I384 RAMP & KEENEY
Carrying I384 RAMP & KEENEY over HOP BROOK
I-384 WB EXIT 2 OFF RAMP, Hartford, Connecticut
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: I384 RAMP & KEENEY
The I384 RAMP & KEENEY bridge in Hartford, Connecticut carries I384 RAMP & KEENEY over HOP BROOK. It was built in 1968, making it 58 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 10,500 vehicles, placing it in the heavily-trafficked tier of Connecticut bridges. It is owned and maintained by State Highway Agency.
The latest FHWA inspection records show culvert at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 99.9 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How I384 RAMP & KEENEY compares
Live comparison across Connecticut.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1968
- Material
- Concrete Continuous
- Number of Spans
- 3
- Structure Length
- 9.8 m (32 ft)
- Deck Width
- 163.2 m (535 ft)
- Owner
- State Highway Agency
- Avg Daily Traffic
- 10,500 vehicles/day
- Structure Number
- 03579
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether I384 RAMP & KEENEY is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare I384 RAMP & KEENEY against other structures in Hartford and across Connecticut. Connecticut bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for I384 RAMP & KEENEY?
I384 RAMP & KEENEY in Hartford, Connecticut on the FHWA's 0–9 scale.
How often is I384 RAMP & KEENEY inspected?
I384 RAMP & KEENEY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,500 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. I384 RAMP & KEENEY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for I384 RAMP & KEENEY?
I384 RAMP & KEENEY has an NBI inventory load rating of 99.9 metric tons.
Who is responsible for maintaining I384 RAMP & KEENEY?
I384 RAMP & KEENEY is owned and maintained by State Highway Agency.
How old is I384 RAMP & KEENEY and does age affect safety?
I384 RAMP & KEENEY was built in 1968, making it 58 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.