FHWA NBI 2024 Inspection record Public-domain dataset

SR2182 SB

Carrying SR2182 SB over HORSEPEN CREEK

0.7 M. N. SR2179, Guilford, North Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
45 t Inventory load rating

Bridge Snapshot: SR2182 SB

The SR2182 SB bridge in Guilford, North Carolina carries SR2182 SB over HORSEPEN CREEK. It was built in 2019, making it 7 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 48.7 meters (160 feet) end to end. Daily traffic averages 8,000 vehicles, placing it in the moderately-trafficked tier of North Carolina bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 45.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR2182 SB compares

▲ 1.1
Load rating vs North Carolina average (44.2 t)
Top 38%
Higher load rating than 62% of North Carolina bridges
736
Bridges in Guilford · 22 in Poor condition
SR2182 SB 45.3 t
North Carolina average 44.2 t

Live comparison across North Carolina.

Historical Sufficiency Rating

PlainBridge-computed
79.6 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
13.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
45.3 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2019
Material
Prestressed Concrete
Number of Spans
3
Structure Length
48.7 m (160 ft)
Deck Width
11.8 m (39 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
8,000 vehicles/day
Structure Number
000000000811287

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SR2182 SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR2182 SB against other structures in Guilford and across North Carolina. North Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR2182 SB?

SR2182 SB in Guilford, North Carolina has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR2182 SB inspected?

SR2182 SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 8,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR2182 SB is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR2182 SB?

SR2182 SB has an NBI inventory load rating of 45.3 metric tons.

Who is responsible for maintaining SR2182 SB?

SR2182 SB is owned and maintained by City/Municipal Highway Agency.

How old is SR2182 SB and does age affect safety?

SR2182 SB was built in 2019, making it 7 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.