FHWA NBI 2024 Inspection record Public-domain dataset

SR 38

Carrying SR 38 over STOWERS DITCH

02.29 E US 421, Clinton, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating

Bridge Snapshot: SR 38

The SR 38 bridge in Clinton, Indiana carries SR 38 over STOWERS DITCH. It was built in 1966, making it 60 years old today. It was last reconstructed in 1992, extending its service life. The structure is built primarily of concrete continuous and spans 3 sections, stretching 21.9 meters (72 feet) end to end. Daily traffic averages 253 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 25.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 38 compares

▼ 10.0
Load rating vs Indiana average (35.6 t)
Bottom 14%
Lower load rating than 86% of Indiana bridges
205
Bridges in Clinton · 11 in Poor condition
SR 38 25.6 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
94.2 / 100 - historical 80–100 band
Structural adequacy /55
49.2
Serviceability /30
30.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
25.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1966
Last Reconstructed
1992
Material
Concrete Continuous
Number of Spans
3
Structure Length
21.9 m (72 ft)
Deck Width
12.8 m (42 ft)
Owner
State Highway Agency
Avg Daily Traffic
253 vehicles/day
Structure Number
012690

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 38 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 38 against other structures in Clinton and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 38?

SR 38 in Clinton, Indiana has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 38 inspected?

SR 38's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 253 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 38 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 38?

SR 38 has an NBI inventory load rating of 25.6 metric tons.

Who is responsible for maintaining SR 38?

SR 38 is owned and maintained by State Highway Agency.

How old is SR 38 and does age affect safety?

SR 38 was built in 1966, making it 60 years old and last reconstructed in 1992.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.