK CO LINE, Hocking, OH

Built 1998 Load: 29.2 t ADT: 2,456

WELL

Good

Over: THREE MILE CREEK

0.68 MI E OF Dead End, Hocking, OH

Built 1968 Load: 29.2 t ADT: 14
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.