FHWA NBI 2024 Inspection record Public-domain dataset

C1144/FOOTHILL RD

Carrying C1144/FOOTHILL RD over ROCK CREEK

0.1 M N.OF S.ROCK CR RD, Baker, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
26 t Inventory load rating

Bridge Snapshot: C1144/FOOTHILL RD

The C1144/FOOTHILL RD bridge in Baker, Oregon carries C1144/FOOTHILL RD over ROCK CREEK. It was built in 1991, making it 35 years old today. It was last reconstructed in 1992, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 9.4 meters (31 feet) end to end. Daily traffic averages 37 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 25.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How C1144/FOOTHILL RD compares

▼ 6.7
Load rating vs Oregon average (32.3 t)
Bottom 37%
Lower load rating than 63% of Oregon bridges
188
Bridges in Baker · 13 in Poor condition
C1144/FOOTHILL RD 25.6 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
56.6 / 100 - historical 50–79.9 band
Structural adequacy /55
24.2
Serviceability /30
26.0
Essentiality /15
14.4
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
25.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1991
Last Reconstructed
1992
Material
Steel
Number of Spans
1
Structure Length
9.4 m (31 ft)
Deck Width
6.1 m (20 ft)
Owner
County Highway Agency
Avg Daily Traffic
37 vehicles/day
Structure Number
01C033114400039

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

C1144/FOOTHILL RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare C1144/FOOTHILL RD against other structures in Baker and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for C1144/FOOTHILL RD?

C1144/FOOTHILL RD in Baker, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is C1144/FOOTHILL RD inspected?

C1144/FOOTHILL RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 37 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. C1144/FOOTHILL RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for C1144/FOOTHILL RD?

C1144/FOOTHILL RD has an NBI inventory load rating of 25.6 metric tons.

Who is responsible for maintaining C1144/FOOTHILL RD?

C1144/FOOTHILL RD is owned and maintained by County Highway Agency.

How old is C1144/FOOTHILL RD and does age affect safety?

C1144/FOOTHILL RD was built in 1991, making it 35 years old and last reconstructed in 1992.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.