FHWA NBI 2024 Inspection record Public-domain dataset

SH 200

Carrying SH 200 over STRONG CREEK;E.HOPE BR.

IN EAST HOPE, Bonner, Idaho

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
35 t Inventory load rating

Bridge Snapshot: SH 200

The SH 200 bridge in Bonner, Idaho carries SH 200 over STRONG CREEK;E.HOPE BR.. It was built in 1975, making it 51 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 15.2 meters (50 feet) end to end. Daily traffic averages 2,900 vehicles, placing it in the moderately-trafficked tier of Idaho bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 34.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SH 200 compares

▲ 3.2
Load rating vs Idaho average (31.3 t)
Top 33%
Higher load rating than 67% of Idaho bridges
47
Bridges in Bonner · 2 in Poor condition
SH 200 34.5 t
Idaho average 31.3 t

Live comparison across Idaho.

Historical Sufficiency Rating

PlainBridge-computed
93.6 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
24.0
Essentiality /15
14.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
34.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1975
Material
Prestressed Concrete
Number of Spans
1
Structure Length
15.2 m (50 ft)
Deck Width
12.6 m (41 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,900 vehicles/day
Structure Number
000000000019055

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether SH 200 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SH 200 against other structures in Bonner and across Idaho. Idaho bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SH 200?

SH 200 in Bonner, Idaho has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SH 200 inspected?

SH 200's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,900 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SH 200 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SH 200?

SH 200 has an NBI inventory load rating of 34.5 metric tons.

Who is responsible for maintaining SH 200?

SH 200 is owned and maintained by State Highway Agency.

How old is SH 200 and does age affect safety?

SH 200 was built in 1975, making it 51 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.