FHWA NBI 2024 Inspection record Public-domain dataset

CHAPEL STREET

Carrying CHAPEL STREET over METRO NORTH

100 FT EAST OF STATE ST., New Haven, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating

Bridge Snapshot: CHAPEL STREET

The CHAPEL STREET bridge in New Haven, Connecticut carries CHAPEL STREET over METRO NORTH. It was built in 1994, making it 32 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 40.5 meters (133 feet) end to end. Daily traffic averages 7,700 vehicles, placing it in the moderately-trafficked tier of Connecticut bridges. It is owned and maintained by Unknown.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 25.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CHAPEL STREET compares

▼ 19.0
Load rating vs Connecticut average (44.9 t)
Bottom 7%
Lower load rating than 93% of Connecticut bridges
891
Bridges in New Haven · 23 in Poor condition
CHAPEL STREET 25.9 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
68.5 / 100 - historical 50–79.9 band
Structural adequacy /55
49.6
Serviceability /30
7.0
Essentiality /15
13.9
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
25.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1994
Material
Prestressed Concrete
Number of Spans
3
Structure Length
40.5 m (133 ft)
Deck Width
22.7 m (74 ft)
Owner
Unknown
Avg Daily Traffic
7,700 vehicles/day
Structure Number
03872

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether CHAPEL STREET is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CHAPEL STREET against other structures in New Haven and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CHAPEL STREET?

CHAPEL STREET in New Haven, Connecticut has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CHAPEL STREET inspected?

CHAPEL STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 7,700 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CHAPEL STREET is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CHAPEL STREET?

CHAPEL STREET has an NBI inventory load rating of 25.9 metric tons.

Who is responsible for maintaining CHAPEL STREET?

CHAPEL STREET is owned and maintained by Unknown.

How old is CHAPEL STREET and does age affect safety?

CHAPEL STREET was built in 1994, making it 32 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.