Colorado County, TX

252 public highway bridges

Colorado County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Colorado County, Texas contains 252 public highway bridges. Roughly 45.6% are rated “Good,” 42.9% “Fair,” and 2.4% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

252
Total Bridges
45.6%
Good
42.9%
Fair
2.4%
Poor Condition

Condition Distribution

Good
45.6% (115)
Fair
42.9% (108)
Poor
2.4% (6)

All Bridges (252)

IH 10

Fair

Over: Ratliff Creek

1.0 Mi E of FM 2434, Colorado, TX

Built 1962 Load: 24.5 t ADT: 25,208

FM 109

Fair

Over: PIPER CREEK

0.10 MI E OF FM 1291, Colorado, TX

Built 1986 Load: 24.5 t ADT: 1,586

FM 3013

Fair

Over: Irrigation Canal

1.1 Mi S of US 90A, Colorado, TX

Built 1950 Load: 24.5 t ADT: 1,625

SECATES RD

Fair

Over: POPLAR CREEK

0.05 MI SW OF STOKES RD, Colorado, TX

Built 1989 Load: 24.5 t ADT: 70

ZIMMERSCHEIDT RD

Fair

Over: REDGATE CREEK

0.8 MI E OF FM 109, Colorado, TX

Built 1968 Load: 24.5 t ADT: 230

SEALY RD

Fair

Over: LITTLE SAN BERNARD RIVER

1.45 MI N OF BERNARDO RD, Colorado, TX

Built 1970 Load: 24.5 t ADT: 150

CR 92

Fair

Over: COUSHATTA CREEK

1.35 MI SE OF IH 10, Colorado, TX

Built 1969 Load: 24.5 t ADT: 30

SCHINDLER RD

Fair

Over: IRRIGATION CANAL

5.0 MI S OF FM 102, Colorado, TX

Built 1932 Load: 24.5 t ADT: 80

CR 79

Fair

Over: IRRIGATION CANAL

0.2 MI W OF FM 3013, Colorado, TX

Built 1950 Load: 24.5 t ADT: 20

CO RD 115

Fair

Over: WEST MUSTANG CREEK

1.4 MI W OF SH 71, Colorado, TX

Built 1966 Load: 24.5 t ADT: 230

CR 106

Fair

Over: SKULL CREEK

1.2 MI S OF FM 806, Colorado, TX

Built 1970 Load: 24.5 t ADT: 500

CR 111

Fair

Over: DRAW

1.8 MI SW OF SH 71, Colorado, TX

Built 1965 Load: 24.5 t ADT: 210

CR 111

Fair

Over: BUCKSNAG CREEK

5.4 MI SW OF SH 71, Colorado, TX

Built 1974 Load: 24.5 t ADT: 50

CR 122

Fair

Over: PINOAK CREEK

1.6 MI W OF FM 1693, Colorado, TX

Built 1974 Load: 24.5 t ADT: 60

CR 122

Fair

Over: IRRIGATION CANAL

0.01 MI E OF CR 110, Colorado, TX

Built 1960 Load: 24.5 t ADT: 60

CO RD 106

Fair

Over: PINOAK CREEK

3.0 MI S OF US 90 ALT, Colorado, TX

Built 1950 Load: 24.5 t ADT: 188

CR 175

Fair

Over: SANDY CREEK

0.6 MI E OF LAVACA C/L, Colorado, TX

Built 1970 Load: 24.5 t ADT: 170

HATTERMANN LANE

Fair

Over: SKULL CREEK

1.15 MI S OF IH 10, Colorado, TX

Built 1950 Load: 24.5 t ADT: 190

CR 210

Fair

Over: SKULL CREEK

0.3 MI N OF FM 2434, Colorado, TX

Built 1968 Load: 24.5 t ADT: 210

CR 213

Fair

Over: MILLER CREEK

2.7 MI S OF FM 2434, Colorado, TX

Built 1969 Load: 24.5 t ADT: 40

CR 211

Fair

Over: DOWDY CREEK

1.7 MI SW OF FM 2434, Colorado, TX

Built 1969 Load: 24.5 t ADT: 100

CR 230

Fair

Over: WEST SANDY CREEK

2.7 MI E OF FM 155, Colorado, TX

Built 1973 Load: 24.5 t ADT: 80

CR 209

Fair

Over: SOUTH FORK

0.1 MI N OF CR 217, Colorado, TX

Built 1968 Load: 24.5 t ADT: 180

CR 207

Fair

Over: MIDDLE FORK

0.50 MI N OF CR 209, Colorado, TX

Built 1964 Load: 24.5 t ADT: 180

CR 201

Fair

Over: DRAW

1.00 MI E OF CR 204, Colorado, TX

Built 1952 Load: 24.5 t ADT: 130

CR 200

Fair

Over: HARVEY CREEK

0.5 MI N OF CR 202, Colorado, TX

Built 1963 Load: 24.5 t ADT: 210

CR 240

Fair

Over: DRAW

1.30 MI N OF FM 2144, Colorado, TX

Built 1960 Load: 24.5 t ADT: 260

CR 250

Fair

Over: CLEAR CREEK

1.20 MI NW OF FM 2144, Colorado, TX

Built 1966 Load: 24.5 t ADT: 90

CO RD 167

Fair

Over: IRRIGATION CANAL

1.75 MI N OF FM 1693, Colorado, TX

Built 1958 Load: 24.5 t ADT: 30

LIONS PARK DR

Fair

Over: WALIGURA SLOUGH

0.25 MI N OF SH 71, Colorado, TX

Built 2003 Load: 24.5 t ADT: 100

MAIN ST

Fair

Over: DRAW

0.50 MI NW OF FM 102, Colorado, TX

Built 1935 Load: 24.5 t ADT: 370

I 10 NFR / US 90

Fair

Over: UPRR

1.60 Mi E of SH 71, Colorado, TX

Built 1939 Load: 25.4 t ADT: 2,050

US 90A

Fair

Over: Skull Creek

2.2 Mi W of SH 71, Colorado, TX

Built 1948 Load: 25.4 t ADT: 4,336

IH 10 WB

Fair

Over: UPRR

1.65 Mi NE of SH 71, Colorado, TX

Built 1961 Load: 27.2 t ADT: 23,903

IH 10 EB

Fair

Over: UPRR

1.65 Mi NE of SH 71, Colorado, TX

Built 1961 Load: 27.2 t ADT: 23,903

IH 10 WB

Fair

Over: Colorado River

0.5 Mi E of SH 71, Colorado, TX

Built 1961 Load: 27.2 t ADT: 23,903

IH 10 EB

Fair

Over: Colorado River

0.5 MI E of SH 71, Colorado, TX

Built 1961 Load: 27.2 t ADT: 23,903

FM 949

Fair

Over: Church Creek

1.40 Mi NE of IH 10, Colorado, TX

Built 1975 Load: 27.2 t ADT: 2,501

WARSCHAK-SCHUETTE

Fair

Over: REDGATE CREEK

1.9 MI S OF FM 109, Colorado, TX

Built 1998 Load: 27.2 t ADT: 70

FM 109

Fair

Over: Cummins Creek Relief

2.30 Mi N of BU 71 F, Colorado, TX

Built 1955 Load: 28.1 t ADT: 2,238

FM 109

Fair

Over: Redgate Creek

5.10 Mi S of FM 1291, Colorado, TX

Built 1955 Load: 28.1 t ADT: 1,691

BERNARDO ROAD

Fair

Over: WILLOW CREEK

2.75 MI NW OF IH 10, Colorado, TX

Built 1996 Load: 28.1 t ADT: 200

NEW ULM RD

Fair

Over: WILLOW CREEK

0.15 MI NW OF FM 949, Colorado, TX

Built 1995 Load: 29.0 t ADT: 240

US 90

Fair

Over: Colorado River Relief

0.9 Mi E of SP 52, Colorado, TX

Built 1939 Load: 29.9 t ADT: 2,050

NEW ULM RD

Fair

Over: SCHMITT CREEK

2.80 MI NW OF FM 949, Colorado, TX

Built 1995 Load: 30.8 t ADT: 190

CALHOUN RD

Fair

Over: DRAW

1.70 MI SW OF US 90A, Colorado, TX

Built 1965 Load: 30.8 t ADT: 140

CR 213

Fair

Over: SKULL CREEK

0.60 MI N OF FM 2434, Colorado, TX

Built 1951 Load: 30.8 t ADT: 90

FM 806

Fair

Over: Ratliff Creek

0.40 Mi S of IH 10, Colorado, TX

Built 1951 Load: 31.7 t ADT: 594

FM 2761

Fair

Over: Coushatta Creek

3.25 Mi S of IH 10, Colorado, TX

Built 1963 Load: 31.7 t ADT: 322

CR 92

Fair

Over: DRAW

2.40 MI SE OF IH 10, Colorado, TX

Built 1965 Load: 31.7 t ADT: 30
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.