FHWA NBI 2024 Inspection record Public-domain dataset

HUMPHREY STREET

Carrying HUMPHREY STREET over MILL RIVER

0.1 MI E OF I-91, New Haven, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
40 t Inventory load rating

Bridge Snapshot: HUMPHREY STREET

The HUMPHREY STREET bridge in New Haven, Connecticut carries HUMPHREY STREET over MILL RIVER. It was built in 1908, making it 118 years old today. It was last reconstructed in 1973, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 25.9 meters (85 feet) end to end. Daily traffic averages 4,100 vehicles, placing it in the moderately-trafficked tier of Connecticut bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 40.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HUMPHREY STREET compares

▼ 4.7
Load rating vs Connecticut average (44.9 t)
Top 48%
Higher load rating than 52% of Connecticut bridges
891
Bridges in New Haven · 23 in Poor condition
HUMPHREY STREET 40.2 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
68.4 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
27.0
Essentiality /15
14.4
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
40.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1908
Last Reconstructed
1973
Material
Prestressed Concrete
Number of Spans
3
Structure Length
25.9 m (85 ft)
Deck Width
18.4 m (60 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
4,100 vehicles/day
Structure Number
03813

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates poor at 4/9, advanced deterioration that should be prioritized for repair.

How to read this record

HUMPHREY STREET is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare HUMPHREY STREET against other structures in New Haven and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HUMPHREY STREET?

HUMPHREY STREET in New Haven, Connecticut has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is HUMPHREY STREET inspected?

HUMPHREY STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HUMPHREY STREET is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HUMPHREY STREET?

HUMPHREY STREET has an NBI inventory load rating of 40.2 metric tons.

Who is responsible for maintaining HUMPHREY STREET?

HUMPHREY STREET is owned and maintained by City/Municipal Highway Agency.

How old is HUMPHREY STREET and does age affect safety?

HUMPHREY STREET was built in 1908, making it 118 years old and last reconstructed in 1973.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.