Hocking County, OH

293 public highway bridges

Hocking County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Hocking County, Ohio contains 293 public highway bridges. Roughly 67.6% are rated “Good,” 27.3% “Fair,” and 0.7% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

293
Total Bridges
67.6%
Good
27.3%
Fair
0.7%
Poor Condition

Condition Distribution

Good
67.6% (198)
Fair
27.3% (80)
Poor
0.7% (2)

All Bridges (293)

ARMSTRONG

Good

Over: MOCASSIN CREEK

0.27 MI E OF CO LINE, Hocking, OH

Built 2002 Load: 32.4 t ADT: 51

WAGNER

Good

Over: LAUREL RUN

3.60 MI N OF CR 11, Hocking, OH

Built 1997 Load: 32.4 t ADT: 324

KRAFTER

Good

Over: MIDDLE FORK

0.03 MI E OF CR 7, Hocking, OH

Built 2001 Load: 32.4 t ADT: 28

CONRAD #3

Good

Over: STREAM

2.30 MI N OF TR 188, Hocking, OH

Built 2003 Load: 32.4 t ADT: 324

SAM'S CREEK

Good

Over: SALT CREEK

3.67 MI N OF ROSS CL, Hocking, OH

Built 1999 Load: 32.4 t ADT: 351

SAM'S CREEK

Good

Over: SAMS CREEK

3.04 MI N OF ROSS CL, Hocking, OH

Built 1958 Load: 32.4 t ADT: 324

BLUE CREEK

Good

Over: BLUE CREEK

1.98 MI N t182 Rd, Hocking, OH

Built 2003 Load: 32.4 t ADT: 167

FETHEROLF

Good

Over: BLUE CREEK

0.16 MI N OF DEAD END, Hocking, OH

Built 2006 Load: 32.4 t ADT: 11

WILD CAT

Good

Over: STREAM

1.86 MI N OF CR 4, Hocking, OH

Built 2000 Load: 32.4 t ADT: 106

WILD CAT

Good

Over: STREAM

1.36 MI N OF CR 4, Hocking, OH

Built 2000 Load: 32.4 t ADT: 106

DUNLAP

Good

Over: LAUREL RUN

01.24 from dead end, Hocking, OH

Built 2004 Load: 32.4 t ADT: 125

TOAD RUN

Good

Over: LAUREL RUN

0.87 MI N OF DEAD END, Hocking, OH

Built 2008 Load: 32.4 t ADT: 59

COONVILLE

Good

Over: EAST BRANCH

0.01 MI E OF SR 56, Hocking, OH

Built 2007 Load: 32.4 t ADT: 10

O'NEIL

Good

Over: STREAM

0.68 MI N OF VINTON CL, Hocking, OH

Built 1962 Load: 32.4 t ADT: 140

WANDLING

Good

Over: HOCKING RIVER

1.43 MI N OF CR 300, Hocking, OH

Built 1973 Load: 32.4 t ADT: 324

DAWLEY-NEW PITSBRG

Good

Over: SAND RUN

1.86 MI E OF SR 278, Hocking, OH

Built 1955 Load: 32.4 t ADT: 30

SCOUT

Good

Over: THREE MILE CREEK

.068MI E OF CR 17, Hocking, OH

Built 1930 Load: 32.4 t ADT: 234

SMITH CHAPEL

Good

Over: THREE MILE CREEK

0.53 MI E OF CR 17, Hocking, OH

Built 2004 Load: 32.4 t ADT: 148

PRICE

Good

Over: LITTLE MONDAY CREEK

0.10 MI W OF CR 18, Hocking, OH

Built 2000 Load: 32.4 t ADT: 53

TUCKER

Good

Over: MONDAY CREEK

0.36 MI N OF DEAD END, Hocking, OH

Built 1996 Load: 32.4 t ADT: 75

SPENCER HOLLOW

Good

Over: SNOW FORK

0112 MI E OF DEAD END, Hocking, OH

Built 2000 Load: 32.4 t ADT: 32

R.K. MILLER

Good

Over: RUSH CREEK

0.34 MI N OF T0083, Hocking, OH

Built 1920 Load: 32.4 t ADT: 80

LITTLE

Good

Over: STREAM

0.052 MI N OF Dead End, Hocking, OH

Built 2003 Load: 32.4 t ADT: 73

McCELLAND

Good

Over: LAUREL RUN

0.13 MI N from dead end, Hocking, OH

Built 2002 Load: 32.4 t ADT: 24

MAYSVILLE-WILLIAMS

Good

Over: THREE MILE CREEK

1.70 MI N OF CORP LIMIT, Hocking, OH

Built 2006 Load: 32.4 t ADT: 1,884

MAYSVILLE-WILLIAMS

Good

Over: MONDAY RUN

2.05 MI N OF CORP LIMIT, Hocking, OH

Built 2007 Load: 32.4 t ADT: 1,884

BIG PINE

Good

Over: STREAM

13.60 MI E OF SR 56, Hocking, OH

Built 1990 Load: 32.4 t ADT: 402

BIG PINE

Good

Over: PINE CREEK

9.96 MI E OF SR 56, Hocking, OH

Built 1990 Load: 32.4 t ADT: 235

BREMEN

Good

Over: BEAR RUN

5.21 MI N OF SR 93, Hocking, OH

Built 2005 Load: 32.4 t ADT: 72

GRIFFITH

Good

Over: WEST BRANCH

1.49 MI N OF CO LINE, Hocking, OH

Built 2005 Load: 32.4 t ADT: 209

BEACH CAMP

Good

Over: STREAM

0.06 MI E OF SR 664, Hocking, OH

Built 2004 Load: 32.4 t ADT: 209

CONRAD

Good

Over: STREAM

1.99 MI N OF TR 188, Hocking, OH

Built 2004 Load: 32.4 t ADT: 324

SR 374 & SR 664

Good

Over: STREAM 4

4.5 MI N INT OF SR 56, Hocking, OH

Built 2012 Load: 32.7 t ADT: 634

HARVEY CHAPEL

Good

Over: STREAM

2.42 MI N OF CR 76, Hocking, OH

Built 1940 Load: 32.7 t ADT: 63

SR 56

Good

Over: OVER E. BRANCH QUEER CRK

0.65M W OF JCT. SR 374, Hocking, OH

Built 2002 Load: 33.7 t ADT: 310

USR 33

Good

Over: OLDTOWN CREEK

1.07M E OF JCT SR 93, Hocking, OH

Built 1970 Load: 34.0 t ADT: 9,486

SR 664

Good

Over: RUSH CREEK

1.6 MI S FAIRFIELD CO LI., Hocking, OH

Built 1993 Load: 34.0 t ADT: 1,114

USR 33

Good

Over: OLDTOWN CREEK

1.07M E OF JCT SR 93, Hocking, OH

Built 1970 Load: 34.3 t ADT: 9,486

SR 78

Good

Over: BRUSH FORK CREEK

1.15 Mi W. JCT SR 216, Hocking, OH

Built 1994 Load: 34.7 t ADT: 2,483

SR 93

Good

Over: CAMPBELL CREEK

1.32M N OF JCT USR 33, Hocking, OH

Built 1989 Load: 34.7 t ADT: 5,503

SR 327

Good

Over: PIKE RUN

PIKE RUN, Hocking, OH

Built 2007 Load: 35.6 t ADT: 465

SANNER

Good

Over: RACCOON CREEK

0.28 MI N OF CR 26, Hocking, OH

Built 2020 Load: 35.6 t ADT: 194

PURCELL

Good

Over: PINE CREEK

0.37 MI N OF DEAD, Hocking, OH

Built 1900 Load: 35.6 t ADT: 48

DAUBENMIER

Good

Over: BEAR RUN

0.08 MI N OF CR 76, Hocking, OH

Built 1998 Load: 36.0 t ADT: 12

PATTON

Good

Over: STREAM

00.08 MI E OF DEAD END, Hocking, OH

Built 1999 Load: 36.0 t ADT: 30

STEWART

Good

Over: SAMS CREEK

0.24 MI from dead end, Hocking, OH

Built 2006 Load: 36.3 t ADT: 84

SPENCER HOLLOW

Good

Over: STREAM

0.80 MI E OF DEAD END, Hocking, OH

Built 2011 Load: 36.3 t ADT: 10

GROVES

Good

Over: STREAM

0.43 east of dead end, Hocking, OH

Built 1999 Load: 36.3 t ADT: 31

BAKER

Good

Over: LITTLE PINE CREEK

0.13 MI N OF TR 159, Hocking, OH

Built 2013 Load: 36.3 t ADT: 10

ESSEX

Good

Over: STREAM

0.80 MI N of dead end, Hocking, OH

Built 2009 Load: 36.3 t ADT: 37
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.