FHWA NBI 2024 Inspection record Public-domain dataset

BLAIN ROAD

Carrying BLAIN ROAD over FRENCH RIVER

200 FEET WEST OF ROUTE 12, Windham, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
48 t Inventory load rating

Bridge Snapshot: BLAIN ROAD

The BLAIN ROAD bridge in Windham, Connecticut carries BLAIN ROAD over FRENCH RIVER. It was built in 1940, making it 86 years old today. It was last reconstructed in 1972, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 13.1 meters (43 feet) end to end. Daily traffic averages 1,230 vehicles, placing it in the moderately-trafficked tier of Connecticut bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 48.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BLAIN ROAD compares

▲ 3.2
Load rating vs Connecticut average (44.9 t)
Top 31%
Higher load rating than 69% of Connecticut bridges
264
Bridges in Windham · 22 in Poor condition
BLAIN ROAD 48.1 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
76.8 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
10.0
Essentiality /15
14.8
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
48.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1940
Last Reconstructed
1972
Material
Prestressed Concrete
Number of Spans
1
Structure Length
13.1 m (43 ft)
Deck Width
6.7 m (22 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
1,230 vehicles/day
Structure Number
04794

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether BLAIN ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BLAIN ROAD against other structures in Windham and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BLAIN ROAD?

BLAIN ROAD in Windham, Connecticut has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is BLAIN ROAD inspected?

BLAIN ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,230 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BLAIN ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BLAIN ROAD?

BLAIN ROAD has an NBI inventory load rating of 48.1 metric tons.

Who is responsible for maintaining BLAIN ROAD?

BLAIN ROAD is owned and maintained by Town/Township Highway Agency.

How old is BLAIN ROAD and does age affect safety?

BLAIN ROAD was built in 1940, making it 86 years old and last reconstructed in 1972.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.