FHWA NBI 2024 Inspection record Public-domain dataset

ROUTE 40 SB

Carrying ROUTE 40 SB over AMTRAK RAILROAD

0.5 MILES N OF I-91, New Haven, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
42 t Inventory load rating

Bridge Snapshot: ROUTE 40 SB

The ROUTE 40 SB bridge in New Haven, Connecticut carries ROUTE 40 SB over AMTRAK RAILROAD. It was built in 1971, making it 55 years old today. The structure is built primarily of steel and spans 3 sections, stretching 37.2 meters (122 feet) end to end. Daily traffic averages 23,200 vehicles, placing it in the heavily-trafficked tier of Connecticut bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 41.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ROUTE 40 SB compares

▼ 3.2
Load rating vs Connecticut average (44.9 t)
Top 45%
Higher load rating than 55% of Connecticut bridges
891
Bridges in New Haven · 23 in Poor condition
ROUTE 40 SB 41.7 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
77.2 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
22.0
Essentiality /15
12.2
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
41.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1971
Material
Steel
Number of Spans
3
Structure Length
37.2 m (122 ft)
Deck Width
12.6 m (41 ft)
Owner
State Highway Agency
Avg Daily Traffic
23,200 vehicles/day
Structure Number
03410

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

ROUTE 40 SB is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare ROUTE 40 SB against other structures in New Haven and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ROUTE 40 SB?

ROUTE 40 SB in New Haven, Connecticut has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is ROUTE 40 SB inspected?

ROUTE 40 SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 23,200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ROUTE 40 SB is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ROUTE 40 SB?

ROUTE 40 SB has an NBI inventory load rating of 41.7 metric tons.

Who is responsible for maintaining ROUTE 40 SB?

ROUTE 40 SB is owned and maintained by State Highway Agency.

How old is ROUTE 40 SB and does age affect safety?

ROUTE 40 SB was built in 1971, making it 55 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.