Millard County, UT

72 public highway bridges

Millard County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Millard County, Utah contains 72 public highway bridges. Roughly 9.7% are rated “Good,” 43.1% “Fair,” and 1.4% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

72
Total Bridges
9.7%
Good
43.1%
Fair
1.4%
Poor Condition

Condition Distribution

Good
9.7% (7)
Fair
43.1% (31)
Poor
1.4% (1)

All Bridges (72)

SR-125

Fair

Over: CENTRAL UTAH WATER CANAL

1.3 MI.SO.of LEAMINGTON, Millard, UT

Built 1955 Load: 38.9 t ADT: 365

I-15 (SR-15)NB&SB

Fair

Over: CHALK CREEK OVERFLOW CH.

0.4 MI.SO.NO.FILLMORE INT, Millard, UT

Built 1972 Load: 38.9 t ADT: 24,744

US-6 (SR-6)

Fair

Over: DELTA-MELVILLE IRR.CANAL

5.2 MILES NE.OF DELTA, Millard, UT

Built 1973 Load: 40.8 t ADT: 2,935

US-6, (SR-6)

Fair

Over: SEVIER RIVER

3.0 Miles West of Delta, Millard, UT

Built 2005 Load: 41.5 t ADT: 3,910

SR-132

Fair

Over: SEVIER RIVER

2.8 MILES EAST OF LYNNDYL, Millard, UT

Built 1958 Load: 42.1 t ADT: 1,684

COUNTY ROAD

Fair

Over: SEVIER RIVER

1 MILE SOUTH OF LYNNDYL, Millard, UT

Built 1976 Load: 44.4 t ADT: 38

I-15 (SR-15) SBL

Fair

Over: DEER CROSSING

1 MILE SOUTH OF SCIPIO, Millard, UT

Built 1978 Load: 44.4 t ADT: 19,660

SR-257

Fair

Over: SEVIER RIVER

IN TOWN OF DESERET, Millard, UT

Built 1985 Load: 45.4 t ADT: 1,704

I-15 (SR-15) NBL

Fair

Over: DEER CROSSING

1 MILE SOUTH OF SCIPIO, Millard, UT

Built 1978 Load: 46.3 t ADT: 19,660

I-15 (SR-15)NB&SB

Fair

Over: SCIPIO VALLEY DRAINAGE

0.2 MILES SOUTH OF SCIPIO, Millard, UT

Built 1978 Load: 47.3 t ADT: 19,660

SR-100

Fair

Over: CHALK CREEK

50 WEST 400 NO. FILLMORE, Millard, UT

Built 1988 Load: 65.1 t ADT: 1,289

I-15 SB

Fair

Over: Wildlife Crossing

I-15 over Wildlife Cross., Millard, UT

Built 2021 Load: 90.7 t ADT: 20,000

I-15 NB

Fair

Over: Wildlife Crossing

I-15 over Wildlife Cross., Millard, UT

Built 2021 Load: 94.0 t ADT: 20,000

2000 W. ROAD-CO

Fair

Over: WOODROW CANAL

2400 N.2000 W.DELTA AREA, Millard, UT

Built 1985 Load: 96.6 t ADT: 50

COUNTY ROAD

Good

Over: CENTRAL UTAH CANAL

1 MILE SE. OF LEAMINGTON, Millard, UT

Built 1996 Load: 18.1 t ADT: 38

3000 W. COUNTY RD

Good

Over: ABRAHAM CANAL

50 S. 3000 W., DELTA, Millard, UT

Built 1993 Load: 32.7 t ADT: 252

COUNTY ROAD

Good

Over: SCIPIO LAKE DAM SPILLWAY

WEST END OF SCIPIO LK.DAM, Millard, UT

Built 1989 Load: 33.7 t ADT: 13

COUNTY ROAD

Good

Over: SEVIER RIVER

NORTH SIDE OF LEAMINGTON, Millard, UT

Built 1996 Load: 37.9 t ADT: 38

US-6, (SR-6)

Good

Over: DESERET CANAL

3.3 Miles West of Delta, Millard, UT

Built 2005 Load: 38.9 t ADT: 3,910

COUNTY ROAD

Good

Over: D.M.A.D. RESERVOIR CANAL

50 W.SHEPARD LN.,(750 N.), Millard, UT

Built 1996 Load: 46.0 t ADT: 252

SR-21

Good

Over: TUNNEL SPRING MTNS. WASH

28 MILES SE.OF GARRISON, Millard, UT

Built 1975 Load: 96.6 t ADT: 231

COUNTY ROAD

Poor

Over: CENTRAL UTAH CANAL

2 MILES SW. OF LEAMINGTON, Millard, UT

Built 1935 Load: 1.3 t ADT: 38
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.