FHWA NBI 2024 Inspection record Public-domain dataset

MCDONOUGH PARKWAY

Carrying MCDONOUGH PARKWAY over NS RAILROAD

MCDONOUGH, Henry, Georgia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
27 t Inventory load rating

Bridge Snapshot: MCDONOUGH PARKWAY

The MCDONOUGH PARKWAY bridge in Henry, Georgia carries MCDONOUGH PARKWAY over NS RAILROAD. It was built in 2010, making it 16 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 59.7 meters (196 feet) end to end. Daily traffic averages 4,588 vehicles, placing it in the moderately-trafficked tier of Georgia bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 27.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MCDONOUGH PARKWAY compares

▼ 6.9
Load rating vs Georgia average (34.1 t)
Bottom 41%
Lower load rating than 59% of Georgia bridges
142
Bridges in Henry · 2 in Poor condition
MCDONOUGH PARKWAY 27.2 t
Georgia average 34.1 t

Live comparison across Georgia.

Historical Sufficiency Rating

PlainBridge-computed
94.3 / 100 - historical 80–100 band
Structural adequacy /55
51.1
Serviceability /30
30.0
Essentiality /15
13.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
27.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2010
Material
Prestressed Concrete
Number of Spans
3
Structure Length
59.7 m (196 ft)
Deck Width
26.3 m (86 ft)
Owner
County Highway Agency
Avg Daily Traffic
4,588 vehicles/day
Structure Number
000000015151130

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether MCDONOUGH PARKWAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MCDONOUGH PARKWAY against other structures in Henry and across Georgia. Georgia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MCDONOUGH PARKWAY?

MCDONOUGH PARKWAY in Henry, Georgia has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is MCDONOUGH PARKWAY inspected?

MCDONOUGH PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,588 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MCDONOUGH PARKWAY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MCDONOUGH PARKWAY?

MCDONOUGH PARKWAY has an NBI inventory load rating of 27.2 metric tons.

Who is responsible for maintaining MCDONOUGH PARKWAY?

MCDONOUGH PARKWAY is owned and maintained by County Highway Agency.

How old is MCDONOUGH PARKWAY and does age affect safety?

MCDONOUGH PARKWAY was built in 2010, making it 16 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.