FHWA NBI 2024 Inspection record Public-domain dataset

HWY 200

Carrying HWY 200 over SMALL STREAM

05.2 MI S MONROE SCL, Lane, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
25 t Inventory load rating

Bridge Snapshot: HWY 200

The HWY 200 bridge in Lane, Oregon carries HWY 200 over SMALL STREAM. It was built in 1959, making it 67 years old today. The structure is built primarily of concrete and spans 1 section, stretching 6.7 meters (22 feet) end to end. Daily traffic averages 1,376 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 3/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 25.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HWY 200 compares

▼ 7.0
Load rating vs Oregon average (32.3 t)
Bottom 36%
Lower load rating than 64% of Oregon bridges
1,010
Bridges in Lane · 13 in Poor condition
HWY 200 25.3 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
35.0 / 100 - historical 20–49.9 band
Structural adequacy /55
8.8
Serviceability /30
13.4
Essentiality /15
12.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
3/9
Poor (1–4)
Inventory Load Rating
25.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1959
Material
Concrete
Number of Spans
1
Structure Length
6.7 m (22 ft)
Deck Width
9.6 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,376 vehicles/day
Structure Number
04040 200 00543

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates poor at 3/9, advanced deterioration that should be prioritized for repair.

How to read this record

HWY 200 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare HWY 200 against other structures in Lane and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY 200?

HWY 200 in Lane, Oregon has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 3/9 on the FHWA's 0–9 scale.

How often is HWY 200 inspected?

HWY 200's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,376 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY 200 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY 200?

HWY 200 has an NBI inventory load rating of 25.3 metric tons.

Who is responsible for maintaining HWY 200?

HWY 200 is owned and maintained by State Highway Agency.

How old is HWY 200 and does age affect safety?

HWY 200 was built in 1959, making it 67 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.