FHWA NBI 2024 Inspection record Public-domain dataset

IRR BIA RTE 31

Carrying IRR BIA RTE 31 over SOUTHERN PACIFIC RR

IN FORT YUMA SUB-AGENCY, Yuma, Arizona

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
10 t Inventory load rating

Bridge Snapshot: IRR BIA RTE 31

The IRR BIA RTE 31 bridge in Yuma, Arizona carries IRR BIA RTE 31 over SOUTHERN PACIFIC RR. It was built in 1965, making it 61 years old today. The structure is built primarily of steel and spans 3 sections, stretching 35.9 meters (118 feet) end to end. Daily traffic averages 3,550 vehicles, placing it in the moderately-trafficked tier of Arizona bridges. It is owned and maintained by Bureau of Indian Affairs.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 10.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IRR BIA RTE 31 compares

▼ 37.3
Load rating vs Arizona average (47.4 t)
Bottom 1%
Lower load rating than 99% of Arizona bridges
176
Bridges in Yuma · 3 in Poor condition
IRR BIA RTE 31 10.1 t
Arizona average 47.4 t

Live comparison across Arizona.

Historical Sufficiency Rating

PlainBridge-computed
2.0 / 100 - historical under-20 band
Structural adequacy /55
0.0
Serviceability /30
2.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
10.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1965
Material
Steel
Number of Spans
3
Structure Length
35.9 m (118 ft)
Deck Width
10.2 m (33 ft)
Owner
Bureau of Indian Affairs
Avg Daily Traffic
3,550 vehicles/day
Structure Number
00000000000H050

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

IRR BIA RTE 31 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare IRR BIA RTE 31 against other structures in Yuma and across Arizona. Arizona bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IRR BIA RTE 31?

IRR BIA RTE 31 in Yuma, Arizona has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is IRR BIA RTE 31 inspected?

IRR BIA RTE 31's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,550 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IRR BIA RTE 31 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IRR BIA RTE 31?

IRR BIA RTE 31 has an NBI inventory load rating of 10.1 metric tons.

Who is responsible for maintaining IRR BIA RTE 31?

IRR BIA RTE 31 is owned and maintained by Bureau of Indian Affairs.

How old is IRR BIA RTE 31 and does age affect safety?

IRR BIA RTE 31 was built in 1965, making it 61 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.