FHWA NBI 2024 Inspection record Public-domain dataset

RAMPJ&D-1TOI95SB

Carrying RAMPJ&D-1TOI95SB over FILL MATERIAL

00.10FR1/00.20TO95SB, Fairfax, Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
55 t Inventory load rating

Bridge Snapshot: RAMPJ&D-1TOI95SB

The RAMPJ&D-1TOI95SB bridge in Fairfax, Virginia carries RAMPJ&D-1TOI95SB over FILL MATERIAL. It was built in 2008, making it 18 years old today. The structure is built primarily of prestressed concrete continuous and spans 7 sections, stretching 129.5 meters (425 feet) end to end. Daily traffic averages 2,000 vehicles, placing it in the moderately-trafficked tier of Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 7/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 54.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RAMPJ&D-1TOI95SB compares

▲ 8.5
Load rating vs Virginia average (46.0 t)
Top 29%
Higher load rating than 71% of Virginia bridges
751
Bridges in Fairfax · 4 in Poor condition
RAMPJ&D-1TOI95SB 54.5 t
Virginia average 46.0 t

Live comparison across Virginia.

Historical Sufficiency Rating

PlainBridge-computed
97.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
12.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
54.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2008
Material
Prestressed Concrete Continuous
Number of Spans
7
Structure Length
129.5 m (425 ft)
Deck Width
14.6 m (48 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,000 vehicles/day
Structure Number
000000000027099

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether RAMPJ&D-1TOI95SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RAMPJ&D-1TOI95SB against other structures in Fairfax and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RAMPJ&D-1TOI95SB?

RAMPJ&D-1TOI95SB in Fairfax, Virginia has a deck rating of 8/9, superstructure rating of 7/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is RAMPJ&D-1TOI95SB inspected?

RAMPJ&D-1TOI95SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RAMPJ&D-1TOI95SB is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RAMPJ&D-1TOI95SB?

RAMPJ&D-1TOI95SB has an NBI inventory load rating of 54.5 metric tons.

Who is responsible for maintaining RAMPJ&D-1TOI95SB?

RAMPJ&D-1TOI95SB is owned and maintained by State Highway Agency.

How old is RAMPJ&D-1TOI95SB and does age affect safety?

RAMPJ&D-1TOI95SB was built in 2008, making it 18 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.