FHWA NBI 2024 Inspection record Public-domain dataset

HWY 222

Carrying HWY 222 over WILLAMETTE RIVER

02.8 MI N HWY 018 JCT, Lane, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
16 t Inventory load rating

Bridge Snapshot: HWY 222

The HWY 222 bridge in Lane, Oregon carries HWY 222 over WILLAMETTE RIVER. It was built in 1952, making it 74 years old today. The structure is built primarily of steel and spans 2 sections, stretching 227.7 meters (747 feet) end to end. Daily traffic averages 5,100 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 15.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HWY 222 compares

▼ 16.4
Load rating vs Oregon average (32.3 t)
Bottom 10%
Lower load rating than 90% of Oregon bridges
1,010
Bridges in Lane · 13 in Poor condition
HWY 222 15.9 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
41.2 / 100 - historical 20–49.9 band
Structural adequacy /55
23.2
Serviceability /30
7.0
Essentiality /15
11.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
15.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1952
Material
Steel
Number of Spans
2
Structure Length
227.7 m (747 ft)
Deck Width
9.1 m (30 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,100 vehicles/day
Structure Number
04117A222 00520

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether HWY 222 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HWY 222 against other structures in Lane and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY 222?

HWY 222 in Lane, Oregon has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is HWY 222 inspected?

HWY 222's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY 222 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY 222?

HWY 222 has an NBI inventory load rating of 15.9 metric tons.

Who is responsible for maintaining HWY 222?

HWY 222 is owned and maintained by State Highway Agency.

How old is HWY 222 and does age affect safety?

HWY 222 was built in 1952, making it 74 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.