Summit County, OH

563 public highway bridges

Summit County Bridge Snapshot

Summit County, Ohio contains 563 public highway bridges in the FHWA National Bridge Inventory. Roughly 27.7% are rated “Good,” 23.4% “Fair,” 2.3% “Poor,” and 2.3% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in OH are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

563
Total Bridges
27.7%
Good
2.3%
Poor
2.3%
Structurally Deficient

Condition Distribution

Good
27.7% (156)
Fair
23.4% (132)
Poor
2.3% (13)
SD
2.3% (13)

All Bridges (563)

IR76 RAMP TO I77S

Unknown

Over: I76WB RMP TO I77SB

0.06 MI W OF SR 8, Summit, OH

Built 1960 ADT: 118,022

RAMP IR 77 WB LANE

Unknown

Over: I-76

0.02 MI W OF IR 77, Summit, OH

Built 1960 ADT: 20,749

IR76

Unknown

Over: IR 76

0.02 MI E OF IR 77, Summit, OH

Built 1960

SR 8 NB & SB

Unknown

Over: IR 76WB, Lane O. SR 8

0.15 MI E OF IR 77, Summit, OH

Built 2023 ADT: 118,022

I-76 WESTBOUND

Unknown

Over: IR 76

0.26 MI E OF SR 8, Summit, OH

Built 1955 ADT: 100

I-76 EASTBOUND

Unknown

Over: IR 76

0.26 MI E OF SR 8, Summit, OH

Built 1955 ADT: 2,451

IR76

Unknown

Over: I-76

0.77 MI E OF SR 8, Summit, OH

Built 1955 ADT: 14,093

I-76 EB OFF RAMP

Unknown

Over: RAMP E-6 UNDER RAMP E-8

0.81 MI E OF SR 8, Summit, OH

Built 1993 ADT: 94,616

I-76 WB OFF RAMP

Unknown

Over: RAMP E-4 UNDER E-7

0.90 MI E OF SR 8, Summit, OH

Built 1993 ADT: 94,616

I-76

Unknown

Over: I-76

1.13 MI E OF SR 8, Summit, OH

Built 1955 ADT: 1,949

I-76

Unknown

Over: I-76

1.23 MI E OF SR 8, Summit, OH

Built 1957 ADT: 7,876

I-76

Unknown

Over: I-76

1.37 MI E OF SR 8, Summit, OH

Built 1957 ADT: 7,682

I-76 EB OFF RAMP

Unknown

Over: RAMP E-16 UNDER RAMP E-1

1.05 MI W OF SR 18, Summit, OH

Built 1993 ADT: 87,925

I-76

Unknown

Over: I-76

0.34 MI W OF SR 18, Summit, OH

Built 1958 ADT: 3,686

I.R. 76

Unknown

Over: IR 76

0.41 MI W OF SR 18, Summit, OH

Built 1958

I.R.76

Unknown

Over: I-76

JCT OF IR 76 AND SR 18, Summit, OH

Built 1958 ADT: 11,002

SR 91 CANTON RD

Unknown

Over: SR91(CANTON RD) OVER IR7

0.59 MI N OF SR 18, Summit, OH

Built 1994 ADT: 72,336

I-76

Unknown

Over: I-76

0.22 MI E OF SR 91, Summit, OH

Built 1958 ADT: 17,657

MUNROE FALLS ROAD

Unknown

Over: UNDER MUNROE FALLS RD

0.65 MI W OF SR 532, Summit, OH

Built 1958 ADT: 63,778

NEWTON STREET

Unknown

Over: UNDER NEWTON ST CR-654

0.47 MI W OF SR 532, Summit, OH

Built 1958 ADT: 63,778

I.R. 76

Unknown

Over: IR76

JCT OF IR 76 AND SR 532, Summit, OH

Built 1958 ADT: 8,889

I.R. 76

Unknown

Over: IR76

0.72 MI E OF SR 532, Summit, OH

Built 1958 ADT: 3,676

SR 82

Unknown

Over: SR 82

0.22 MI W OF SR 14, Summit, OH

Built 1968 ADT: 43,341

SR 93

Unknown

Over: SR93

0.16 MI N OF SR 764, Summit, OH

Built 1960 ADT: 1,000

KENMORE BLVD CR-67

Unknown

Over: SR 93

0.44 MI N OF SR 764, Summit, OH

Built 1960 ADT: 9,409

SR 176 (WHEATLEY)

Unknown

Over: SR176 WHEATLEY ROAD

1.34 MI S OF SR 303, Summit, OH

Built 1964 ADT: 63,201

SR 176

Unknown

Over: SR 176

JCT OF IR 271 AND SR 176, Summit, OH

Built 1970 ADT: 33,124

US 224

Unknown

Over: US 224

0.52 MI E OF IR 77, Summit, OH

Built 1972 ADT: 13,500

KELLY AVENUE

Unknown

Over: UNDER KELLY AVE CR-673

0.97 MI E OF IR 77, Summit, OH

Built 1972 ADT: 31,992

US 224

Unknown

Over: RAMP A UNDER US 224

0.65 MI W OF SR 241, Summit, OH

Built 2005

BRITTIAN RD CR 34

Unknown

Over: UNDER BRITTAIN RD CR-34

0.21 MI W OF SR 241, Summit, OH

Built 1959 ADT: 11,349

SR 18

Unknown

Over: UNDER SR 18 (MARKET ST)

JCT OF SR 18 AND SR 8, Summit, OH

Built 2002 ADT: 111,257

SR 261

Unknown

Over: SR261

JCT OF SR 21 AND SR 261, Summit, OH

Built 1957 ADT: 33,582

SR 261 WOOSTER AVE

Unknown

Over: SR 261 (WOOSTER AV)

JCT OF SR 261 AND SR 59, Summit, OH

Built 1976 ADT: 27,218

SR 261 D

Unknown

Over: SR 261

JCT OF SR 261 AND SR 59, Summit, OH

Built 1981

SR 261

Unknown

Over: SR 261

JCT OF SR 261 AND SR 59, Summit, OH

Built 1981

EVERETT ROAD CR-47

Unknown

Over: UNDER EVERETT RD CR-47

2.55 MI S OF SR 176, Summit, OH

Built 1970 ADT: 33,124

MEDINA LINE ROAD

Unknown

Over: UNDER MEDINA LINE RD CR-

2.30 MI W OF SR 176, Summit, OH

Built 1970 ADT: 33,124

I.R. 271

Unknown

Over: IR 271

0.50 MI N OF SR 176, Summit, OH

Built 1971 ADT: 59,704

SOUTHERN RD CR 19

Unknown

Over: UNDER SOUTHERN RD CR-194

1.24 MI W OF SR 176, Summit, OH

Built 1970 ADT: 33,124

BRECKSVILLE ROAD

Unknown

Over: UNDER BRECKSVILLE RD CR1

0.20 MI E OF SR 176, Summit, OH

Built 1968 ADT: 30,152

I.R. 271

Unknown

Over: RAMP B IR271NB TO I77NB

JCT OF IR 271 AND IR 77, Summit, OH

Built 1969 ADT: 66,093

I.R. 271

Unknown

Over: IR 271

JCT OF IR 271 AND IR 77, Summit, OH

Built 1971 ADT: 59,704

I.R. 271

Unknown

Over: IR271 RAMP B TO IR77NB

JCT OF IR 271 AND IR 77, Summit, OH

Built 1971 ADT: 37,901

I.R. 271

Unknown

Over: IR271NB RAMP B TO IR77NB

JCT OF IR 271 AND IR 77, Summit, OH

Built 1971 ADT: 37,901

IR 271 SB

Unknown

Over: IR 271

1.75 MI N OR SR 303, Summit, OH

Built 2006 ADT: 2,307

IR 271 NB

Unknown

Over: IR 271

1.75 MI N OF SR 303, Summit, OH

Built 2007 ADT: 2,307

I.R. 271

Unknown

Over: I-271

2.53 MI N OF SR 303, Summit, OH

Built 1969 ADT: 753

I.R. 271

Unknown

Over: I-271

2.53 MI N OF SR 303, Summit, OH

Built 1969 ADT: 753

HINES HILL ROAD

Unknown

Over: UNDER HINES HILL RD TR11

3.13 MI N OF SR 303, Summit, OH

Built 1971 ADT: 34,838

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial