Karnes County, TX

144 public highway bridges

Karnes County Bridge Snapshot

Karnes County, Texas contains 144 public highway bridges in the FHWA National Bridge Inventory. Roughly 43.8% are rated “Good,” 54.2% “Fair,” 1.4% “Poor,” and 1.4% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

144
Total Bridges
43.8%
Good
1.4%
Poor
1.4%
Structurally Deficient

Condition Distribution

Good
43.8% (63)
Fair
54.2% (78)
Poor
1.4% (2)
SD
1.4% (2)

All Bridges (144)

SH 72

Good

Over: SULPHUR CREEK DRAW

0.1 MI SW OF FM 626, Karnes, TX

Built 1939 Load: 24.5 t ADT: 7,750

SH 239

Good

Over: HONDO CREEK

5.2 MI SE OF SH 72, Karnes, TX

Built 1939 Load: 24.5 t ADT: 2,162

SH 239

Good

Over: COTTONWOOD CREEK

7.2 MI SE OF SH 72, Karnes, TX

Built 1939 Load: 24.5 t ADT: 2,162

FM 81

Good

Over: DRAW

0.7 MI SE OF SH 80, Karnes, TX

Built 1940 Load: 24.5 t ADT: 2,728

FM 627

Good

Over: MCTENNEL CREEK

4.1 MI N OF FM 81, Karnes, TX

Built 1967 Load: 24.5 t ADT: 642

FM 743

Good

Over: DRAW

6.9 MI SE OF SH 72 BUS, Karnes, TX

Built 1937 Load: 24.5 t ADT: 135

FM 627

Good

Over: DRY ECLETO CREEK

3.3 MI E OF SH 80, Karnes, TX

Built 1975 Load: 24.5 t ADT: 2,504

FM 1353

Good

Over: TRIB OF ESCONDIDO CREEK

1.2 MI SW OF US 181, Karnes, TX

Built 1950 Load: 24.5 t ADT: 738

FM 1145

Good

Over: NICHOLS CREEK

0.2 MI E OF US 181, Karnes, TX

Built 1978 Load: 24.5 t ADT: 4,292

FM 719

Good

Over: DRAW

0.1 MI W OF FM 792, Karnes, TX

Built 1955 Load: 24.5 t ADT: 2,083

FM 3191

Good

Over: CASIANO CREEK

1.0 MI NW OF SH 123, Karnes, TX

Built 1962 Load: 24.5 t ADT: 278

CR 104

Good

Over: DRAW

0.5 MI SW OF CR 103, Karnes, TX

Built 1968 Load: 24.5 t ADT: 55

CR 105

Good

Over: DRAW

0.6 MI SW OF CR 104, Karnes, TX

Built 1976 Load: 24.5 t ADT: 55

CR 171

Good

Over: ELM CREEK

0.85 MI W OF FM 626, Karnes, TX

Built 1968 Load: 24.5 t ADT: 55

CR 186

Good

Over: ESCONDIDO CREEK

0.90 MI S OF FM 1144, Karnes, TX

Built 1973 Load: 24.5 t ADT: 55

CR 193

Good

Over: SAND HOLLOW

0.55 MI NW OF FM 99, Karnes, TX

Built 1986 Load: 24.5 t ADT: 85

CR 222

Good

Over: CREEK

0.1 MI NE SH 181, Karnes, TX

Built 1980 Load: 24.5 t ADT: 50

CR 277

Good

Over: BRUSHY CREEK

3.4 MI NE OF SH 80, Karnes, TX

Built 1968 Load: 24.5 t ADT: 55

CR 302

Good

Over: DRAW

0.15 MI NE OF FM 81, Karnes, TX

Built 1989 Load: 24.5 t ADT: 105

CR 326

Good

Over: DRY ESCONDIDO CREEK

7.4 MI W OF CR 336, Karnes, TX

Built 1970 Load: 24.5 t ADT: 246

US 181

Good

Over: TURKEY CREEK

2.5 MI NW OF FM 1144, Karnes, TX

Built 1992 Load: 32.7 t ADT: 7,857

BUSINESS US 181

Good

Over: NICHOLS CREEK

0.25 MI S OF SH 72 (MAIN), Karnes, TX

Built 1978 Load: 32.7 t ADT: 2,790

SH 72

Good

Over: NICHOLS CREEK

0.1 MI E OF FM 792, Karnes, TX

Built 1978 Load: 32.7 t ADT: 5,961

FM 81

Good

Over: Chicken Creek

1.7 Mi. NW of FM 884, Karnes, TX

Built 2019 Load: 32.7 t ADT: 1,327

FM 81

Good

Over: Draw

6.7 Mi SE of SH 72, Karnes, TX

Built 2020 Load: 32.7 t ADT: 1,327

FM 81

Good

Over: Yates Creek

2.2 MI SE of SH 72, Karnes, TX

Built 2020 Load: 32.7 t ADT: 729

FM 81

Good

Over: Ojo De Agua Creek

0.8 Mi. S of US 72, Karnes, TX

Built 2019 Load: 32.7 t ADT: 1,327

FM 81

Good

Over: Draw Tributary 2

3.6 Mi. S of US 72, Karnes, TX

Built 2019 Load: 32.7 t ADT: 1,327

FM 81

Good

Over: Ecleto Creek

4.0 MI SE OF SH 80, Karnes, TX

Built 2023 Load: 32.7 t ADT: 1,238

FM 792

Good

Over: Escondido Creek

0.35 MI N OF SH 72, Karnes, TX

Built 2022 Load: 32.7 t ADT: 4,160

FM 1354

Good

Over: Dry Ecleto Creek

0.56 MI E OF SH 80, Karnes, TX

Built 2021 Load: 32.7 t ADT: 252

FM 2724

Good

Over: CIBOLO CREEK

2.8 MI N OF FM 81, Karnes, TX

Built 2014 Load: 32.7 t ADT: 1,265

CR 129

Good

Over: COTTONWOOD CREEK

2.00 MI NE OF SH 239, Karnes, TX

Built 2005 Load: 32.7 t ADT: 55

CR 145

Good

Over: HONDO CREEK

2.90 MI NE OF US 181, Karnes, TX

Built 2005 Load: 32.7 t ADT: 60

CR 155

Good

Over: MEDIO CREEK

1.3 MI NE OF FM 2985, Karnes, TX

Built 2000 Load: 32.7 t ADT: 10

CR 180

Good

Over: DRAW

0.5 MI E OF FM 626, Karnes, TX

Built 2006 Load: 32.7 t ADT: 55

CR 187

Good

Over: OLMOS CREEK

0.8 MI S OF FM 99, Karnes, TX

Built 2005 Load: 32.7 t ADT: 55

CR 302

Good

Over: MCTENNEL CREEK

0.75 MI W OF FM 627, Karnes, TX

Built 2005 Load: 32.7 t ADT: 55

CR 305

Good

Over: ECLETO CREEK

0.9 MI W OF SH 80, Karnes, TX

Built 1999 Load: 32.7 t ADT: 55

CR 319

Good

Over: SALT CREEK

0.50 MI W OF FM 2773, Karnes, TX

Built 2006 Load: 32.7 t ADT: 55

CR 335

Good

Over: SALT CREEK

1.30 MI SE OF FM 81, Karnes, TX

Built 2007 Load: 32.7 t ADT: 25

SCHOOL ST

Good

Over: NICHOLS CREEK

0.1 MI W OF US 181 BUS, Karnes, TX

Built 1978 Load: 32.7 t ADT: 500

CR 230

Poor

Over: DRAW

0.5 MI SE OF CR 237, Karnes, TX

Built 1932 Load: 24.5 t ADT: 90

CR 326

Poor

Over: SAN ANTONIO RIVER

4.4 MI W OF CR 336, Karnes, TX

Built 1973 Load: 24.5 t ADT: 100

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial