La Crosse County, WI

250 public highway bridges

La Crosse County Bridge Snapshot

La Crosse County, Wisconsin contains 250 public highway bridges in the FHWA National Bridge Inventory. Roughly 30% are rated “Good,” 44% “Fair,” 5.6% “Poor,” and 5.6% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in WI are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

250
Total Bridges
30%
Good
5.6%
Poor
5.6%
Structurally Deficient

Condition Distribution

Good
30% (75)
Fair
44% (110)
Poor
5.6% (14)
SD
5.6% (14)

All Bridges (250)

IH 90 WB

Fair

Over: FISH CREEK

5.3M W JCT STH 27 TO N, La Crosse, WI

Built 1968 Load: 32.4 t ADT: 12,150

IH 90/BUOL ROAD

Fair

Over: BR LA CROSSE RIVER

0.8M E JCT CTH C TO N, La Crosse, WI

Built 1969 Load: 32.4 t ADT: 13,650

CTH GI (DEAD END)

Fair

Over: RUNNING SLOUGH

0.3M W JCT STH 35, La Crosse, WI

Built 1978 Load: 32.4 t ADT: 640

LRD SWAMP RD

Fair

Over: BOSTWICK CREEK

0.8M W JCT CTH M, La Crosse, WI

Built 1982 Load: 32.4 t ADT: 146

STH 16

Fair

Over: MILLER COULEE/PED. TRAIL

1.2M E JCT STH 35, La Crosse, WI

Built 1981 Load: 32.4 t ADT: 15,850

LRD KLOSS RD (DEAD

Fair

Over: ST JOSEPH COULEE CREEK

0.2M E JCT CTH M, La Crosse, WI

Built 1985 Load: 32.4 t ADT: 21

USH 53-COPELAND AV

Fair

Over: LA CROSSE RIVER

0.8M N JCT USH 14, La Crosse, WI

Built 1987 Load: 32.4 t ADT: 25,300

STH 162

Fair

Over: BURNS CREEK

1.5M N JCT CTH EE, La Crosse, WI

Built 1987 Load: 32.4 t ADT: 1,300

LRD NAKOMIS AVE (D

Fair

Over: BLACK RIVER SLOUGH

0.6M N JCT CTH B, La Crosse, WI

Built 1987 Load: 32.4 t ADT: 500

USH 53

Fair

Over: SANDLAKE COULEE CREEK

0.5 M N JCT CTH OT, La Crosse, WI

Built 1989 Load: 32.4 t ADT: 13,700

LRD GATEWAY ACCESS

Fair

Over: BN RR

0.6M S JCT CTH B, La Crosse, WI

Built 1989 Load: 32.4 t ADT: 5,000

LRD HAGEN RD

Fair

Over: PAMMEL CREEK

0.1M S JCT STH 33, La Crosse, WI

Built 1991 Load: 32.4 t ADT: 2,700

STH 108

Fair

Over: WET COULEE CREEK

0.2M S JCT CTH DE, La Crosse, WI

Built 1992 Load: 32.4 t ADT: 2,100

IH 90 WB

Fair

Over: MISSISSIPPI RIVER

AT MINN/WISC STATE LINE, La Crosse, WI

Built 2016 Load: 32.4 t ADT: 13,950

STH 16

Fair

Over: BIG CREEK

0.2M E JCT CTH J, La Crosse, WI

Built 1941 Load: 32.4 t ADT: 4,200

CTH P

Fair

Over: BERGE COULEE CREEK

0.2M N JCT CTH P, La Crosse, WI

Built 1983 Load: 32.4 t ADT: 510

LRD NO 4 RD

Fair

Over: PETTIBONE SLOUGH

0.2M E JCT USH 14, La Crosse, WI

Built 1931 Load: 32.4 t ADT: 1,065

LRD WENZEL ROAD (D

Fair

Over: FLEMING CREEK

0.2M N JCT CTH T, La Crosse, WI

Built 1980 Load: 32.4 t ADT: 25

IH 90 EB

Fair

Over: FISH CREEK

4.2M E JCT STH 162 TO N, La Crosse, WI

Built 1968 Load: 34.0 t ADT: 12,150

STH 16

Fair

Over: BNSF RR

1.3M E JCT STH 35, La Crosse, WI

Built 1981 Load: 34.0 t ADT: 31,700

STH 35

Fair

Over: MORMON CREEK

0.6M N JCT CTH K, La Crosse, WI

Built 1991 Load: 34.0 t ADT: 8,900

CTH C

Fair

Over: NESHONIC CREEK

2.6M N JCT CTH C, La Crosse, WI

Built 1992 Load: 34.0 t ADT: 580

LRD OLD TOWN HALL

Fair

Over: MORMON CREEK

0.7M E JCT STH 35, La Crosse, WI

Built 1991 Load: 34.0 t ADT: 2,345

CTH J

Fair

Over: FISH CREEK

0.7M S JCT CTH Y, La Crosse, WI

Built 1981 Load: 34.0 t ADT: 367

CTH T

Fair

Over: SAUR CREEK

0.2M W JCT CTH V, La Crosse, WI

Built 1978 Load: 34.0 t ADT: 1,500

IH 90 EB REST AREA

Fair

Over: FRENCH SLOUGH

1.0M E MINN STATE LINE, La Crosse, WI

Built 1976 Load: 35.6 t ADT: 13,950

CTH M

Fair

Over: MILWAUKEE ROAD RR

0.3M N JCT CTH C TO E, La Crosse, WI

Built 1990 Load: 35.6 t ADT: 4,522

CTH U

Fair

Over: FISH CREEK

0.3M W JCT CTH J, La Crosse, WI

Built 1988 Load: 35.6 t ADT: 1,600

CTH B

Fair

Over: LACROSSE RIVER

0.2M W JCT STH 16, La Crosse, WI

Built 1991 Load: 35.6 t ADT: 7,400

LRD LARSON RD (DEA

Fair

Over: BOSTWICK CREEK

0.1M E JCT CTH I, La Crosse, WI

Built 1989 Load: 35.6 t ADT: 20

CTH JB

Fair

Over: DUTCH CREEK

1.3M S JCT STH 162, La Crosse, WI

Built 1977 Load: 35.6 t ADT: 76

CTH YY

Fair

Over: MORMON CREEK

0.6M N JCT USH 14, La Crosse, WI

Built 1972 Load: 37.3 t ADT: 649

STH 33 - STATE ST

Fair

Over: BN RR

1.4M E JCT STH 35, La Crosse, WI

Built 1983 Load: 37.3 t ADT: 12,400

LRD GILLS COULEE R

Fair

Over: GILLS COULEE CREEK

2.0M W JCT CTH M, La Crosse, WI

Built 1987 Load: 37.3 t ADT: 88

LRD PLEASANT VALLE

Fair

Over: PLEASANT VALLEY CREEK

1.0M E JCT CTH M, La Crosse, WI

Built 1983 Load: 37.3 t ADT: 50

LRD SMITH VALLEY R

Fair

Over: SMITH VALLEY CREEK

0.3M S JCT CTH B, La Crosse, WI

Built 1987 Load: 37.3 t ADT: 300

LRD BLOOMER MILL R

Fair

Over: MORMON CREEK

0.1M S JCT USH 14, La Crosse, WI

Built 1987 Load: 37.3 t ADT: 550

CTH MM

Fair

Over: MORMON CREEK

0.6M E JCT USH 14, La Crosse, WI

Built 1988 Load: 37.3 t ADT: 979

CTH B

Fair

Over: SMITH VALLEY CREEK

1.1M E JCT STH 16, La Crosse, WI

Built 1990 Load: 37.3 t ADT: 3,400

USH 14W/USH 61N-ST

Fair

Over: MISSISSIPPI RIVER 06

1.3M W JCT USH 53 TO N, La Crosse, WI

Built 1992 Load: 37.3 t ADT: 7,550

CTH D

Fair

Over: GAVIN COULEE

2.1M W JCT STH 108, La Crosse, WI

Built 1980 Load: 37.3 t ADT: 850

CTH HD

Fair

Over: HALFWAY CREEK

1.1M N JCT STH 35 TO N, La Crosse, WI

Built 1990 Load: 38.9 t ADT: 11,200

LRD MARCOU ROAD (D

Fair

Over: BR LACROSSE RIVER

0.6M N JCT CTH OS, La Crosse, WI

Built 1989 Load: 38.9 t ADT: 65

CTH JB

Fair

Over: DUTCH CREEK TRIBUTARY

1.0M N JCT STH 33, La Crosse, WI

Built 1998 Load: 38.9 t ADT: 98

CTH C

Fair

Over: BURR OAK CREEK

0.8M N JCT CTH A, La Crosse, WI

Built 1932 Load: 38.9 t ADT: 2,000

CTH V

Fair

Over: SOUR CREEK

1.7M E JCT CTH TT, La Crosse, WI

Built 1974 Load: 38.9 t ADT: 383

CTH II

Fair

Over: DUTCH CREEK

0.6M S JCT STH 162, La Crosse, WI

Built 1978 Load: 38.9 t ADT: 214

USH 14-USH 61-STH

Fair

Over: PAMMEL CREEK/BNSF RR

2.5M E JCT STH 35 TO N, La Crosse, WI

Built 1981 Load: 40.5 t ADT: 19,200

CTH M

Fair

Over: PLEASANT VALLEY CREEK

0.4M N JCT CTH B TO E, La Crosse, WI

Built 1990 Load: 40.5 t ADT: 5,100

STH 162

Fair

Over: DUTCH CREEK

0.8M N JCT STH 33 TO E, La Crosse, WI

Built 1990 Load: 42.1 t ADT: 1,600

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial