Taylor County, TX

419 public highway bridges

Taylor County Bridge Snapshot

Taylor County, Texas contains 419 public highway bridges in the FHWA National Bridge Inventory. Roughly 35.8% are rated “Good,” 42.5% “Fair,” 0.7% “Poor,” and 0.7% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

419
Total Bridges
35.8%
Good
0.7%
Poor
0.7%
Structurally Deficient

Condition Distribution

Good
35.8% (150)
Fair
42.5% (178)
Poor
0.7% (3)
SD
0.7% (3)

All Bridges (419)

IH 20 ML & FR

Fair

Over: NOODLE CREEK

0.10 MI E OF FM 1085, Taylor, TX

Built 1957 Load: 23.6 t ADT: 25,713

IH 20 ML & SFR

Fair

Over: DRAW

5.55 MI E OF NOLAN C/L, Taylor, TX

Built 1957 Load: 23.6 t ADT: 26,112

IH 20 & FR

Fair

Over: MULBERRY CREEK BRANCH

4.55 MI E OF FM 126, Taylor, TX

Built 1927 Load: 23.6 t ADT: 28,499

IH 20 ML & NFR

Fair

Over: DRAW

1.05 MI W OF FM 126, Taylor, TX

Built 1958 Load: 23.6 t ADT: 25,996

IH 20 SFR

Fair

Over: DRAW

1.05 MI W OF FM 126, Taylor, TX

Built 1958 Load: 23.6 t ADT: 150

IH 20 ML & FR

Fair

Over: E FORK BITTER CREEK

0.35 MI E OF FM 126, Taylor, TX

Built 1958 Load: 23.6 t ADT: 26,959

IH 20

Fair

Over: Bull Wagon Creek

2.30 MI W OF FM 707, Taylor, TX

Built 1957 Load: 23.6 t ADT: 28,925

IH 20 & NFR

Fair

Over: INDIAN CREEK

0.35 MI W OF FM 707, Taylor, TX

Built 1957 Load: 23.6 t ADT: 28,925

IH 20

Fair

Over: Elm Creek Relief

0.80 MI W OF US 83, Taylor, TX

Built 1961 Load: 23.6 t ADT: 22,393

IH 20

Fair

Over: ELM CREEK RELIEF

0.70 MI W OF US 83, Taylor, TX

Built 1961 Load: 23.6 t ADT: 22,393

IH 20

Fair

Over: ELM CREEK RELIEF

0.55 MI W OF US 83, Taylor, TX

Built 1961 Load: 23.6 t ADT: 22,393

IH 20

Fair

Over: ELM CREEK RELIEF

0.45 MI W OF US 83, Taylor, TX

Built 1961 Load: 23.6 t ADT: 22,393

IH 20 EB

Fair

Over: DRAW

0.30 MI E OF US 83, Taylor, TX

Built 1961 Load: 23.6 t ADT: 16,768

IH 20

Fair

Over: DRAW

0.60 MI NE OF US 83, Taylor, TX

Built 1961 Load: 23.6 t ADT: 28,487

IH 20 ML & N FR

Fair

Over: DRAW

3.60 MI SE OF SH 351, Taylor, TX

Built 1961 Load: 23.6 t ADT: 27,878

IH 20

Fair

Over: DRAINAGE DITCH

1.80 MI E OF US 83, Taylor, TX

Built 1961 Load: 23.6 t ADT: 28,487

IH 20 ML & WB FR

Fair

Over: CEDAR CREEK

1.25 MI NW OF SH 351, Taylor, TX

Built 1961 Load: 23.6 t ADT: 23,291

US 84 / BUS 20

Fair

Over: Little Elm Creek Branch

1.50 MI W OF US 84, Taylor, TX

Built 1928 Load: 23.6 t ADT: 5,240

US 84 EB

Fair

Over: Draw

2.90 MI E OF IH 20, Taylor, TX

Built 1957 Load: 23.6 t ADT: 5,115

US 84 S FR

Fair

Over: LITTLE ELM CREEK

2.65 MI E OF IH 20, Taylor, TX

Built 1958 Load: 23.6 t ADT: 100

BUS LP 20 (O)

Fair

Over: INDIAN CREEK

0.40 MI W OF FM 707, Taylor, TX

Built 1928 Load: 23.6 t ADT: 390

SH 351

Fair

Over: Buck Creek Branch

2.25 MI NE OF IH 20, Taylor, TX

Built 1927 Load: 23.6 t ADT: 3,535

US 83 / US 277

Fair

Over: Elm Creek Relief

1.35 MI S OF IH 20, Taylor, TX

Built 1957 Load: 23.6 t ADT: 27,497

US 83 / US 277

Fair

Over: Elm Creek Relief

1.45 MI S OF IH 20, Taylor, TX

Built 1957 Load: 23.6 t ADT: 27,497

US 83/US 277

Fair

Over: ELM CREEK RELIEF

1.10 MI S OF FM 2404, Taylor, TX

Built 1959 Load: 23.6 t ADT: 7,759

US 83 BUS (D)

Fair

Over: DRAW

0.30 MI S OF SH 36, Taylor, TX

Built 1949 Load: 23.6 t ADT: 14,990

US 83 / US 84

Fair

Over: CEDAR CREEK RELIEF

3.30 MI S OF FM 707, Taylor, TX

Built 1929 Load: 23.6 t ADT: 10,379

US 83 / US 84

Fair

Over: CEDAR CREEK RELIEF

3.50 MI S OF FM 707, Taylor, TX

Built 1929 Load: 23.6 t ADT: 10,379

US 83 / US 84

Fair

Over: DRAW

7.65 MI S OF FM 707, Taylor, TX

Built 1929 Load: 23.6 t ADT: 9,775

US 83 & FRTG RDS

Fair

Over: ELM CREEK RELIEF

0.85 MI SE OF US 277, Taylor, TX

Built 1959 Load: 23.6 t ADT: 25,803

US 83 AND FRTG RDS

Fair

Over: CATCLAW CREEK

1.25 MI SE OF US 277, Taylor, TX

Built 1959 Load: 23.6 t ADT: 25,803

US 83 AND FRTG RDS

Fair

Over: BUTTONWILLOW CREEK

3.45 MI SE OF US 277, Taylor, TX

Built 1959 Load: 23.6 t ADT: 30,796

SH 36

Fair

Over: Draw

4.40 MI SE OF LP 322, Taylor, TX

Built 1945 Load: 23.6 t ADT: 3,789

SH 153

Fair

Over: DRAW

0.35 MI SE OF NOLAN C/L, Taylor, TX

Built 1944 Load: 23.6 t ADT: 2,290

FM 1235

Fair

Over: DRAW

12.50 MI S OF BUS 20, Taylor, TX

Built 1956 Load: 23.6 t ADT: 429

FM 1235

Fair

Over: DRAW

7.55 MI S OF BUS 20, Taylor, TX

Built 1957 Load: 23.6 t ADT: 307

FM 1235

Fair

Over: DRAW

8.00 MI S OF BUS 20, Taylor, TX

Built 1957 Load: 23.6 t ADT: 307

FM 1235

Fair

Over: DRAW

8.45 MI S OF BUS 20, Taylor, TX

Built 1957 Load: 23.6 t ADT: 307

FM 89

Fair

Over: ELM CREEK

3.65 MI E OF US 277, Taylor, TX

Built 1969 Load: 23.6 t ADT: 332

FM 126

Fair

Over: DRAW

5.95 MI S OF FM 1085, Taylor, TX

Built 1954 Load: 23.6 t ADT: 135

FM 126

Fair

Over: MULBERRY CREEK

1.90 MI S OF FM 1085, Taylor, TX

Built 1954 Load: 23.6 t ADT: 135

FM 126

Fair

Over: NUBIA CREEK

3.00 MI S OF FM 1085, Taylor, TX

Built 1954 Load: 23.6 t ADT: 135

FM 614

Fair

Over: DRAW

1.85 MI W OF US 84, Taylor, TX

Built 1962 Load: 23.6 t ADT: 144

FM 614

Fair

Over: NORTH JIM NED CREEK

0.30 MI W OF US 84, Taylor, TX

Built 1968 Load: 23.6 t ADT: 144

FM 382

Fair

Over: RED BANK CREEK

2.55 MI S OF FM 614, Taylor, TX

Built 1959 Load: 23.6 t ADT: 225

FM 1085

Fair

Over: NOODLE CREEK

0.90 MI S OF IH 20, Taylor, TX

Built 1954 Load: 23.6 t ADT: 130

FM 1085

Fair

Over: DRAW

5.15 MI S OF IH 20, Taylor, TX

Built 1959 Load: 23.6 t ADT: 100

LOOP 322

Fair

Over: RAINY CREEK RELIEF

0.75 MI S OF IH 20, Taylor, TX

Built 1963 Load: 23.6 t ADT: 10,939

LOOP 322

Fair

Over: DRAINAGE DITCH

5.30 MI S OF IH 20, Taylor, TX

Built 1969 Load: 23.6 t ADT: 11,437

LOOP 322 E FRTG RD

Fair

Over: DRAINAGE DITCH

5.30 MI S OF IH 20, Taylor, TX

Built 1981 Load: 23.6 t ADT: 5,800

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial