Wilson County, TN

402 public highway bridges

Wilson County Bridge Snapshot

Wilson County, Tennessee contains 402 public highway bridges in the FHWA National Bridge Inventory. Roughly 56% are rated “Good,” 29.4% “Fair,” 7.2% “Poor,” and 7.2% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TN are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

402
Total Bridges
56%
Good
7.2%
Poor
7.2%
Structurally Deficient

Condition Distribution

Good
56% (225)
Fair
29.4% (118)
Poor
7.2% (29)
SD
7.2% (29)

All Bridges (402)

NFA B040

Good

Over: SCHUTES BRANCH

3 MI NW JCT SR24&SR171, Wilson, TN

Built 1988 Load: 32.4 t ADT: 470

NFA B265

Good

Over: BRANCH

4.3 KM S. OF I-40/SR109, Wilson, TN

Built 1976 Load: 32.4 t ADT: 500

NFA B266

Good

Over: BRANCH

4 KM S. OF I40/SR109, Wilson, TN

Built 1976 Load: 32.4 t ADT: 500

NFA B481

Good

Over: MIDDLE FORK CEDAR CREEK

1.9 MI NE JCT I40 & SR109, Wilson, TN

Built 2003 Load: 32.4 t ADT: 1,700

NFA B481

Good

Over: CEDAR CREEK

1.4 MI NE JCT I40 & SR109, Wilson, TN

Built 2003 Load: 32.4 t ADT: 1,700

NFA B481

Good

Over: BRANCH

2.2 MI NE JCT I40 & SR109, Wilson, TN

Built 2003 Load: 32.4 t ADT: 1,700

NFA B481

Good

Over: WILSON CREEK

2.2 MI NE JCT I40 & SR109, Wilson, TN

Built 2003 Load: 32.4 t ADT: 1,700

NFA B483

Good

Over: MIDDLE FORK CEDAR CREEK

0.7 MI NE JCT I40 & SR109, Wilson, TN

Built 2003 Load: 32.4 t ADT: 1,700

NFA B415

Good

Over: SPENCER CREEK

6.4 KM E. OF SR24/SR109, Wilson, TN

Built 1976 Load: 32.4 t ADT: 500

NFA 2035

Good

Over: N.E.R.R

0.1 MI NORTH OF ST RT 24, Wilson, TN

Built 2000 Load: 32.4 t ADT: 1,440

NFA B664

Good

Over: BRANCH

1.1 KM S. OF SR24/SR109, Wilson, TN

Built 1976 Load: 32.4 t ADT: 800

NFA B940

Good

Over: SPENCER CREEK

4.3 KM E. OF SR109/US70, Wilson, TN

Built 2018 Load: 32.4 t ADT: 1,000

NFA B977

Good

Over: WALKER BRANCH

2.6 KM N. OF US231/US70, Wilson, TN

Built 2019 Load: 32.4 t ADT: 500

NFA C088

Good

Over: BRANCH

3.7 KM E JCT SR109&US70, Wilson, TN

Built 1976 Load: 32.4 t ADT: 2,000

NFA C088

Good

Over: N&E RAILROAD

3.7 KM E JCT SR109&US70, Wilson, TN

Built 2006 Load: 32.4 t ADT: 2,000

NFA C102

Good

Over: SPENCER CREEK

0.3 MI WEST OF SR109, Wilson, TN

Built 2010 Load: 32.4 t ADT: 630

NFA C105

Good

Over: BRANCH

1.4 KM N. OF SR24/SR109, Wilson, TN

Built 1976 Load: 32.4 t ADT: 2,000

NFA 1067 (SA 9516)

Good

Over: W. PRONG JENNING FK CREE

1.3 MI SOUTH OF I40, Wilson, TN

Built 1970 Load: 32.4 t ADT: 507

NFA 1067 (SA 9516)

Good

Over: LICK CREEK

1 MI NORTH OF SR26, Wilson, TN

Built 2016 Load: 32.4 t ADT: 651

NFA 1052 (SA 9502)

Good

Over: SINKING CREEK

2.8 MI WEST OF SR265, Wilson, TN

Built 1945 Load: 32.4 t ADT: 586

NFA 1052 (SA 9502)

Good

Over: BRANCH

0.3 MI EAST OF GLADEVILLE, Wilson, TN

Built 1940 Load: 32.4 t ADT: 6,566

I40

Good

Over: STONER CREEK

1.1 M E JCT I40&SR171, Wilson, TN

Built 1965 Load: 32.4 t ADT: 84,056

I40

Good

Over: BRANCH

2.7 M W JCT I40&SR109, Wilson, TN

Built 1965 Load: 32.4 t ADT: 84,731

I40

Good

Over: SOUTH FORK CREEK

.3 M W JCT I40&SR109, Wilson, TN

Built 1965 Load: 32.4 t ADT: 84,731

I40

Good

Over: BRANCH

1.7 M E JCT I40&SR840, Wilson, TN

Built 2002 Load: 32.4 t ADT: 80,356

NFA B706

Good

Over: SINKING CREEK

IN THE CITY OF LEBANON, Wilson, TN

Built 1970 Load: 32.4 t ADT: 1,619

FAS 265

Good

Over: DRY CREEK

1.2 M NW JCT SR265&SR10, Wilson, TN

Built 1955 Load: 32.4 t ADT: 2,885

FAS 265

Good

Over: WEST FORK SPRING CREEK

4.3 M W JCT SR265&SR26, Wilson, TN

Built 1950 Load: 32.4 t ADT: 1,737

FAS 265

Good

Over: WEST FORK SPRING CREEK

3.4 M W JCT SR265&SR26, Wilson, TN

Built 1955 Load: 32.4 t ADT: 1,737

FAS 171

Good

Over: STONES CREEK

1.1 M N JCT SR171&I40, Wilson, TN

Built 2002 Load: 32.4 t ADT: 31,345

FAS 171

Good

Over: BRANCH

.3 M S JCT SR171&SR24, Wilson, TN

Built 1938 Load: 32.4 t ADT: 23,624

NFA 1058 (SA 9521)

Good

Over: BRANCH

4.2 MI EAST OF SR109, Wilson, TN

Built 1955 Load: 32.4 t ADT: 6,373

NFA 1058 (SA 9521)

Good

Over: WALKER BRANCH

2 MI NW OF LEBANON, Wilson, TN

Built 1965 Load: 32.4 t ADT: 6,373

FAS 266

Good

Over: BRANCH

1.5 M N RUTHERFORD CO LN, Wilson, TN

Built 1955 Load: 32.4 t ADT: 2,987

FAS 266

Good

Over: MIDDLE FORK SPRING CREEK

.5 M S JCT SR265&SR266, Wilson, TN

Built 1955 Load: 32.4 t ADT: 2,380

FAP 401 (SR 24)

Good

Over: COOKS BRANCH

.1 M NE JCT SR24&SR109, Wilson, TN

Built 2007 Load: 32.4 t ADT: 16,318

FAP 401 (SR 24)

Good

Over: OVERFLOW

.2 M NE JCT SR24&SR109, Wilson, TN

Built 2007 Load: 32.4 t ADT: 16,318

FAP 401 (SR 24)

Good

Over: SPENCE CREEK

.4 M NE JCT SR24&SR109, Wilson, TN

Built 2007 Load: 32.4 t ADT: 16,318

FAP 401 (SR 24)

Good

Over: BRANCH

1 M E JCT SR24&SR171, Wilson, TN

Built 1999 Load: 32.4 t ADT: 23,110

FAP 401 (SR 24)

Good

Over: BRANCH

1 M NE JCT SR24&SR171, Wilson, TN

Built 2007 Load: 32.4 t ADT: 16,318

FAP 401 (SR 24)

Good

Over: BRANCH

.5 M E JCT SR24&SR171, Wilson, TN

Built 2006 Load: 32.4 t ADT: 20,839

FAP 401 (SR 24)

Good

Over: BRANCH

1 M E JCT SR24&SR171, Wilson, TN

Built 2006 Load: 32.4 t ADT: 20,839

FAP 401 (SR 24)

Good

Over: BRANCH

7.0 M E JCT SR24&SR109, Wilson, TN

Built 2006 Load: 32.4 t ADT: 20,839

FAP 26

Good

Over: BRANCH

.8 M NW DEKALB CO LINE, Wilson, TN

Built 1956 Load: 32.4 t ADT: 7,453

FAP 26

Good

Over: EAVENS CREEK

.1 M W DEKALB CO LINE, Wilson, TN

Built 1953 Load: 32.4 t ADT: 4,849

FAP 96

Good

Over: BRANCH

2 M N CANNON CO LINE, Wilson, TN

Built 1963 Load: 32.4 t ADT: 3,365

FAP 109

Good

Over: MIDDLE FORK CEDAR CREEK

.1 M NW JCT I40&SR109, Wilson, TN

Built 1965 Load: 32.4 t ADT: 30,452

FAP 109

Good

Over: BRANCH

.6 M NW JCT SR24&SR109, Wilson, TN

Built 2021 Load: 32.4 t ADT: 24,032

FAP 109

Good

Over: DRY FORK CREEK

3.9 M NW JCT SR24&SR109, Wilson, TN

Built 2020 Load: 32.4 t ADT: 24,032

FAP 109

Good

Over: NORTH FORK CEDAR CREEK

.4 M NW JCT I40&SR109, Wilson, TN

Built 1999 Load: 32.4 t ADT: 30,452

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial