ROUTE 72
Carrying ROUTE 72 over ROUTE 177
AT EXIT 1, Hartford, Connecticut
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: ROUTE 72
The ROUTE 72 bridge in Hartford, Connecticut carries ROUTE 72 over ROUTE 177. It was built in 1980, making it 46 years old today. The structure is built primarily of steel continuous. Daily traffic averages 14,400 vehicles, placing it in the heavily-trafficked tier of Connecticut bridges.
The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. All reported major components score above the Poor range.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How ROUTE 72 compares
Live comparison across Connecticut.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1980
- Material
- Steel Continuous
- Avg Daily Traffic
- 14,400 vehicles/day
- Structure Number
- 04315
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether ROUTE 72 is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare ROUTE 72 against other structures in Hartford and across Connecticut. Connecticut bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for ROUTE 72?
ROUTE 72 in Hartford, Connecticut on the FHWA's 0–9 scale.
How often is ROUTE 72 inspected?
ROUTE 72's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 14,400 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. ROUTE 72 is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for ROUTE 72?
An inventory load rating is not recorded for ROUTE 72.
Who is responsible for maintaining ROUTE 72?
Ownership is not specified for ROUTE 72 in the NBI.
How old is ROUTE 72 and does age affect safety?
ROUTE 72 was built in 1980, making it 46 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.