FHWA NBI 2026 Inspection record Public-domain dataset

ROUTE 2A

Carrying ROUTE 2A over GALLIVAN LANE

0.5 MI E OF I-395, New London, Connecticut

FHWA NBI inspection record for this structure. Condition ratings, inventory load rating, span, deck width, and average daily traffic refresh annually with each NBI release.

Fair
21 t Inventory load rating

Bridge Snapshot: ROUTE 2A

The ROUTE 2A bridge in New London, Connecticut carries ROUTE 2A over GALLIVAN LANE. It was built in 1967, making it 59 years old today. It was last reconstructed in 1996, extending its service life. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 51.0 meters (167 feet) end to end. Daily traffic averages 29,700 vehicles, placing it in the heavily-trafficked tier of Connecticut bridges. It is owned and maintained by State Highway Agency, the entity responsible for routine inspections and any needed repairs.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9 on the 0–9 NBI scale, where 9 is excellent and 0 is failed. The weakest component sits in fair condition, which drives the overall status of this bridge. No major component scores in the poor range, so the bridge is not classified as structurally deficient under federal criteria. Its NBI inventory load rating is 20.7 metric tons — the load level the structure is rated to carry at inventory (long-term) level.

In a county that maintains hundreds of NBI-tracked bridges, ROUTE 2A is one data point in a Connecticut inventory that FHWA inspects on a two-year cycle (more often when ratings fall). Bridge age alone is not a reliable safety signal — a 59-era structure can outperform a newer one when maintenance is consistent, materials are sound, and traffic loads stay within design limits. Use the condition ratings above, the sufficiency score, and the structurally-deficient flag together to read the bridge's real status, and check the linked county and state pages to see how this bridge ranks against its peers.

Every figure on this page comes directly from the Federal Highway Administration National Bridge Inventory (NBI), the public dataset that catalogs more than 617,000 highway bridges across the United States and is updated annually from the records that each state Department of Transportation submits to the FHWA. The condition codes use the standardized FHWA Recording and Coding Guide, the same scale that determines federal eligibility for the Highway Bridge Program and the Surface Transportation Block Grant set-aside for off-system bridges. A "structurally deficient" classification under those federal criteria is a maintenance and funding flag, never a closure order; states keep deficient bridges open with load posting, weight limits, or accelerated inspection cycles until rehabilitation or replacement is funded. See our methodology for refresh cadence and the exact NBI release vintage powering each record.

How ROUTE 2A compares

▼ 24.2
Load rating vs Connecticut average (44.9 t)
Bottom 2%
Lower load rating than 98% of Connecticut bridges
431
Bridges in New London · 16 structurally deficient
ROUTE 2A 20.7 t
Connecticut average 44.9 t

NBI inventory load rating (metric tons) and structural-deficiency status compared across Connecticut, computed live from the FHWA NBI.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
20.7 t
NBI inventory level (metric tons)
SD Status
Not SD

Ratings are on a 0–9 scale: 9 = Excellent, 7–8 = Good, 5–6 = Fair, 3–4 = Poor, 0–2 = Critical/Failed. Sufficiency rating (0–100) combines structural adequacy, functional obsolescence, and essentiality.

Structural Details

Year Built
1967
Last Reconstructed
1996
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
51.0 m (167 ft)
Deck Width
30.9 m (101 ft)
Owner
State Highway Agency
Avg Daily Traffic
29,700 vehicles/day
Structure Number
03423

Location

0.5 MI E OF I-395, New London, Connecticut
41.485333, -72.105108
View on Google Maps ↗

Data Source

Data from the FHWA National Bridge Inventory (NBI). Bridge inspections are required every two years by federal law. Conditions reflect the most recent inspection.

FHWA NBI Program ↗

Condition Analysis

Built in 1967, this bridge is 59 years old and was last reconstructed in 1996. It carries approximately 29,700 vehicles per day. Based on the most recent FHWA inspection:

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

Its NBI inventory load rating reflects the load level it is rated to carry.

Frequently Asked Questions

What do the condition ratings mean for ROUTE 2A?

Bridge condition ratings use a 0–9 scale set by the Federal Highway Administration (FHWA). Ratings 7–9 indicate good condition with no significant problems. Ratings 5–6 mean fair condition with minor issues. Ratings 3–4 indicate poor condition requiring repair. Ratings 0–2 are critical, meaning the bridge has serious structural problems. ROUTE 2A in New London, Connecticut has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9.

How often is ROUTE 2A inspected?

Federal law requires most highway bridges to be inspected at least every 24 months. Bridges in poor condition or with known issues may be inspected more frequently (every 12 months or less). ROUTE 2A is part of the National Bridge Inventory maintained by the FHWA. With 29,700 vehicles crossing daily, regular inspection is essential.

What does "structurally deficient" mean for a bridge?

A structurally deficient bridge has at least one major component (deck, superstructure, or substructure) rated 4 or below on the FHWA 0–9 scale. This classification does NOT mean the bridge is unsafe for travel — it means the bridge needs repair, rehabilitation, or eventual replacement. Structurally deficient bridges remain open and are monitored. ROUTE 2A is not classified as structurally deficient.

What is the inventory load rating for ROUTE 2A?

The NBI inventory rating is the load level a bridge is rated to carry for an indefinite period, recorded in metric tons. A lower number means the structure is more load-restricted. ROUTE 2A has an inventory load rating of 20.7 metric tons. It is distinct from the FHWA sufficiency rating, a separate 0–100 funding-eligibility score that this dataset does not include.

Who is responsible for maintaining ROUTE 2A?

Bridge ownership and maintenance responsibility varies — bridges may be owned by state DOTs, counties, cities, railroads, or federal agencies. ROUTE 2A is maintained by State Highway Agency. The FHWA oversees the National Bridge Inventory program and sets inspection standards, but day-to-day maintenance falls to the owning agency. If you notice damage or safety concerns, contact your state DOT or call 911 for emergencies.

How old is ROUTE 2A and does age affect safety?

ROUTE 2A was built in 1967, making it 59 years old. Bridge age alone does not determine safety — condition depends on materials, design, traffic load, maintenance history, and environmental exposure. Many older bridges remain in good condition due to regular maintenance and reconstruction. This bridge was last reconstructed in 1996.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A structurally deficient rating does not mean a bridge is closed or unsafe for travel — it indicates the bridge requires repair or replacement. For current closure or safety information, contact your state DOT.

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial