FHWA NBI 2024 Inspection record Public-domain dataset

ROUTE 127

Carrying ROUTE 127 over PEQUONNOCK RIVER

0.4 MI N OF ROUTE 15, Fairfield, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
43 t Inventory load rating

Bridge Snapshot: ROUTE 127

The ROUTE 127 bridge in Fairfield, Connecticut carries ROUTE 127 over PEQUONNOCK RIVER. It was built in 1980, making it 46 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 28.7 meters (94 feet) end to end. Daily traffic averages 11,400 vehicles, placing it in the heavily-trafficked tier of Connecticut bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 42.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ROUTE 127 compares

▼ 2.0
Load rating vs Connecticut average (44.9 t)
Top 42%
Higher load rating than 58% of Connecticut bridges
840
Bridges in Fairfield · 30 in Poor condition
ROUTE 127 42.9 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
78.0 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
13.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
42.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1980
Material
Prestressed Concrete
Number of Spans
1
Structure Length
28.7 m (94 ft)
Deck Width
21.1 m (69 ft)
Owner
State Highway Agency
Avg Daily Traffic
11,400 vehicles/day
Structure Number
04331

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether ROUTE 127 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ROUTE 127 against other structures in Fairfield and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ROUTE 127?

ROUTE 127 in Fairfield, Connecticut has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is ROUTE 127 inspected?

ROUTE 127's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,400 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ROUTE 127 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ROUTE 127?

ROUTE 127 has an NBI inventory load rating of 42.9 metric tons.

Who is responsible for maintaining ROUTE 127?

ROUTE 127 is owned and maintained by State Highway Agency.

How old is ROUTE 127 and does age affect safety?

ROUTE 127 was built in 1980, making it 46 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.