FHWA NBI 2024 Inspection record Public-domain dataset

FOREST ROAD 62

Carrying FOREST ROAD 62 over WOLF CREEK

3 MI EAST OF SH 108, Mono, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
24 t Inventory load rating

Bridge Snapshot: FOREST ROAD 62

The FOREST ROAD 62 bridge in Mono, California carries FOREST ROAD 62 over WOLF CREEK. It was built in 1979, making it 47 years old today. It was last reconstructed in 1988, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 10.4 meters (34 feet) end to end. Daily traffic averages 20 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 24.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FOREST ROAD 62 compares

▼ 7.0
Load rating vs California average (31.3 t)
Bottom 19%
Lower load rating than 81% of California bridges
49
Bridges in Mono · 6 in Poor condition
FOREST ROAD 62 24.3 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
46.1 / 100 - historical 20–49.9 band
Structural adequacy /55
22.5
Serviceability /30
11.0
Essentiality /15
12.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
24.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Last Reconstructed
1988
Material
Steel
Number of Spans
1
Structure Length
10.4 m (34 ft)
Deck Width
4.1 m (13 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
20 vehicles/day
Structure Number
041702000001063

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

FOREST ROAD 62 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FOREST ROAD 62 against other structures in Mono and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FOREST ROAD 62?

FOREST ROAD 62 in Mono, California has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is FOREST ROAD 62 inspected?

FOREST ROAD 62's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FOREST ROAD 62 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FOREST ROAD 62?

FOREST ROAD 62 has an NBI inventory load rating of 24.3 metric tons.

Who is responsible for maintaining FOREST ROAD 62?

FOREST ROAD 62 is owned and maintained by U.S. Forest Service.

How old is FOREST ROAD 62 and does age affect safety?

FOREST ROAD 62 was built in 1979, making it 47 years old and last reconstructed in 1988.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.