FHWA NBI 2026 Inspection record Public-domain dataset

ENTRANCE TO MALL

Carrying ENTRANCE TO MALL over UNNAMED STREAM

MASHANTUCKET PEQUOT RESER, New London, Connecticut

FHWA NBI inspection record for this structure. Condition ratings, inventory load rating, span, deck width, and average daily traffic refresh annually with each NBI release.

Fair
44 t Inventory load rating

Bridge Snapshot: ENTRANCE TO MALL

The ENTRANCE TO MALL bridge in New London, Connecticut carries ENTRANCE TO MALL over UNNAMED STREAM. It was built in 2006, making it 20 years old today. The structure is built primarily of steel and spans 1 section, stretching 27.4 meters (90 feet) end to end. Daily traffic averages 1,000 vehicles, placing it in the lower-traffic tier of Connecticut bridges. It is owned and maintained by Indian Tribal Government, the entity responsible for routine inspections and any needed repairs.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9 on the 0–9 NBI scale, where 9 is excellent and 0 is failed. The weakest component sits in fair condition, which drives the overall status of this bridge. No major component scores in the poor range, so the bridge is not classified as structurally deficient under federal criteria. Its NBI inventory load rating is 43.5 metric tons — the load level the structure is rated to carry at inventory (long-term) level.

In a county that maintains hundreds of NBI-tracked bridges, ENTRANCE TO MALL is one data point in a Connecticut inventory that FHWA inspects on a two-year cycle (more often when ratings fall). Bridge age alone is not a reliable safety signal — a 20-era structure can outperform a newer one when maintenance is consistent, materials are sound, and traffic loads stay within design limits. Use the condition ratings above, the sufficiency score, and the structurally-deficient flag together to read the bridge's real status, and check the linked county and state pages to see how this bridge ranks against its peers.

Every figure on this page comes directly from the Federal Highway Administration National Bridge Inventory (NBI), the public dataset that catalogs more than 617,000 highway bridges across the United States and is updated annually from the records that each state Department of Transportation submits to the FHWA. The condition codes use the standardized FHWA Recording and Coding Guide, the same scale that determines federal eligibility for the Highway Bridge Program and the Surface Transportation Block Grant set-aside for off-system bridges. A "structurally deficient" classification under those federal criteria is a maintenance and funding flag, never a closure order; states keep deficient bridges open with load posting, weight limits, or accelerated inspection cycles until rehabilitation or replacement is funded. See our methodology for refresh cadence and the exact NBI release vintage powering each record.

How ENTRANCE TO MALL compares

▼ 1.4
Load rating vs Connecticut average (44.9 t)
Top 41%
Higher load rating than 59% of Connecticut bridges
431
Bridges in New London · 16 structurally deficient
ENTRANCE TO MALL 43.5 t
Connecticut average 44.9 t

NBI inventory load rating (metric tons) and structural-deficiency status compared across Connecticut, computed live from the FHWA NBI.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
43.5 t
NBI inventory level (metric tons)
SD Status
Not SD

Ratings are on a 0–9 scale: 9 = Excellent, 7–8 = Good, 5–6 = Fair, 3–4 = Poor, 0–2 = Critical/Failed. Sufficiency rating (0–100) combines structural adequacy, functional obsolescence, and essentiality.

Structural Details

Year Built
2006
Material
Steel
Number of Spans
1
Structure Length
27.4 m (90 ft)
Deck Width
8.0 m (26 ft)
Owner
Indian Tribal Government
Avg Daily Traffic
1,000 vehicles/day
Structure Number
0000S50020T1121

Location

MASHANTUCKET PEQUOT RESER, New London, Connecticut
41.469619, -71.960119
View on Google Maps ↗

Data Source

Data from the FHWA National Bridge Inventory (NBI). Bridge inspections are required every two years by federal law. Conditions reflect the most recent inspection.

FHWA NBI Program ↗

Condition Analysis

Built in 2006, this bridge is 20 years old. It carries approximately 1,000 vehicles per day. Based on the most recent FHWA inspection:

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

Its NBI inventory load rating reflects the load level it is rated to carry.

Frequently Asked Questions

What do the condition ratings mean for ENTRANCE TO MALL?

Bridge condition ratings use a 0–9 scale set by the Federal Highway Administration (FHWA). Ratings 7–9 indicate good condition with no significant problems. Ratings 5–6 mean fair condition with minor issues. Ratings 3–4 indicate poor condition requiring repair. Ratings 0–2 are critical, meaning the bridge has serious structural problems. ENTRANCE TO MALL in New London, Connecticut has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9.

How often is ENTRANCE TO MALL inspected?

Federal law requires most highway bridges to be inspected at least every 24 months. Bridges in poor condition or with known issues may be inspected more frequently (every 12 months or less). ENTRANCE TO MALL is part of the National Bridge Inventory maintained by the FHWA. With 1,000 vehicles crossing daily, regular inspection is essential.

What does "structurally deficient" mean for a bridge?

A structurally deficient bridge has at least one major component (deck, superstructure, or substructure) rated 4 or below on the FHWA 0–9 scale. This classification does NOT mean the bridge is unsafe for travel — it means the bridge needs repair, rehabilitation, or eventual replacement. Structurally deficient bridges remain open and are monitored. ENTRANCE TO MALL is not classified as structurally deficient.

What is the inventory load rating for ENTRANCE TO MALL?

The NBI inventory rating is the load level a bridge is rated to carry for an indefinite period, recorded in metric tons. A lower number means the structure is more load-restricted. ENTRANCE TO MALL has an inventory load rating of 43.5 metric tons. It is distinct from the FHWA sufficiency rating, a separate 0–100 funding-eligibility score that this dataset does not include.

Who is responsible for maintaining ENTRANCE TO MALL?

Bridge ownership and maintenance responsibility varies — bridges may be owned by state DOTs, counties, cities, railroads, or federal agencies. ENTRANCE TO MALL is maintained by Indian Tribal Government. The FHWA oversees the National Bridge Inventory program and sets inspection standards, but day-to-day maintenance falls to the owning agency. If you notice damage or safety concerns, contact your state DOT or call 911 for emergencies.

How old is ENTRANCE TO MALL and does age affect safety?

ENTRANCE TO MALL was built in 2006, making it 20 years old. Bridge age alone does not determine safety — condition depends on materials, design, traffic load, maintenance history, and environmental exposure. Many older bridges remain in good condition due to regular maintenance and reconstruction.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A structurally deficient rating does not mean a bridge is closed or unsafe for travel — it indicates the bridge requires repair or replacement. For current closure or safety information, contact your state DOT.

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial