FHWA NBI 2024 Inspection record Public-domain dataset

ON TSR 350

Carrying ON TSR 350 over KISHACOQUILLAS CREEK

BELLEVILLE, Mifflin, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
45 t Inventory load rating

Bridge Snapshot: ON TSR 350

The ON TSR 350 bridge in Mifflin, Pennsylvania carries ON TSR 350 over KISHACOQUILLAS CREEK. It was built in 1941, making it 85 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 17.7 meters (58 feet) end to end. Daily traffic averages 741 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 44.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ON TSR 350 compares

▲ 5.2
Load rating vs Pennsylvania average (39.3 t)
Top 28%
Higher load rating than 72% of Pennsylvania bridges
129
Bridges in Mifflin · 9 in Poor condition
ON TSR 350 44.5 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
70.1 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
13.2
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
44.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1941
Material
Concrete
Number of Spans
2
Structure Length
17.7 m (58 ft)
Deck Width
9.8 m (32 ft)
Owner
State Highway Agency
Avg Daily Traffic
741 vehicles/day
Structure Number
000000000026587

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether ON TSR 350 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ON TSR 350 against other structures in Mifflin and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ON TSR 350?

ON TSR 350 in Mifflin, Pennsylvania has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is ON TSR 350 inspected?

ON TSR 350's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 741 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ON TSR 350 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ON TSR 350?

ON TSR 350 has an NBI inventory load rating of 44.5 metric tons.

Who is responsible for maintaining ON TSR 350?

ON TSR 350 is owned and maintained by State Highway Agency.

How old is ON TSR 350 and does age affect safety?

ON TSR 350 was built in 1941, making it 85 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.