FHWA NBI 2024 Inspection record Public-domain dataset

ROUTE 222

Carrying ROUTE 222 over LEADMINE BROOK

0.2 MI NORTH THOMASTON TL, Litchfield, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
71 t Inventory load rating

Bridge Snapshot: ROUTE 222

The ROUTE 222 bridge in Litchfield, Connecticut carries ROUTE 222 over LEADMINE BROOK. It was built in 1960, making it 66 years old today. It was last reconstructed in 2008, extending its service life. The structure is built primarily of steel and spans 5 sections, stretching 107.3 meters (352 feet) end to end. Daily traffic averages 850 vehicles, placing it in the lower-traffic tier of Connecticut bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 71.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ROUTE 222 compares

▲ 26.4
Load rating vs Connecticut average (44.9 t)
Top 9%
Higher load rating than 91% of Connecticut bridges
466
Bridges in Litchfield · 34 in Poor condition
ROUTE 222 71.3 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
90.2 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
20.9
Essentiality /15
14.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
71.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1960
Last Reconstructed
2008
Material
Steel
Number of Spans
5
Structure Length
107.3 m (352 ft)
Deck Width
9.6 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
850 vehicles/day
Structure Number
01847

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether ROUTE 222 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ROUTE 222 against other structures in Litchfield and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ROUTE 222?

ROUTE 222 in Litchfield, Connecticut has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is ROUTE 222 inspected?

ROUTE 222's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 850 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ROUTE 222 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ROUTE 222?

ROUTE 222 has an NBI inventory load rating of 71.3 metric tons.

Who is responsible for maintaining ROUTE 222?

ROUTE 222 is owned and maintained by State Highway Agency.

How old is ROUTE 222 and does age affect safety?

ROUTE 222 was built in 1960, making it 66 years old and last reconstructed in 2008.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.